Residential Construction — Bristol, Rhode Island

WD RI20260002-17734-res · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Bristol, Rhode Island (construction type: residential) is $20.45/hr base + $11.40/hr fringe = $31.85/hr total package (WD RI20260002-17734-res, Rev. 2).

Scroll down for all 18 trade classifications covered by this determination.

WD Number: RI20260002-17734-res
Revision: 2
Construction Type: residential
State: Rhode Island (RI)
County: Bristol
Effective: May 17, 2026
Trades covered: 18
Official source: SAM.gov reference RI20260002View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $20.45 $11.40 $31.85 +19% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $15.32 $9.65 $24.97 -14% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/FINISHER $20.45 $11.40 $31.85 Top 10% +6% vs market $0.00 $0.00 $0.00 $0.00
CREDIT $64.52 $38.44 $102.96 Above median $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $20.55 $8.50 $29.05 Above median $0.00 $0.00 $0.00 $0.00
ELECTRICIAN FOOTNOTE: WORK OF A HAZARDOUS NATURE, OR WHERE THE WORK HEIGHT IS 30 FEET OR MORE FROM THE FLOOR, EXCEPT WHEN WORKING OSHA-APPROVED LIFTS $42.09 $17.92 $60.01 +78% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: CARPET $15.62 $9.65 $25.27 $0.00 $0.00 $0.00 $0.00
INSULATOR - BATT $19.56 $9.65 $29.21 Above median $0.00 $0.00 $0.00 $0.00
INSULATOR - PIPE & PIPEWRAPPER $49.91 $36.63 $86.54 Top 10% $0.00 $0.00 $0.00 $0.00
LABORER $18.47 $8.10 $26.57 -5% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $20.55 $8.50 $29.05 +18% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $13.50 $2.45 $15.95 Bottom 10% $0.00 $0.00 $0.00 $0.00
PLUMBER $23.96 $8.95 $32.91 +6% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $20.27 $8.98 $29.25 Above median -20% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER AND ROLLER A. FOOTNOTES: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOL $39.90 $28.25 $68.15 +86% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: PAVER A. FOOTNOTES: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A. PAI $40.82 $28.25 $69.07 +89% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $47.49 $31.44 $78.93 Top 10% +181% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $24.24 $9.81 $34.05 +10% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Bristol, RI — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Bristol

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for RI20260002-17734-res →