Building Construction — Lincoln, South Dakota

WD SD20260026-17127-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Lincoln, South Dakota (construction type: building) is $41.90/hr base + $4.94/hr fringe = $46.84/hr total package (WD SD20260026-17127-bld, Rev. 2).

Scroll down for all 17 trade classifications covered by this determination.

WD Number: SD20260026-17127-bld
Revision: 2
Construction Type: building
State: South Dakota (SD)
County: Lincoln
Effective: May 17, 2026
Trades covered: 17
Official source: SAM.gov reference SD20260026View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $41.90 $4.94 $46.84 +59% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $36.34 $17.15 $53.49 +139% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $17.41 $8.03 $25.44 +14% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $17.54 $2.65 $20.19 -7% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $36.32 $16.83 $53.15 +89% vs market $0.00 $0.00 $0.00 $0.00
INSULATOR - MECHANICAL $15.20 $0.00 $15.20 Bottom 10% -21% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $23.91 $12.05 $35.96 +44% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $16.21 $2.21 $18.42 Above median -12% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $20.96 $0.00 $20.96 Above median +0% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $17.90 $0.00 $17.90 $0.00 $0.00 $0.00 $0.00
PAINTER, EXCLUDES DRYWALL FINISHING/TAPING $20.96 $9.85 $30.81 Top 10% +38% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $34.90 $15.70 $50.60 +107% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $21.12 $9.00 $30.12 +23% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $13.82 $1.34 $15.16 -35% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $19.28 $7.63 $26.91 +12% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $15.06 $1.10 $16.16 -41% vs market $0.00 $0.00 $0.00 $0.00
YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY $56.30 $38.44 $94.74 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Lincoln, SD — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Lincoln

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for SD20260026-17127-bld →