Building Construction — Columbia, Pennsylvania

WD PA20260084-14593-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Columbia, Pennsylvania (construction type: building) is $39.18/hr base + $26.07/hr fringe = $65.25/hr total package (WD PA20260084-14593-bld, Rev. 2).

Scroll down for all 34 trade classifications covered by this determination.

WD Number: PA20260084-14593-bld
Revision: 2
Construction Type: building
State: Pennsylvania (PA)
County: Columbia
Effective: May 17, 2026
Trades covered: 34
Official source: SAM.gov reference PA20260084View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $39.18 $26.07 $65.25 Above median +176% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $55.00 $35.48 $90.48 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $32.66 $21.58 $54.24 Above median +68% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $36.84 $20.19 $57.03 +100% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $32.66 $21.32 $53.98 Above median +88% vs market $0.00 $0.00 $0.00 $0.00
DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING $61.41 $38.44 $99.85 Top 10% $0.00 $0.00 $0.00 $0.00
LABORER $23.41 $11.19 $34.60 +48% vs market $0.00 $0.00 $0.00 $0.00
LABORER (CONCRETE WORKER; CONCRETE SAW) $20.07 $11.19 $31.26 +34% vs market $0.00 $0.00 $0.00 $0.00
LABORER (FORKLIFT) $24.91 $11.19 $36.10 Bottom 10% +55% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $21.02 $16.88 $37.90 Top 10% +63% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $27.89 $19.81 $47.70 Top 10% +105% vs market $0.00 $0.00 $0.00 $0.00
MASON - STONE $32.66 $21.58 $54.24 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $43.00 $23.44 $66.44 Above median +121% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $30.73 $15.10 $45.83 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $28.55 $15.78 $44.33 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADALL $32.70 $18.43 $51.13 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $32.51 $17.98 $50.49 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $33.01 $18.37 $51.38 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $27.95 $16.12 $44.07 Above median +82% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $41.36 $29.45 $70.81 Above median +121% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $41.36 $29.45 $70.81 Above median +121% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $28.36 $18.10 $46.46 Above median +65% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR BOBCAT/ SKID/ STEER/ SKID LOADER, BULLDOZER, HOIST, MECHANIC, LOADER, FORKLIFT $44.61 $30.83 $75.44 +168% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR CRANE $47.14 $31.58 $78.72 Top 10% +180% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR HOIST, FORKLIFT $41.88 $30.03 $71.91 +155% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR OILER $39.42 $29.30 $68.72 Top 10% +144% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR PUMP $40.74 $29.70 $70.44 +150% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $40.33 $32.62 $72.95 Top 10% +208% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: WATERPROOFING ONLY $28.60 $18.02 $46.62 Top 10% +97% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $36.13 $30.32 $66.45 Above median +100% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $49.75 $28.96 $78.71 Above median +146% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $27.63 $13.94 $41.57 +47% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $32.85 $17.56 $50.41 Above median +78% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $23.36 $7.60 $30.96 Above median +10% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Columbia, PA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Columbia

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for PA20260084-14593-bld →