Highway Construction — Toa Baja, Puerto Rico

WD PR20260019-17961-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Toa Baja, Puerto Rico (construction type: highway) is $8.75/hr base + $0.61/hr fringe = $9.36/hr total package (WD PR20260019-17961-hwy, Rev. 1).

Scroll down for all 21 trade classifications covered by this determination.

WD Number: PR20260019-17961-hwy
Revision: 1
Construction Type: highway
State: Puerto Rico (PR)
County: Toa Baja
Effective: May 17, 2026
Trades covered: 21
Official source: SAM.gov reference PR20260019View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $8.75 $0.61 $9.36 Bottom 10% $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $8.60 $0.47 $9.07 Bottom 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $45.80 $19.27 $65.07 Above median $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $8.80 $1.22 $10.02 Bottom 10% $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: LABORER $8.25 $0.56 $8.81 Bottom 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $8.25 $0.57 $8.82 Bottom 10% $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $9.40 $0.61 $10.01 Bottom 10% $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $8.02 $0.57 $8.59 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $10.49 $0.76 $11.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $9.65 $0.73 $10.38 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $10.88 $0.91 $11.79 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $12.11 $0.91 $13.02 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: EQUIPMENT GREASER $9.54 $1.15 $10.69 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $12.53 $1.25 $13.78 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $10.19 $0.94 $11.13 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $10.88 $3.15 $14.03 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $9.67 $3.14 $12.81 $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $8.28 $0.53 $8.81 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $9.81 $0.95 $10.76 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $9.40 $0.85 $10.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: PICKUP TRUCK $9.21 $0.48 $9.69 Bottom 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Toa Baja, PR — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Toa Baja

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for PR20260019-17961-hwy →