Heavy Construction — Perry, Pennsylvania
WD PA20260018-14543-hvy · Revision 5 · Effective May 19, 2026
The Davis-Bacon prevailing wage for A LINE DRAWN SOUTH ON U.S. HIGHWYA 220 FROM THE BRADFORD SULLIVAN COUNTY LINE TO THE NORDMONT EMMENS ROAD, AND SOUTH OF THIS ROAD TO THE COLUMBIA COUN in Perry, Pennsylvania (construction type: heavy) is $47.08/hr base + $25.41/hr fringe = $72.49/hr total package (WD PA20260018-14543-hvy, Rev. 5).
Scroll down for all 101 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| A LINE DRAWN SOUTH ON U.S. HIGHWYA 220 FROM THE BRADFORD SULLIVAN COUNTY LINE TO THE NORDMONT EMMENS ROAD, AND SOUTH OF THIS ROAD TO THE COLUMBIA COUN | $47.08 | $25.41 | $72.49 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ADJACENT TO STARTING POINT, FORM SETTERS WAGON DRILL DIAMOND POINT DRILL, GUNITE NOZZLE OPERATORS, WALK BEHIND ROLLERS AND CONCRETE RUBBERS, BLASTER | $30.57 | $19.99 | $50.56 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $55.00 | $35.48 | $90.48 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $32.14 | $17.81 | $49.95 +55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $37.83 | $16.98 | $54.81 Above median +70% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $34.17 | $17.20 | $51.37 +59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $37.07 | $18.82 | $55.89 Above median +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, STONEMASON | $33.99 | $16.87 | $50.86 Bottom 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, STONEMASON | $37.07 | $18.82 | $55.89 Top 10% +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, STONEMASON | $32.66 | $21.58 | $54.24 Top 10% +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $27.03 | $11.43 | $38.46 +35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $36.87 | $20.49 | $57.36 +101% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER & SOFT FLOOR LAYER | $27.03 | $11.43 | $38.46 Bottom 10% +35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER & SOFT FLOOR LAYER | $28.16 | $15.02 | $43.18 Above median +52% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER & SOFT FLOOR LAYER (ADAMS, CUMBERLAND, DAUPHIN, JUNIATA, LEBANON, LANCASTER, AND YORK) | $24.77 | $8.69 | $33.46 Top 10% +17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER & SOFT FLOOR LAYER (BRADFORD, LYCOMING, SULLIVAN, AND TIOGA COUNTIES) | $28.88 | $15.65 | $44.53 Top 10% +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER & SOFT FLOOR LAYER (LACKAWANNA, MONROE, PIKE, SUSQUEHANNA, WAYNE, AND WYOMING COUNTIES) | $25.60 | $12.85 | $38.45 Top 10% +35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER & SOFT FLOOR LAYER (LUZERNE, SULLIVAN, RED ROCK AIR BASE), AND WYOMING COUNTIES) | $28.88 | $15.65 | $44.53 Top 10% +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER (LEHIGH, MONROE, AND NORTHAMPTON COUNTIES) | $32.14 | $24.09 | $56.23 Top 10% +97% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $37.13 | $14.30 | $51.43 Above median +79% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $34.05 | $21.25 | $55.30 Above median +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $34.15 | $20.50 | $54.65 Above median +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER (BERKS) | $35.18 | $24.25 | $59.43 Top 10% +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER (PIKE AND MONROE COUNTIES) | $37.13 | $14.30 | $51.43 Top 10% +79% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CLASSIFICATIONS | $38.26 | $28.46 | $66.72 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CLASSIFICATIONS | $40.73 | $29.18 | $69.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| CLASSIFICATIONS | $45.98 | $30.74 | $76.72 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| COUNTIES | $50.00 | $25.93 | $75.93 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $46.02 | $27.98 | $74.00 Above median +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $40.47 | $26.51 | $66.98 Above median +113% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $38.50 | $26.46 | $64.96 Above median +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (ADAMS AND YORK COUNTIES) | $40.31 | $23.93 | $64.24 Top 10% +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (BERKS COUNTY) | $46.02 | $27.98 | $74.00 Top 10% +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (BRADFORD; LACKAWANNA; LUZERNE; MONROE (BARRETT, COOLBAU | $47.97 | $23.29 | $71.26 Top 