Building Construction — Hampton, South Carolina

WD SC20260013-16696-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Hampton, South Carolina (construction type: building) is $16.00/hr base + $0.00/hr fringe = $16.00/hr total package (WD SC20260013-16696-bld, Rev. 1).

Scroll down for all 11 trade classifications covered by this determination.

WD Number: SC20260013-16696-bld
Revision: 1
Construction Type: building
State: South Carolina (SC)
County: Hampton
Effective: May 17, 2026
Trades covered: 11
Official source: SAM.gov reference SC20260013View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $16.00 $0.00 $16.00 -32% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $33.35 $13.40 $46.75 +67% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.42 $0.99 $11.41 -43% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.50 $1.23 $13.73 -31% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $16.95 $1.83 $18.78 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $13.50 $0.00 $13.50 -35% vs market $0.00 $0.00 $0.00 $0.00
PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE $52.08 $38.44 $90.52 $0.00 $0.00 $0.00 $0.00
PIPEFITTER $19.75 $3.96 $23.71 -10% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $17.20 $2.65 $19.85 -25% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $19.15 $1.15 $20.30 -8% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $13.50 $1.27 $14.77 -41% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Hampton, SC — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Hampton

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for SC20260013-16696-bld →