Building Construction — Meade, South Dakota

WD SD20260027-14654-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Meade, South Dakota (construction type: building) is $33.58/hr base + $4.60/hr fringe = $38.18/hr total package (WD SD20260027-14654-bld, Rev. 1).

Scroll down for all 18 trade classifications covered by this determination.

WD Number: SD20260027-14654-bld
Revision: 1
Construction Type: building
State: South Dakota (SD)
County: Meade
Effective: May 17, 2026
Trades covered: 18
Official source: SAM.gov reference SD20260027View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $33.58 $4.60 $38.18 +30% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES DRYWALL HANGING AND METAL STUD INSTALLATION, AND FORM WORK $18.67 $0.00 $18.67 Bottom 10% -17% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $19.58 $0.00 $19.58 -10% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER AND METAL STUD INSTALLER $18.19 $0.00 $18.19 Above median -22% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $18.84 $2.42 $21.26 -24% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $17.50 $0.00 $17.50 Above median $0.00 $0.00 $0.00 $0.00
INSULATOR - MECHANICAL $15.20 $0.00 $15.20 Bottom 10% -21% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $23.91 $12.05 $35.96 +44% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $11.66 $1.65 $13.31 Above median -36% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $20.70 $0.00 $20.70 Above median -1% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $17.80 $0.00 $17.80 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, AND SPRAY $18.48 $0.00 $18.48 -17% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $34.90 $15.70 $50.60 +107% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $20.45 $7.83 $28.28 +16% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $13.74 $1.35 $15.09 -35% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $18.68 $3.72 $22.40 -6% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $38.47 $24.68 $63.15 +159% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $15.06 $1.10 $16.16 -41% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Meade, SD — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Meade

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for SD20260027-14654-bld →