10% +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (COLUMBIA; MONTOUR; NORTHUMBERLAND; SCHUYLKILL; SNYDER; AND UNION COUNTIES) | $41.00 | $31.06 | $72.06 Top 10% +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (MONROE, NORTHAMPTON AND PIKE COUNTIES) | $65.43 | $42.20 | $107.63 Top 10% +242% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (NORTHUMBERLAND AND UNION COUNTIES) | $38.50 | $26.46 | $64.96 Top 10% +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: BRADFORD COUNTY (BRADFORD; AND SULLIVAN (THE PORTION WEST OF THE LINE DRAWN SOUTH OF U.S. HIGHWAY #220, FROM BRADFORD-SULLIVAN COUNTY LIN | $40.47 | $26.51 | $66.98 Top 10% +113% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: SULLIVAN COUNTY (BRADFORD; AND SULLIVAN (THE PORTION WEST OF THE LINE DRAWN SOUTH OF U.S. HIGHWAY #220, FROM BRADFORD-SULLIVAN COUNTY LIN | $38.50 | $26.46 | $64.96 Top 10% +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FLOOR LAYER: CARPET | $31.47 | $24.69 | $56.16 Top 10% +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FOOTNOTE: A - PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WOR | $39.13 | $28.73 | $67.86 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| FOOTNOTE: A - PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WOR | $39.59 | $28.85 | $68.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| FOOTNOTE: A - PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WOR | $45.70 | $30.66 | $76.36 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| FOOTNOTE: A - PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WOR | $43.45 | $29.99 | $73.44 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| FOOTNOTE: A - PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WOR | $43.73 | $30.08 | $73.81 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY A | $37.10 | $27.62 | $64.72 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY A | $37.97 | $27.89 | $65.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY A | $38.42 | $28.02 | $66.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY A | $39.57 | $28.34 | $67.91 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY A | $44.54 | $29.82 | $74.36 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY A | $42.29 | $29.15 | $71.44 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY A | $44.82 | $29.90 | $74.72 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY A | $42.57 | $29.24 | $71.81 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $37.26 | $32.63 | $69.89 Above median +79% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: BUILDING | $25.39 | $22.29 | $47.68 Top 10% +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: BUILDING | $21.57 | $15.04 | $36.61 Bottom 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: BUILDING | $23.01 | $17.18 | $40.19 Above median +72% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: BUILDING (CUMBERLAND, DAUPHIN, JUNIATA, NORTHUMBERLAND, PERRY, AND SNYDER COUNTIES) | $20.21 | $12.93 | $33.14 Top 10% +42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: BUILDING (LACKAWANNA, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES) | $24.35 | $21.43 | $45.78 Top 10% +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: BUILDING (LUZERNE, COLUMBIA COUNTIES) | $24.35 | $21.43 | $45.78 Top 10% +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: BUILDING (LUZERNE, SULLIVAN AND WYOMING COUNTIES) | $24.35 | $21.43 | $45.78 Top 10% +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: HEAVY CONSTRUCTION: GROUP 1 FLAG PERSON | $26.61 | $19.99 | $46.60 Top 10% +100% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: HEAVY CONSTRUCTION: GROUP 2 HAZARDOUS/TOXIC/ASBESTOS WASTE HANDLER, LEAD PAINT HANDLER | $33.23 | $19.99 | $53.22 Top 10% +128% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: HEAVY CONSTRUCTION: GROUP 3 CONCRETE PITMAN, PUDDLERS, HIGHWAY GUIDE RAIL RIGHT OF WAY AND PROPERTY FENCE SLAB REINFORCEMENT PLACERS, LABORER | $30.22 | $19.99 | $50.21 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: HEAVY CONSTRUCTION: GROUP 5 FORM SETTER, REINFORCED STEEL PLACER, BONDING ALIGNING AND SECURING AND BURNING AND WELDING IN CONJUNCTION WTH RE | $31.24 | $19.99 | $51.23 Top 10% +120% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: BUILDER (BRADFORD, LYCOMING, MONTOUR, NORTHUMBERLAND, TIOGA, AND UNION COUNTIES) | $20.22 | $12.93 | $33.15 Top 10% +42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE & TILE SETTER | $31.18 | $18.35 | $49.53 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE & TILE SETTER | $32.85 | $17.56 | $50.41 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE & TILE SETTER | $35.13 | $16.52 | $51.65 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE & TILE SETTER | $33.61 | $16.80 | $50.41 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE & TILE SETTER | $31.12 | $21.11 | $52.23 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $34.00 | $17.05 | $51.05 Bottom 10% +70% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT (ADAMS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUANIATA, LACKAWANNA, LANCASTER, LEBANON, LUZERNE, LYCOMING, MONROE, MONTOUR, NORT | $43.00 | $23.44 | $66.44 Top 10% +121% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT (CARBON , LEHIGH AND NORTHAMPTON COUNTIES) | $50.22 | $35.03 | $85.25 Top 10% +183% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MONOGHAM AND FAIRVIEW TWPS.) | $40.00 | $27.42 | $67.42 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: BRIDGE | $33.72 | $16.30 | $50.02 Bottom 10% +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: BRUSH AND ROLLER | $29.02 | $21.14 | $50.16 Bottom 10% +108% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: BRUSH, ROLLER | $28.02 | $18.33 | $46.35 Bottom 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: COMMERCIAL BRUSH & ROLLER | $30.56 | $23.72 | $54.28 Top 10% +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: INDUSTRIAL | $27.97 | $16.30 | $44.27 Above median +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: INDUSTRIAL BRUSH & ROLLER | $36.01 | $23.72 | $59.73 Top 10% +147% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: SPRAY | $30.02 | $21.14 | $51.16 +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: SPRAY | $30.56 | $23.72 | $54.28 Above median +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: STRUCTURAL STEEL | $29.02 | $18.33 | $47.35 Bottom 10% +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: STRUCTURAL STEEL | $30.02 | $21.14 | $51.16 +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVERMAN | $43.45 | $34.47 | $77.92 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVERMAN | $36.87 | $20.49 | $57.36 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $37.81 | $13.70 | $51.51 Above median +72% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $31.33 | $20.75 | $52.08 Above median +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER (ADAMS, BERKS, LANCASTER, AND LEBANON COUNTIES) | $31.33 | $20.75 | $52.08 Top 10% +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER (PIKE AND MONROE COUNTIES) | $37.81 | $13.70 | $51.51 Top 10% +72% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER (BERKS, LEHIGH, LEBANON, AND NORTHAMPTON COUNTIES) | $56.28 | $35.51 | $91.79 Top 10% +186% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER AND STEAMFITTER (CARBON, COLUMBIA, BRADFORD, LUZERNE, LACKAWANNA, MONROE, SCHUYLKILL, SUSQUEHANNA, WAYNE, WYOMING, AND PIKE COUNTIES) | $51.69 | $27.07 | $78.76 Top 10% +146% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER AND STEAMFITTER (COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, MONTOUR, NORTHUMBERLAND, PERRY, SNYDER, YORK, BRADFORD COUNTY, SU | $41.36 | $29.45 | $70.81 Top 10% +121% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFERS: COMPOSITION FOOTNOTE; A. PAID HOLIDAY: ELECTION DAY | $39.50 | $31.80 | $71.30 Top 10% +201% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $36.13 | $30.32 | $66.45 Above median +100% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER. FOOTNOTES: PAID HOLIDAY: ELECTION DAY | $45.02 | $44.09 | $89.11 Top 10% +168% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| STEAMFITTER | $59.65 | $42.78 | $102.43 Above median +220% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO FINISHER | $32.26 | $18.48 | $50.74 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO WORKER/SETTER | $32.91 | $20.11 | $53.02 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TWP.) MONROE, PIKE, SULLIVAN, TIOGA, WAYNE, AND WYOMING COUNTIES) | $34.25 | $21.89 | $56.14 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Perry, PA — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Perry
Compliance Notes
- This wage determination applies to federal contracts for heavy construction in Perry, Pennsylvania.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.