Building Construction — Dauphin, Pennsylvania

WD PA20260086-14536-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL in Dauphin, Pennsylvania (construction type: building) is $40.00/hr base + $29.81/hr fringe = $69.81/hr total package (WD PA20260086-14536-bld, Rev. 2).

Scroll down for all 42 trade classifications covered by this determination.

WD Number: PA20260086-14536-bld
Revision: 2
Construction Type: building
State: Pennsylvania (PA)
County: Dauphin
Effective: May 17, 2026
Trades covered: 42
Official source: SAM.gov reference PA20260086View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL $40.00 $29.81 $69.81 Top 10% +196% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $55.00 $35.48 $90.48 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $33.99 $16.87 $50.86 +57% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $36.84 $20.19 $57.03 +100% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $23.25 $16.99 $40.24 Above median +40% vs market $0.00 $0.00 $0.00 $0.00
DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING $58.70 $38.44 $97.14 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.00 $27.42 $67.42 Above median +114% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: CARPET ONLY $25.71 $12.02 $37.73 Above median +54% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $25.05 $8.58 $33.63 +21% vs market $0.00 $0.00 $0.00 $0.00
LABORER $26.91 $17.18 $44.09 Above median +89% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON/GENERAL, INCLUDING LANDSCAPING $19.66 $8.12 $27.78 +19% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE WORKER $24.61 $17.18 $41.79 +79% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FORKLIFT $23.86 $8.28 $32.14 +38% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $17.89 $8.28 $26.17 Above median +12% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $43.00 $23.44 $66.44 Above median +121% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $39.32 $19.52 $58.84 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $26.41 $16.58 $42.99 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $37.85 $22.72 $60.57 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $27.43 $16.94 $44.37 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADALL $32.70 $18.43 $51.13 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $32.51 $17.98 $50.49 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: HYDRO MULCH $26.41 $16.58 $42.99 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $27.05 $14.52 $41.57 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $30.39 $15.05 $45.44 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER ONLY $25.84 $16.30 $42.14 Bottom 10% +74% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY ONLY $27.89 $13.53 $41.42 Top 10% +72% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $41.36 $29.45 $70.81 Above median +121% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $41.36 $29.45 $70.81 Above median +121% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $27.09 $10.02 $37.11 +16% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $32.25 $21.32 $53.57 Above median +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $36.87 $21.32 $58.19 Above median +107% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $39.42 $29.30 $68.72 Above median +144% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR (HOIST, FORKLIFT) $44.61 $30.83 $75.44 Top 10% +168% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR (HOIST, FORKLIFT) $41.88 $30.03 $71.91 Above median +155% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $47.14 $31.58 $78.72 Top 10% +180% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $40.33 $32.62 $72.95 Top 10% +208% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: WATERPROOFING ONLY $28.60 $18.02 $46.62 Top 10% +97% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDES HVAC DUCT INSTALLATION FOOTNOTE: PAID HOLIDAY: ELECTION DAY $43.09 $42.52 $85.61 Above median +157% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $49.75 $28.96 $78.71 Above median +146% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $20.70 $8.51 $29.21 +3% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $24.30 $11.79 $36.09 +27% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $20.86 $4.84 $25.70 Above median -9% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Dauphin, PA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Dauphin

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for PA20260086-14536-bld →