Building Construction — Potter, Pennsylvania

WD PA20260062-14585-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL in Potter, Pennsylvania (construction type: building) is $33.62/hr base + $18.79/hr fringe = $52.41/hr total package (WD PA20260062-14585-bld, Rev. 2).

Scroll down for all 34 trade classifications covered by this determination.

WD Number: PA20260062-14585-bld
Revision: 2
Construction Type: building
State: Pennsylvania (PA)
County: Potter
Effective: May 17, 2026
Trades covered: 34
Official source: SAM.gov reference PA20260062View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL $33.62 $18.79 $52.41 Bottom 10% +122% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $48.28 $33.17 $81.45 Above median +93% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, INCLUDING POINTING, CAULKING CLEANING AND BRICK REFRACTORY WORK $37.17 $22.94 $60.11 +86% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $34.76 $20.64 $55.40 +95% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $31.97 $21.35 $53.32 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $50.86 $31.78 $82.64 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.48 $26.54 $68.02 Above median +116% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $25.40 $25.47 $50.87 +83% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL, REINFORCING, RIGGER, AND STRUCTURAL $32.29 $32.41 $64.70 Top 10% +65% vs market $0.00 $0.00 $0.00 $0.00
LABORER $25.98 $19.53 $45.51 Above median +95% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDING CEMENT MASON TENDING $18.43 $9.74 $28.17 Top 10% +21% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $23.23 $18.53 $41.76 Above median +79% vs market $0.00 $0.00 $0.00 $0.00
MASON - STONE $34.00 $22.63 $56.63 Above median +146% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $43.00 $23.44 $66.44 Above median +121% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT, ALL TYPES $23.69 $12.97 $36.66 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $36.53 $22.01 $58.54 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $27.95 $16.12 $44.07 Above median +82% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER ONLY $30.56 $23.72 $54.28 Above median +125% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING ONLY $32.39 $23.26 $55.65 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $47.75 $26.55 $74.30 Above median +132% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $40.02 $26.55 $66.57 Above median +108% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $20.97 $10.78 $31.75 Bottom 10% +6% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $40.02 $26.55 $66.57 Above median +108% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR PAVER: ASPHALT, AGGREGATE, AND CONCRETE $36.87 $21.32 $58.19 +107% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, LOADER, CRANE*, BULLDOZER *ADD TO CRANE RATE: BOOMS 101-150 JIBS $36.87 $21.32 $58.19 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: OILER $29.70 $21.32 $51.02 Above median +81% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $32.25 $21.32 $53.57 Above median +90% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $27.00 $12.19 $39.19 +66% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $39.50 $30.79 $70.29 Above median +111% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $30.58 $24.04 $54.62 +64% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $49.75 $28.96 $78.71 Above median +146% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $28.76 $17.16 $45.92 Above median +62% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $35.64 $21.63 $57.27 Above median +102% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $24.98 $12.17 $37.15 Top 10% +32% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Potter, PA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Potter

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for PA20260062-14585-bld →