Building Construction — Northampton, Pennsylvania

WD PA20260101-14554-bld · Revision 3 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL in Northampton, Pennsylvania (construction type: building) is $40.00/hr base + $29.81/hr fringe = $69.81/hr total package (WD PA20260101-14554-bld, Rev. 3).

Scroll down for all 39 trade classifications covered by this determination.

WD Number: PA20260101-14554-bld
Revision: 3
Construction Type: building
State: Pennsylvania (PA)
County: Northampton
Effective: May 17, 2026
Trades covered: 39
Official source: SAM.gov reference PA20260101View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL $40.00 $29.81 $69.81 Top 10% +196% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $55.00 $35.48 $90.48 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $33.24 $17.78 $51.02 +58% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $41.23 $29.79 $71.02 Top 10% +149% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, METAL STUD INSTALLATION, FIRESTOPPING, FORM WORK, METAL FLASHI $39.74 $28.09 $67.83 +138% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $24.55 $16.19 $40.74 Above median +42% vs market $0.00 $0.00 $0.00 $0.00
DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING $61.41 $38.44 $99.85 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $50.00 $25.93 $75.93 Above median +142% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $29.22 $15.73 $44.95 +62% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $26.24 $14.49 $40.73 Above median +4% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL AND ORNAMENTAL $37.26 $32.63 $69.89 Above median +79% vs market $0.00 $0.00 $0.00 $0.00
LABORER (COMMON OR GENERAL; CONCRETE WORKER; TAMPER) $25.39 $17.34 $42.73 +83% vs market $0.00 $0.00 $0.00 $0.00
LABORER (FORKLIFT; SCAFFOLD BUILDER; PLASTER TENDER; MASON TENDER-BRICK) $26.74 $17.34 $44.08 +89% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $27.89 $19.81 $47.70 Top 10% +105% vs market $0.00 $0.00 $0.00 $0.00
MASON - STONE $33.24 $17.78 $51.02 +121% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $51.22 $36.72 $87.94 Top 10% +192% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $28.55 $15.78 $44.33 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADALL $32.70 $18.43 $51.13 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $32.51 $17.98 $50.49 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $33.01 $18.37 $51.38 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $27.01 $16.30 $43.31 Above median +79% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, AND SPRAY $26.45 $16.30 $42.75 Top 10% +77% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION $59.65 $42.78 $102.43 Top 10% +220% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $59.65 $42.78 $102.43 Top 10% +220% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $56.28 $35.51 $91.79 Top 10% +186% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $28.36 $18.10 $46.46 Above median +65% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $29.77 $21.95 $51.72 Above median +84% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $31.09 $22.35 $53.44 Above median +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR (BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID/STEER/SKID LOADER,BOOM, BULLDOZER, CONCRETE PUMP, HOIST, MECHANIC, ROLLER, DRILL RIG $34.96 $23.48 $58.44 +108% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR (HOIST, FORKLIFT) $32.23 $22.68 $54.91 Bottom 10% +95% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $37.49 $24.23 $61.72 Top 10% +119% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $31.09 $22.35 $53.44 Above median +90% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $40.33 $32.62 $72.95 Top 10% +208% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: WATERPROOFING ONLY $28.60 $18.02 $46.62 Top 10% +97% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDES HVAC DUCT INSTALLATION FOOTNOTE: PAID HOLIDAY: ELECTION DAY $43.09 $42.52 $85.61 Above median +157% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $49.75 $30.26 $80.01 Above median +150% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $30.20 $16.41 $46.61 Above median +64% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $32.92 $19.31 $52.23 Above median +84% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $23.36 $7.60 $30.96 Above median +10% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Northampton, PA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.