Highway Construction — Edgefield, South Carolina

WD SC20260038-16633-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Edgefield, South Carolina (construction type: highway) is $13.73/hr base + $0.00/hr fringe = $13.73/hr total package (WD SC20260038-16633-hwy, Rev. 1).

Scroll down for all 25 trade classifications covered by this determination.

WD Number: SC20260038-16633-hwy
Revision: 1
Construction Type: highway
State: South Carolina (SC)
County: Edgefield
Effective: May 17, 2026
Trades covered: 25
Official source: SAM.gov reference SC20260038View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $13.73 $0.00 $13.73 -42% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $13.16 $0.00 $13.16 -42% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $15.02 $0.00 $15.02 -38% vs market $0.00 $0.00 $0.00 $0.00
LABORER $11.07 $0.00 $11.07 -44% vs market $0.00 $0.00 $0.00 $0.00
LABORER $10.87 $0.00 $10.87 -45% vs market $0.00 $0.00 $0.00 $0.00
LABORER $14.46 $0.00 $14.46 -27% vs market $0.00 $0.00 $0.00 $0.00
LABORER $10.40 $0.00 $10.40 -48% vs market $0.00 $0.00 $0.00 $0.00
LABORER $11.61 $0.00 $11.61 -42% vs market $0.00 $0.00 $0.00 $0.00
LABORER $9.04 $0.00 $9.04 -54% vs market $0.00 $0.00 $0.00 $0.00
LABORER $11.54 $0.00 $11.54 -42% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $13.28 $0.00 $13.28 -42% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $13.56 $0.00 $13.56 -41% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $12.71 $0.00 $12.71 -44% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $14.09 $0.00 $14.09 -38% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $13.93 $0.00 $13.93 -39% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $11.84 $0.00 $11.84 Bottom 10% -48% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $15.25 $0.00 $15.25 -33% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $11.00 $0.00 $11.00 Bottom 10% -52% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $17.87 $0.00 $17.87 -22% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $18.93 $0.00 $18.93 -17% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $17.38 $0.00 $17.38 -24% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $15.20 $0.00 $15.20 -33% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: (LOADER) $16.31 $0.00 $16.31 Above median -29% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $14.11 $0.00 $14.11 -43% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $12.25 $0.00 $12.25 -51% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Edgefield, SC — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Edgefield

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for SC20260038-16633-hwy →