Heavy Construction — Moca, Puerto Rico

WD PR20260036-17918-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Moca, Puerto Rico (construction type: heavy) is $9.21/hr base + $0.91/hr fringe = $10.12/hr total package (WD PR20260036-17918-hvy, Rev. 1).

Scroll down for all 7 trade classifications covered by this determination.

WD Number: PR20260036-17918-hvy
Revision: 1
Construction Type: heavy
State: Puerto Rico (PR)
County: Moca
Effective: May 17, 2026
Trades covered: 7
Official source: SAM.gov reference PR20260036View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $9.21 $0.91 $10.12 Bottom 10% $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $9.00 $0.83 $9.83 Bottom 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $39.81 $14.62 $54.43 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $8.78 $0.43 $9.21 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $7.25 $0.33 $7.58 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $11.44 $0.87 $12.31 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $10.21 $1.09 $11.30 Bottom 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Moca, PR — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Moca

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for PR20260036-17918-hvy →