Building Construction — Dewey, South Dakota

WD SD20260012-14645-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for $2.00 400' TO 449' - $2.50 450' AND OVER - $3.00 in Dewey, South Dakota (construction type: building) is $34.08/hr base + $18.71/hr fringe = $52.79/hr total package (WD SD20260012-14645-bld, Rev. 1).

Scroll down for all 20 trade classifications covered by this determination.

WD Number: SD20260012-14645-bld
Revision: 1
Construction Type: building
State: South Dakota (SD)
County: Dewey
Effective: May 17, 2026
Trades covered: 20
Official source: SAM.gov reference SD20260012View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
$2.00 400' TO 449' - $2.50 450' AND OVER - $3.00 $34.08 $18.71 $52.79 Top 10% $0.00 $0.00 $0.00 $0.00
ACOUSTICAL CEILING MECHANIC $16.68 $0.00 $16.68 Above median $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $55.34 $34.03 $89.37 Above median +363% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $33.58 $4.60 $38.18 +30% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $18.41 $2.17 $20.58 -8% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $33.01 $15.08 $48.09 Above median +122% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $18.50 $4.92 $23.42 -17% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $24.27 $8.06 $32.33 +15% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $30.80 $15.48 $46.28 Above median +85% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.32 $0.00 $12.32 -41% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $14.19 $0.00 $14.19 Above median -32% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $19.34 $0.00 $19.34 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $16.14 $0.00 $16.14 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, AND SPRAY $19.22 $0.00 $19.22 Above median -14% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $34.90 $15.70 $50.60 Above median +107% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR ( TOWER CRANE): LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE $34.38 $18.71 $53.09 Top 10% +95% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $14.52 $2.09 $16.61 -28% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $26.77 $16.36 $43.13 +80% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $38.47 $24.68 $63.15 +159% vs market $0.00 $0.00 $0.00 $0.00
YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY $56.30 $38.44 $94.74 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Dewey, SD — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Dewey

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for SD20260012-14645-bld →