Davis-Bacon Wage Determinations — Pennington, South Dakota
Pennington has 4 active Davis-Bacon wage determinations. Select a construction type to view trade rates and fringe benefit requirements.
Quick Answer
Davis-Bacon prevailing wage determinations for Pennington, South Dakota cover 4 construction types: Building, Heavy, Highway and Residential. Each determination sets the minimum base hourly wage and fringe benefits per trade classification for federal construction projects in the county. Select a construction type below for the full trade-by-trade rate table.
building
Active
WD: SD20260029-14656-bld Rev. 1
Effective: May 17, 2026
View trade rates →
heavy
Active
WD: SD20260001-14656-hvy Rev. 2
Effective: May 20, 2026
View trade rates →
highway
Active
WD: SD20260001-14656-hwy Rev. 2
Effective: May 20, 2026
View trade rates →
residential
Active
WD: SD20260002-14656-res Rev. 1
Effective: May 17, 2026
View trade rates →
Top-Paying Trades in Pennington
Highest Davis-Bacon total packages (base + fringe) across this county's wage determinations. Each row shows the construction type that yields the highest rate for that trade.
| # | Trade | Construction Type | Base $/hr | Fringe $/hr | Total Package | |
|---|---|---|---|---|---|---|
| 1 | SPRINKLER FITTER | building | $38.47 | $24.68 | $63.15 | WD → |
| 2 | PIPEFITTER | building | $34.90 | $15.70 | $50.60 | WD → |
| 3 | ELECTRICIAN | highway | $35.43 | $8.69 | $44.12 | WD → |
| 4 | POWER EQUIPMENT OPERATOR: Group 5 | heavy | $34.96 | $8.36 | $43.32 | WD → |
| 5 | POWER EQUIPMENT OPERATOR: Group 5 - Asphalt Plant; Concrete Batch Plant; Backhoes/Excavators over 40 Tons; Cranes/Derricks/Draglines/Pile Drivers/Shov | highway | $34.96 | $8.36 | $43.32 | WD → |
| 6 | TRUCK DRIVER Group 2 | heavy | $32.07 | $8.42 | $40.49 | WD → |
| 7 | TRUCK DRIVER: Group 2 - Semi-Tractor and Trailer; Tandem Truck with Pup or Trailer | heavy | $32.07 | $8.42 | $40.49 | WD → |
| 8 | BRICKLAYER | building | $33.58 | $4.60 | $38.18 | WD → |
| 9 | IRONWORKER, STRUCTURAL | building | $23.91 | $12.05 | $35.96 | WD → |
| 10 | POWER EQUIPMENT OPERATOR: Group 4 - Concrete Paving Fnishing Machine; Asphalt Paving Machine Screed; Asphalt Paving Machine; Cranes/Derricks/Draglines | highway | $32.49 | $0.00 | $32.49 | WD → |
Each wage determination above lists the minimum hourly base rate and required fringe benefits per trade classification. Full Davis-Bacon compliance guide →