Building Construction — Mercer, Pennsylvania

WD PA20260097-14584-bld · Revision 5 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for 151-200 JIBS- ADD $1.50 BOOMS 201-251 JIBS- ADD $2.25 in Mercer, Pennsylvania (construction type: building) is $35.62/hr base + $24.05/hr fringe = $59.67/hr total package (WD PA20260097-14584-bld, Rev. 5).

Scroll down for all 33 trade classifications covered by this determination.

WD Number: PA20260097-14584-bld
Revision: 5
Construction Type: building
State: Pennsylvania (PA)
County: Mercer
Effective: May 17, 2026
Trades covered: 33
Official source: SAM.gov reference PA20260097View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
151-200 JIBS- ADD $1.50 BOOMS 201-251 JIBS- ADD $2.25 $35.62 $24.05 $59.67 $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL $30.55 $20.04 $50.59 Bottom 10% +114% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $48.28 $33.17 $81.45 Above median +93% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $34.73 $24.14 $58.87 Above median +82% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $35.94 $19.02 $54.96 +93% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $31.77 $21.89 $53.66 Above median +87% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $51.45 $29.77 $81.22 Top 10% +158% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $25.40 $25.47 $50.87 +83% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $33.57 $32.23 $65.80 Above median +68% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $36.26 $28.16 $64.42 +65% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $36.72 $30.38 $67.10 Above median +71% vs market $0.00 $0.00 $0.00 $0.00
JIBS- ADD $1.50 BOOMS 201-251 JIBS- ADD $2.25 $41.69 $24.05 $65.74 $0.00 $0.00 $0.00 $0.00
LABORER $30.24 $12.05 $42.29 Above median +81% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $22.73 $18.97 $41.70 Top 10% +79% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER-BRICK $22.88 $18.97 $41.85 Bottom 10% +80% vs market $0.00 $0.00 $0.00 $0.00
MASON - STONE $34.73 $24.14 $58.87 Above median +155% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $43.00 $23.44 $66.44 Above median +121% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER ONLY $30.56 $23.72 $54.28 Above median +125% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING ONLY $32.39 $23.26 $55.65 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY ONLY $27.12 $24.89 $52.01 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $43.13 $23.42 $66.55 Above median $0.00 $0.00 $0.00 $0.00
PIPEFITTER $48.15 $29.17 $77.32 Above median +141% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $46.98 $25.47 $72.45 Above median +126% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BOBCAT/SKIDSTEER/SKID LOADER, DRILL RIG CAISSON, HIGHLIFT, PAVER $41.69 $24.05 $65.74 +133% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER $41.69 $24.05 $65.74 Above median +133% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: OILER $32.83 $24.05 $56.88 Above median +102% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $36.70 $18.09 $54.79 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: WATERPROOFING ONLY $26.77 $12.57 $39.34 Bottom 10% +66% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $39.50 $30.79 $70.29 Above median +111% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $49.75 $30.26 $80.01 Above median +150% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $28.76 $17.16 $45.92 Above median +62% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $35.64 $21.63 $57.27 Above median +102% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $23.36 $7.60 $30.96 Above median +10% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Mercer, PA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Mercer

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for PA20260097-14584-bld →