Building Construction — Hutchinson, South Dakota

WD SD20260023-17122-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for $2.00 400' TO 449' - $2.50 450' AND OVER - $3.00 in Hutchinson, South Dakota (construction type: building) is $34.08/hr base + $18.71/hr fringe = $52.79/hr total package (WD SD20260023-17122-bld, Rev. 2).

Scroll down for all 17 trade classifications covered by this determination.

WD Number: SD20260023-17122-bld
Revision: 2
Construction Type: building
State: South Dakota (SD)
County: Hutchinson
Effective: May 17, 2026
Trades covered: 17
Official source: SAM.gov reference SD20260023View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
$2.00 400' TO 449' - $2.50 450' AND OVER - $3.00 $34.08 $18.71 $52.79 Top 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $55.34 $34.03 $89.37 Above median +363% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $38.16 $5.59 $43.75 +49% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $15.96 $4.15 $20.11 -10% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $20.67 $11.85 $32.52 Above median +50% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $36.32 $16.83 $53.15 +89% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $30.80 $15.48 $46.28 Above median +85% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.74 $0.00 $10.74 -49% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $14.19 $0.00 $14.19 Above median -32% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $19.34 $0.00 $19.34 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $20.57 $0.00 $20.57 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, AND SPRAY $18.80 $4.99 $23.79 Above median +6% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $14.02 $1.90 $15.92 -35% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR ( TOWER CRANE): LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE $34.38 $18.71 $53.09 Top 10% +95% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $14.35 $2.14 $16.49 -29% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $20.41 $9.64 $30.05 +26% vs market $0.00 $0.00 $0.00 $0.00
YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY $56.30 $38.44 $94.74 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Hutchinson, SD — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Hutchinson

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for SD20260023-17122-bld →