Building Construction — Darlington, South Carolina

WD SC20260005-14628-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Darlington, South Carolina (construction type: building) is $18.00/hr base + $0.00/hr fringe = $18.00/hr total package (WD SC20260005-14628-bld, Rev. 1).

Scroll down for all 19 trade classifications covered by this determination.

WD Number: SC20260005-14628-bld
Revision: 1
Construction Type: building
State: South Carolina (SC)
County: Darlington
Effective: May 17, 2026
Trades covered: 19
Official source: SAM.gov reference SC20260005View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $18.00 $0.00 $18.00 -14% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK..$ 15.14 3.16 CARPENTER $13.23 $0.02 $13.25 -44% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.63 $0.00 $14.63 -36% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER $16.32 $1.50 $17.82 Above median -17% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $19.71 $1.93 $21.64 Above median -19% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $29.75 $18.00 $47.75 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.79 $1.33 $12.12 -39% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER-BRICK/CONCRETE/CEMENT/STONE..$ 11.00 0.00 LABORER: LANDSCAPE $9.45 $0.49 $9.94 Top 10% -50% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $14.69 $2.08 $16.77 Above median -16% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $16.81 $2.67 $19.48 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $17.07 $2.65 $19.72 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $19.39 $2.02 $21.41 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $17.50 $1.78 $19.28 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $14.18 $1.99 $16.17 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $12.00 $0.00 $12.00 -42% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $36.00 $14.19 $50.19 +90% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $16.86 $0.95 $17.81 -32% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $12.21 $0.00 $12.21 -45% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $14.05 $3.18 $17.23 Above median -31% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Darlington, SC — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Darlington

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for SC20260005-14628-bld →