Residential Construction — Williamsburg, South Carolina

WD SC20260053-14616-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Williamsburg, South Carolina (construction type: residential) is $7.25/hr base + $0.00/hr fringe = $7.25/hr total package (WD SC20260053-14616-res, Rev. 1).

Scroll down for all 18 trade classifications covered by this determination.

WD Number: SC20260053-14616-res
Revision: 1
Construction Type: residential
State: South Carolina (SC)
County: Williamsburg
Effective: May 17, 2026
Trades covered: 18
Official source: SAM.gov reference SC20260053View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $7.25 $0.00 $7.25 Bottom 10% -65% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $7.25 $0.00 $7.25 Bottom 10% -69% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $7.25 $0.00 $7.25 Bottom 10% -68% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER $7.25 $0.00 $7.25 Above median $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER $7.25 $0.00 $7.25 Bottom 10% -66% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $7.25 $0.00 $7.25 Bottom 10% -74% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC/DUCT & PIPE $7.25 $0.00 $7.25 Top 10% -73% vs market $0.00 $0.00 $0.00 $0.00
INSULATOR/ASBESTOS WORKER $7.25 $0.00 $7.25 Bottom 10% -67% vs market $0.00 $0.00 $0.00 $0.00
LABORERS $7.25 $0.00 $7.25 Bottom 10% -63% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $7.25 $0.00 $7.25 Bottom 10% -65% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $7.25 $0.00 $7.25 Bottom 10% -73% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $7.25 $0.00 $7.25 Bottom 10% -68% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BACKHOE $7.25 $0.00 $7.25 Bottom 10% -68% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $7.25 $0.00 $7.25 Bottom 10% -67% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $7.25 $0.00 $7.25 Bottom 10% -67% vs market $0.00 $0.00 $0.00 $0.00
SOFT FLOOR LAYER $7.25 $0.00 $7.25 Bottom 10% -61% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $7.25 $0.00 $7.25 Bottom 10% -67% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $7.25 $0.00 $7.25 Bottom 10% -71% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Williamsburg, SC — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Williamsburg

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for SC20260053-14616-res →