Building Construction — Bayamón, Puerto Rico

WD PR20260001-20023-bld · Revision 0 · Effective Jan 1, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Bayamón, Puerto Rico (construction type: building) is $7.25/hr base + $0.42/hr fringe = $7.67/hr total package (WD PR20260001-20023-bld, Rev. 0).

Scroll down for all 15 trade classifications covered by this determination.

WD Number: PR20260001-20023-bld
Revision: 0
Construction Type: building
State: Puerto Rico (PR)
County: Bayamón
Effective: Jan 1, 2026
Trades covered: 15
Official source: SAM.gov reference PR20260001View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $7.25 $0.42 $7.67 Bottom 10% $0.00 $0.00 $0.00 $0.00
CARPENTER $7.25 $0.34 $7.59 Bottom 10% $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $7.25 $0.31 $7.56 Bottom 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $7.25 $0.00 $7.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER $7.25 $0.00 $7.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
Laborer, Unskilled $7.25 $0.00 $7.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER $7.25 $0.00 $7.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
PIPEFITTER $7.25 $0.00 $7.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
PLUMBER $7.25 $0.31 $7.56 Bottom 10% $0.00 $0.00 $0.00 $0.00
Power equipment operators: Cranes $7.25 $0.00 $7.25 Above median $0.00 $0.00 $0.00 $0.00
Power equipment operators: Diggers $7.25 $0.00 $7.25 Top 10% $0.00 $0.00 $0.00 $0.00
Power equipment operators: Loaders $7.25 $0.26 $7.51 Above median $0.00 $0.00 $0.00 $0.00
Power equipment operators: Traxcavator $7.25 $0.00 $7.25 Top 10% $0.00 $0.00 $0.00 $0.00
Sheet metal worker $7.25 $0.31 $7.56 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $7.25 $0.30 $7.55 Bottom 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Bayamón, PR — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Bayamón

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for PR20260001-20023-bld →