Building Construction — Orangeburg, South Carolina

WD SC20260016-14624-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, EXCLUDES FORM WORK in Orangeburg, South Carolina (construction type: building) is $15.45/hr base + $0.00/hr fringe = $15.45/hr total package (WD SC20260016-14624-bld, Rev. 1).

Scroll down for all 11 trade classifications covered by this determination.

WD Number: SC20260016-14624-bld
Revision: 1
Construction Type: building
State: South Carolina (SC)
County: Orangeburg
Effective: May 17, 2026
Trades covered: 11
Official source: SAM.gov reference SC20260016View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, EXCLUDES FORM WORK $15.45 $0.00 $15.45 -34% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $19.99 $4.04 $24.03 -14% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $14.08 $0.00 $14.08 Above median $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.62 $0.55 $11.17 -44% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.50 $1.23 $13.73 -31% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $16.39 $1.83 $18.22 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $13.50 $0.00 $13.50 -35% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $18.95 $3.39 $22.34 Bottom 10% -15% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $16.99 $2.17 $19.16 -27% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $19.15 $1.15 $20.30 -8% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $12.76 $2.04 $14.80 -41% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Orangeburg, SC — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Orangeburg

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for SC20260016-14624-bld →