Building Construction — York, Pennsylvania

WD PA20260107-14606-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL in York, Pennsylvania (construction type: building) is $40.00/hr base + $29.81/hr fringe = $69.81/hr total package (WD PA20260107-14606-bld, Rev. 2).

Scroll down for all 45 trade classifications covered by this determination.

WD Number: PA20260107-14606-bld
Revision: 2
Construction Type: building
State: Pennsylvania (PA)
County: York
Effective: May 17, 2026
Trades covered: 45
Official source: SAM.gov reference PA20260107View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL $40.00 $29.81 $69.81 Top 10% +196% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $55.00 $35.48 $90.48 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $33.99 $16.87 $50.86 +57% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $36.84 $20.19 $57.03 +100% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $37.73 $4.59 $42.32 +49% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $23.23 $8.13 $31.36 +9% vs market $0.00 $0.00 $0.00 $0.00
DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING $58.70 $38.44 $97.14 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.31 $23.93 $64.24 Above median +104% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: CARPET ONLY $18.78 $5.02 $23.80 Bottom 10% -3% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: HARDWOOD FLOORS ONLY $26.91 $11.88 $38.79 Bottom 10% +59% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: VINYL FLOORING ONLY $24.67 $11.22 $35.89 +47% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $20.19 $6.92 $27.11 -3% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $30.80 $22.58 $53.38 Top 10% +82% vs market $0.00 $0.00 $0.00 $0.00
LABORER $26.37 $17.18 $43.55 Above median +87% vs market $0.00 $0.00 $0.00 $0.00
LABORER (ASBESTOS ABATEMENT) $27.47 $19.89 $47.36 Above median +103% vs market $0.00 $0.00 $0.00 $0.00
LABORER (COMMON OR GENERAL; CONCRETE WORKER; CONCRETE SAW) $23.01 $17.18 $40.19 +72% vs market $0.00 $0.00 $0.00 $0.00
LABORER (FORKLIFT) $27.87 $17.18 $45.05 Above median +93% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $15.01 $0.00 $15.01 Above median -36% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $43.00 $23.44 $66.44 Above median +121% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $26.47 $12.66 $39.13 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $37.85 $22.72 $60.57 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $25.58 $17.07 $42.65 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADALL $32.70 $18.43 $51.13 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $32.51 $17.98 $50.49 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $27.05 $14.52 $41.57 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $30.39 $15.05 $45.44 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $30.39 $13.72 $44.11 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $26.98 $15.65 $42.63 Above median +77% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER ONLY $25.84 $16.30 $42.14 Bottom 10% +74% vs market $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $36.87 $20.49 $57.36 Bottom 10% $0.00 $0.00 $0.00 $0.00
PIPEFITTER $41.36 $29.45 $70.81 Above median +121% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $27.75 $14.46 $42.21 +32% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $32.25 $21.32 $53.57 Above median +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $36.87 $21.32 $58.19 Above median +107% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $39.42 $29.30 $68.72 Above median +144% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR (BOBCAT/SKID STEER/SKID LOADER; HOIST; FORKLIFT) $44.61 $30.83 $75.44 +168% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR (HOIST, FORKLIFT) $41.88 $30.03 $71.91 Above median +155% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $44.89 $30.92 $75.81 Top 10% +169% vs market $0.00 $0.00 $0.00 $0.00
ROOFER, EXCLUDES WATERPROOFING $24.10 $13.47 $37.57 +59% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: WATERPROOFING ONLY $28.60 $18.02 $46.62 Top 10% +97% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDES HVAC DUCT INSTALLATION FOOTNOTE: PAID HOLIDAY: ELECTION DAY $43.09 $42.52 $85.61 Above median +157% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $49.75 $28.96 $78.71 Above median +146% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $20.65 $8.24 $28.89 +2% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $24.87 $10.14 $35.01 +23% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $29.65 $6.84 $36.49 Top 10% +30% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the York, PA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in York

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for PA20260107-14606-bld →