Highway Construction — Marlboro, South Carolina

WD SC20260039-16200-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Marlboro, South Carolina (construction type: highway) is $14.00/hr base + $0.00/hr fringe = $14.00/hr total package (WD SC20260039-16200-hwy, Rev. 1).

Scroll down for all 41 trade classifications covered by this determination.

WD Number: SC20260039-16200-hwy
Revision: 1
Construction Type: highway
State: South Carolina (SC)
County: Marlboro
Effective: May 17, 2026
Trades covered: 41
Official source: SAM.gov reference SC20260039View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $14.00 $0.00 $14.00 -40% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $13.02 $0.00 $13.02 -43% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $11.63 $0.00 $11.63 -49% vs market $0.00 $0.00 $0.00 $0.00
GUARDRAIL INSTALLER $12.65 $0.00 $12.65 Above median $0.00 $0.00 $0.00 $0.00
GUARDRAIL INSTALLER $12.52 $0.00 $12.52 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $15.64 $0.00 $15.64 -36% vs market $0.00 $0.00 $0.00 $0.00
LABORER $12.47 $0.00 $12.47 -37% vs market $0.00 $0.00 $0.00 $0.00
LABORER $10.93 $0.00 $10.93 -45% vs market $0.00 $0.00 $0.00 $0.00
LABORER $10.96 $0.00 $10.96 -45% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $9.47 $0.00 $9.47 Bottom 10% -52% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $9.39 $0.00 $9.39 Bottom 10% -53% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $9.67 $0.00 $9.67 Bottom 10% -51% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $10.00 $0.00 $10.00 -50% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $9.93 $0.00 $9.93 -50% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $9.55 $0.00 $9.55 Bottom 10% -52% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $9.40 $0.00 $9.40 Bottom 10% -53% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $8.85 $0.00 $8.85 Bottom 10% -55% vs market $0.00 $0.00 $0.00 $0.00
LABORER, TRAFFIC CONTROL-FLAGGER $10.83 $0.00 $10.83 Top 10% -45% vs market $0.00 $0.00 $0.00 $0.00
LABORER, TRAFFIC CONTROL-FLAGGER $10.15 $0.00 $10.15 -49% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $13.87 $0.00 $13.87 -30% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $15.51 $0.00 $15.51 -32% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $15.08 $0.00 $15.08 -34% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $16.25 $0.00 $16.25 -29% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $13.66 $3.40 $17.06 -25% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $20.12 $0.00 $20.12 Bottom 10% -12% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $15.85 $0.00 $15.85 -31% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $16.20 $0.00 $16.20 -29% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER $15.51 $0.00 $15.51 -32% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MECHANIC $18.22 $0.00 $18.22 -20% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: PAVER $13.39 $0.00 $13.39 Bottom 10% -41% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: PAVER $14.58 $0.00 $14.58 -36% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $11.95 $0.00 $11.95 -48% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $11.22 $0.00 $11.22 Bottom 10% -51% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: SCREED $12.45 $0.00 $12.45 Bottom 10% -45% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: TRACTOR $13.26 $0.00 $13.26 -42% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $16.25 $0.00 $16.25 Above median -35% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $11.69 $0.00 $11.69 Bottom 10% -53% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $12.83 $0.00 $12.83 -48% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $14.16 $0.00 $14.16 -43% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $14.19 $0.00 $14.19 -43% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SINGLE AXLE, INCLUDES PILOT CAR $10.83 $0.00 $10.83 Top 10% -57% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Marlboro, SC — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.