Highway Construction — Maricao, Puerto Rico

WD PR20260002-17916-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Maricao, Puerto Rico (construction type: highway) is $7.25/hr base + $0.50/hr fringe = $7.75/hr total package (WD PR20260002-17916-hwy, Rev. 1).

Scroll down for all 27 trade classifications covered by this determination.

WD Number: PR20260002-17916-hwy
Revision: 1
Construction Type: highway
State: Puerto Rico (PR)
County: Maricao
Effective: May 17, 2026
Trades covered: 27
Official source: SAM.gov reference PR20260002View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $7.25 $0.50 $7.75 Bottom 10% $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $7.25 $0.47 $7.72 Bottom 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $7.25 $0.80 $8.05 Bottom 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER $7.25 $0.00 $7.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
LABORERS: (LABORERS) $7.25 $0.43 $7.68 Top 10% $0.00 $0.00 $0.00 $0.00
LABORERS: PIPELAYERS $7.25 $0.00 $7.25 Above median $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION $7.25 $0.00 $7.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION $7.25 $0.84 $8.09 $0.00 $0.00 $0.00 $0.00
PIPEFITTER $7.25 $0.00 $7.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
PLUMBER $7.25 $0.00 $7.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: ASPHALT LUTERS $7.25 $3.11 $10.36 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BACKHOE $8.25 $0.59 $8.84 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BULLDOZER $7.25 $0.99 $8.24 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: CRANE $7.25 $1.43 $8.68 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: DIGGERS $7.25 $0.00 $7.25 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GRADER $7.25 $1.06 $8.31 Above median $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GREASER/OILERS $7.25 $0.00 $7.25 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: LOADERS $7.25 $0.92 $8.17 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: MECHANICS $7.25 $0.76 $8.01 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: PAVER $7.25 $3.15 $10.40 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: ROLLER $7.25 $3.14 $10.39 Bottom 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: SCRAPERS $8.00 $0.59 $8.59 Above median $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: SCRAPERS $7.80 $0.59 $8.39 Above median $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: SCRAPERS $8.10 $0.59 $8.69 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: SCREEDMAN $8.80 $3.13 $11.93 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: TRACTORS: 185 HP AND OVER $8.10 $0.59 $8.69 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $7.25 $0.00 $7.25 Bottom 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Maricao, PR — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Maricao

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for PR20260002-17916-hwy →