Highway Construction — San German, Puerto Rico

WD PR20260022-17874-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in San German, Puerto Rico (construction type: highway) is $8.75/hr base + $0.66/hr fringe = $9.41/hr total package (WD PR20260022-17874-hwy, Rev. 1).

Scroll down for all 20 trade classifications covered by this determination.

WD Number: PR20260022-17874-hwy
Revision: 1
Construction Type: highway
State: Puerto Rico (PR)
County: San German
Effective: May 17, 2026
Trades covered: 20
Official source: SAM.gov reference PR20260022View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $8.75 $0.66 $9.41 Bottom 10% $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $8.52 $0.58 $9.10 Bottom 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $45.80 $19.27 $65.07 Above median $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $10.19 $1.07 $11.26 Bottom 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $8.25 $0.59 $8.84 Bottom 10% $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $8.64 $0.91 $9.55 Bottom 10% $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $8.65 $0.75 $9.40 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $9.62 $0.73 $10.35 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $9.38 $0.65 $10.03 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $10.82 $0.90 $11.72 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $12.11 $0.91 $13.02 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: EQUIPMENT GREASER $9.54 $1.15 $10.69 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $12.53 $1.25 $13.78 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $10.19 $0.94 $11.13 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $10.41 $3.15 $13.56 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $9.31 $3.14 $12.45 $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $8.27 $0.57 $8.84 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $9.81 $0.95 $10.76 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $9.17 $0.60 $9.77 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: PICKUP TRUCK $9.12 $0.46 $9.58 Bottom 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the San German, PR — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in San German

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for PR20260022-17874-hwy →