Residential Construction — Humacao, Puerto Rico

WD PR20260029-17946-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Humacao, Puerto Rico (construction type: residential) is $8.90/hr base + $0.00/hr fringe = $8.90/hr total package (WD PR20260029-17946-res, Rev. 1).

Scroll down for all 9 trade classifications covered by this determination.

WD Number: PR20260029-17946-res
Revision: 1
Construction Type: residential
State: Puerto Rico (PR)
County: Humacao
Effective: May 17, 2026
Trades covered: 9
Official source: SAM.gov reference PR20260029View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $8.90 $0.00 $8.90 Bottom 10% $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $9.04 $0.00 $9.04 Bottom 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $10.57 $0.64 $11.21 Bottom 10% $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $7.83 $0.65 $8.48 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $12.00 $0.55 $12.55 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER $8.40 $0.00 $8.40 Bottom 10% $0.00 $0.00 $0.00 $0.00
PLUMBER $9.94 $0.56 $10.50 Bottom 10% $0.00 $0.00 $0.00 $0.00
ROOFER $9.05 $0.94 $9.99 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $11.50 $0.53 $12.03 $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Humacao, PR — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Humacao

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for PR20260029-17946-res →