Highway Construction — York, South Carolina

WD SC20260037-16165-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in York, South Carolina (construction type: highway) is $14.44/hr base + $0.00/hr fringe = $14.44/hr total package (WD SC20260037-16165-hwy, Rev. 1).

Scroll down for all 38 trade classifications covered by this determination.

WD Number: SC20260037-16165-hwy
Revision: 1
Construction Type: highway
State: South Carolina (SC)
County: York
Effective: May 17, 2026
Trades covered: 38
Official source: SAM.gov reference SC20260037View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $14.44 $0.00 $14.44 -39% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $12.64 $0.00 $12.64 -45% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $15.02 $0.00 $15.02 -38% vs market $0.00 $0.00 $0.00 $0.00
LABORER $11.75 $0.00 $11.75 -41% vs market $0.00 $0.00 $0.00 $0.00
LABORER $10.76 $0.00 $10.76 -46% vs market $0.00 $0.00 $0.00 $0.00
LABORER, ASPHALT INCLUDES ASPHALT DISTRIBUTOR, SHOVELER, AND SPREADER $11.62 $0.00 $11.62 Top 10% -41% vs market $0.00 $0.00 $0.00 $0.00
LABORER, ASPHALT INCLUDES ASPHALT DISTRIBUTOR, SHOVELER, AND SPREADER $11.54 $0.00 $11.54 Bottom 10% -42% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $9.63 $0.00 $9.63 Bottom 10% -52% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $10.05 $0.00 $10.05 -49% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $8.89 $0.00 $8.89 Bottom 10% -55% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $9.87 $0.00 $9.87 -50% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $9.71 $0.00 $9.71 -51% vs market $0.00 $0.00 $0.00 $0.00
LABORER, TRAFFIC CONTROL-FLAGGER $10.62 $0.00 $10.62 Above median -47% vs market $0.00 $0.00 $0.00 $0.00
LABORER, TRAFFIC CONTROL-FLAGGER $10.13 $0.00 $10.13 Bottom 10% -49% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER-CEMENT/CONCRETE $10.40 $0.00 $10.40 Bottom 10% -48% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $13.98 $0.00 $13.98 -30% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $11.84 $0.00 $11.84 Bottom 10% -48% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $11.00 $0.00 $11.00 Bottom 10% -52% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $13.92 $0.00 $13.92 Bottom 10% -39% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $13.82 $0.00 $13.82 Bottom 10% -39% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $12.95 $0.00 $12.95 Bottom 10% -43% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $19.73 $0.00 $19.73 Bottom 10% -14% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $12.62 $0.00 $12.62 Bottom 10% -45% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $13.13 $0.00 $13.13 Bottom 10% -42% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER $16.80 $0.00 $16.80 -26% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MECHANIC $17.75 $0.00 $17.75 -22% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: PAVER $13.61 $0.00 $13.61 -40% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: PAVER $12.93 $0.00 $12.93 Bottom 10% -43% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $12.11 $0.00 $12.11 -47% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER.$ 12.16 0.00 POWER EQUIPMENT OPERATOR: ROLLER $12.59 $0.00 $12.59 -45% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: SCRAPER $12.71 $0.00 $12.71 -44% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: SCREED $13.09 $0.00 $13.09 Bottom 10% -43% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: TRACTOR $13.28 $0.00 $13.28 -42% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $12.70 $0.00 $12.70 -49% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $13.17 $0.00 $13.17 -47% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $12.75 $0.00 $12.75 -49% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $13.36 $0.00 $13.36 -46% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $13.48 $0.00 $13.48 -46% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the York, SC — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in York

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for SC20260037-16165-hwy →