Building Construction — Crawford, Pennsylvania
WD PA20260049-14572-bld · Revision 4 · Effective May 17, 2026
The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Crawford, Pennsylvania (construction type: building) is $46.50/hr base + $29.43/hr fringe = $75.93/hr total package (WD PA20260049-14572-bld, Rev. 4).
Scroll down for all 46 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $46.50 | $29.43 | $75.93 Above median +222% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $48.28 | $33.17 | $81.45 Above median +93% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $32.79 | $23.32 | $56.11 Above median +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $35.94 | $19.02 | $54.96 +93% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $24.75 | $9.48 | $34.23 +20% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND METAL STUD INSTALLATION, FLOOR LAYER - CARPET, HARDWOOD, AND VINYL, FORM WORK | $22.68 | $7.71 | $30.39 +7% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $31.77 | $21.89 | $53.66 Above median +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $49.11 | $36.79 | $85.90 Top 10% +173% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $51.45 | $29.77 | $81.22 Top 10% +158% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $28.30 | $10.73 | $39.03 +40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $36.26 | $28.16 | $64.42 +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, RIGGER | $35.22 | $30.56 | $65.78 Top 10% +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $33.57 | $32.23 | $65.80 Above median +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL | $34.91 | $30.85 | $65.76 Above median +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $26.82 | $19.39 | $46.21 Above median +98% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $23.23 | $18.53 | $41.76 Above median +79% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $18.41 | $6.45 | $24.86 Above median +7% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MASON - STONE | $32.79 | $23.32 | $56.11 Above median +143% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MECHANICAL INSULATOR, INCLUDING DUCT AND PIPE AND EXCLUDING WORK ON INDUSTRIAL SITES | $30.60 | $17.16 | $47.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $43.00 | $23.44 | $66.44 Above median +121% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MECHANIC | $36.53 | $22.01 | $58.54 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $27.95 | $16.12 | $44.07 Above median +82% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $32.39 | $23.26 | $55.65 Above median +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $30.56 | $23.72 | $54.28 Above median +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $27.10 | $18.02 | $45.12 Above median +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $36.01 | $23.72 | $59.73 Top 10% +147% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $28.84 | $24.30 | $53.14 Above median +120% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND ROLLER ONLY | $30.56 | $23.72 | $54.28 Above median +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND ROLLER ONLY | $28.84 | $24.30 | $53.14 +120% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: DRYWALL FINISHING/TAPING ONLY | $32.39 | $23.26 | $55.65 Top 10% +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: DRYWALL FINISHING/TAPING ONLY | $27.10 | $18.02 | $45.12 +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $47.75 | $26.55 | $74.30 Above median +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $40.02 | $26.55 | $66.57 Above median +108% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $48.15 | $29.17 | $77.32 Above median +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $30.69 | $18.99 | $49.68 +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $46.98 | $25.47 | $72.45 Above median +126% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, LOADER, CRANE*, BULLDOZER *ADD TO CRANE RATE: BOOMS 101-150 JIBS | $36.87 | $21.32 | $58.19 Top 10% +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | $21.32 | $51.02 Above median +81% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: PAVER, DRILL RIG CAISSONS, BULLDOZER, FORKLIFT, MAN LIFT/OUTSIDE ELEVATOR | $36.87 | $21.32 | $58.19 +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROLLER, FORKLIFT | $32.25 | $21.32 | $53.57 +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER, EXCLUDES INSTALLATION OF METAL ROOFS | $22.98 | $11.86 | $34.84 Bottom 10% +47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $31.43 | $20.05 | $51.48 +55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $49.75 | $30.26 | $80.01 Above median +150% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $28.76 | $17.16 | $45.92 Above median +62% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $35.64 | $21.63 | $57.27 Above median +102% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $24.98 | $11.88 | $36.86 Top 10% +31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Crawford, PA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Crawford
Compliance Notes
- This wage determination applies to federal contracts for building construction in Crawford, Pennsylvania.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.