Building Construction — Luzerne, Pennsylvania

WD PA20260095-14595-bld · Revision 3 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Luzerne, Pennsylvania (construction type: building) is $39.18/hr base + $26.07/hr fringe = $65.25/hr total package (WD PA20260095-14595-bld, Rev. 3).

Scroll down for all 37 trade classifications covered by this determination.

WD Number: PA20260095-14595-bld
Revision: 3
Construction Type: building
State: Pennsylvania (PA)
County: Luzerne
Effective: May 17, 2026
Trades covered: 37
Official source: SAM.gov reference PA20260095View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $39.18 $26.07 $65.25 Above median +176% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $55.00 $35.48 $90.48 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $37.07 $18.82 $55.89 Above median +73% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $36.57 $20.04 $56.61 +99% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $37.13 $14.30 $51.43 Above median +79% vs market $0.00 $0.00 $0.00 $0.00
DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING $61.41 $38.44 $99.85 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $45.08 $25.35 $70.43 Above median +124% vs market $0.00 $0.00 $0.00 $0.00
LABORER $20.80 $16.88 $37.68 +62% vs market $0.00 $0.00 $0.00 $0.00
LABORER $22.80 $16.88 $39.68 +70% vs market $0.00 $0.00 $0.00 $0.00
LABORER (FORKLIFT) $24.82 $16.88 $41.70 Above median +79% vs market $0.00 $0.00 $0.00 $0.00
LABORER (SCAFFOLD BUILDER).$ 23.32 16.88 LABORER $23.32 $16.88 $40.20 +72% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $27.89 $19.81 $47.70 Top 10% +105% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER-BRICK $23.32 $16.88 $40.20 Bottom 10% +72% vs market $0.00 $0.00 $0.00 $0.00
MASON - STONE $37.07 $18.82 $55.89 Above median +142% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $28.55 $15.78 $44.33 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADALL $32.70 $18.43 $51.13 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $32.51 $17.98 $50.49 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $33.01 $18.37 $51.38 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $27.95 $16.12 $44.07 Above median +82% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $51.69 $27.07 $78.76 Above median +146% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $51.69 $27.07 $78.76 Above median +146% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $29.58 $20.15 $49.73 Above median +77% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $39.42 $29.30 $68.72 Above median +144% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $44.61 $30.83 $75.44 Top 10% +168% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $40.74 $29.70 $70.44 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR (BACKHOE/ EXCAVATOR/ TRACKHOE, BULLDOZER, HOIST, MECHANIC, LOADER) $44.61 $30.83 $75.44 +168% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR (FORKLIFT) $41.88 $30.03 $71.91 Top 10% +155% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR (FORKLIFT) $44.61 $30.83 $75.44 Top 10% +168% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR (HOIST, FORKLIFT) $41.88 $30.03 $71.91 Above median +155% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $47.14 $31.58 $78.72 Top 10% +180% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $34.25 $21.89 $56.14 Above median +137% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: WATERPROOFING ONLY $28.60 $18.02 $46.62 Top 10% +97% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $36.13 $30.32 $66.45 Above median +100% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $49.75 $30.26 $80.01 Above median +150% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $32.62 $15.62 $48.24 Above median +70% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $35.13 $16.52 $51.65 Above median +82% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $23.36 $7.60 $30.96 Above median +10% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Luzerne, PA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Luzerne

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for PA20260095-14595-bld →