Highway Construction — Clearfield, Pennsylvania

WD PA20260002-14570-hwy · Revision 4 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BOILERMAKER in Clearfield, Pennsylvania (construction type: highway) is $55.00/hr base + $35.48/hr fringe = $90.48/hr total package (WD PA20260002-14570-hwy, Rev. 4).

Scroll down for all 96 trade classifications covered by this determination.

WD Number: PA20260002-14570-hwy
Revision: 4
Construction Type: highway
State: Pennsylvania (PA)
County: Clearfield
Effective: May 17, 2026
Trades covered: 96
Official source: SAM.gov reference PA20260002View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $55.00 $35.48 $90.48 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $48.28 $33.17 $81.45 Above median +93% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $35.34 $18.48 $53.82 Bottom 10% +28% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $34.17 $17.20 $51.37 +59% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $35.28 $24.49 $59.77 Above median +85% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $28.64 $21.86 $50.50 +56% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $31.62 $22.81 $54.43 Above median +68% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER (ALLEGHENY, WASHINGTON COUNTIES) $34.05 $22.81 $56.86 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER (ARMSTRONG, CLARION, FAYETTE, GREENE, INDIANA, AND WESTMORELAND COUNTIES) $36.55 $24.46 $61.01 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER (FAYETTE, GREENE, INDIANA, AND WESTMORELAND COUNTIES) $31.00 $20.66 $51.66 Top 10% +60% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON $32.66 $21.58 $54.24 Top 10% +68% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON $33.99 $16.87 $50.86 Bottom 10% +57% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON & MARBLE SETTER (BEDFORD, BLAIR,CAMBRIA, CENTRE COUNTY,FULTON, HUNTINGDON, AND SOMERSET COUNTIES) $34.14 $22.00 $56.14 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON (CLEARFIELD, FOREST, JEFFERSON, VENANGO, AND CLARION COUNTIES) $34.14 $22.77 $56.91 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS $43.85 $22.84 $66.69 Above median +134% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS $44.10 $22.84 $66.94 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS $42.35 $22.84 $65.19 Above median +129% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS $42.60 $22.84 $65.44 Above median +130% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $37.44 $28.00 $65.44 Top 10% +128% vs market $0.00 $0.00 $0.00 $0.00
DIVER $64.70 $23.42 $88.12 Above median $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $43.25 $26.56 $69.81 Above median +122% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.00 $27.42 $67.42 Above median +114% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $51.45 $29.77 $81.22 Top 10% +158% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.47 $26.51 $66.98 Above median +113% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.48 $26.54 $68.02 Above median +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (ALLEGHENY, ARMSTRONG, BEDFORD, BLAIR, BUTLER CAMBRIA, CAMERON, CENTRE, CLARION, CLEARFIELD, ELK, FAYETTE, FULTON, GREENE, HUNTINGDON, IND $49.11 $36.79 $85.90 Top 10% +173% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (CENTRE COUNTY) $40.47 $26.51 $66.98 Top 10% +113% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $38.89 $34.54 $73.43 Above median +88% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $32.29 $32.41 $64.70 Above median +65% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $33.57 $32.23 $65.80 Above median +68% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $35.19 $25.66 $60.85 +55% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL (FRANKLIN, HUNTINGDON, AND MIFFLIN COUNTIES) $37.26 $32.63 $69.89 Top 10% +79% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL, ORNAMENTAL, REINFORCING, MACHINERY MOVER, RIGGER & MACHINERY ERECTOR, WELDER, FENCE ERECTOR (BEDFORD, FRANKLIN, FULTON, HUNTIN $31.65 $24.50 $56.15 Top 10% +43% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 1 ASPHALT CURB SEALER; ASPHALT TAMPER; BATCHERMAN BLASTER,BOATMAN, BRAKEMAN, CHANGE HOUSE ATTENDANT, COFFER DAM, CONCRETE CURING PITMAN $34.60 $27.00 $61.60 Top 10% +164% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 2 AIR TOOL OPERATOR; ASPHALT, BATCH & CONCRETE PLANT OPERATOR BURNER, CAISSON; MEN; CARRYABLE PUMPS; CHAIN SAW OPERATOR INCLUDING ATTAC $34.76 $27.00 $61.76 Top 10% +165% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 3 ASPHALT LUTEMAN/RAKER,BLACKSMITH, BLASTER, BRICK, STONE AND BLOCK PAVERS AND BLOCK CUTTERS; CEMENT MORTAR LINING CAR PUSHER; CEMENT M $35.25 $27.00 $62.25 Top 10% +167% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 4 REINFORCING STEEL PLACER $35.70 $27.00 $62.70 Top 10% +169% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 5 HIGH BURNER,, WELDER $36.11 $27.00 $63.11 Top 10% +171% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 6 UNIFORMED FLAGPERSON, WATCHMAN $32.95 $27.00 $59.95 Top 10% +157% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 ASPHALT CURB SEALER; ASPHALT TAMPER; BATCHERMAN BLASTER,BOATMAN, BRAKEMAN, CHANGE HOUSE ATTENDANT, COFFER DAM, CONCRETE CURING PITMA $34.70 $27.00 $61.70 Top 10% +165% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 AIR TOOL OPERATOR; ASPHALT, BATCH & CONCRETE PLANT OPERATOR BURNER, CAISSON; MEN; CARRYABLE PUMPS; CHAIN SAW OPERATOR INCLUDING ATTA $34.86 $27.00 $61.86 Top 10% +165% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 ASPHALT LUTEMAN/RAKER,BLACKSMITH, BLASTER, BRICK, STONE AND BLOCK PAVERS AND BLOCK CUTTERS; CEMENT MORTAR LINING CAR PUSHER; CEMENT $35.25 $27.00 $62.25 Top 10% +167% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 4 REINFORCING STEEL PLACER $35.70 $27.00 $62.70 Top 10% +169% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 5 HIGH BURNER,, WELDER $36.11 $27.00 $63.11 Top 10% +171% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 6 UNIFORMED FLAGPERSON, WATCHMAN $32.95 $27.00 $59.95 Top 10% +157% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: CABLE SPLICER $54.38 $30.13 $84.51 Top 10% +69% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: CABLE SPLICER $53.20 $29.72 $82.92 Above median +66% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: EQUIPMENT OPERATOR $68.06 $31.43 $99.49 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN $32.63 $22.68 $55.31 Above median +11% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN $31.92 $22.43 $54.35 Above median +9% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMEN $42.20 $16.02 $58.22 Top 10% +17% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN $54.38 $30.13 $84.51 Above median +69% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN $53.20 $29.72 $82.92 +66% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMEN $68.06 $31.43 $99.49 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: TRUCK DRIVER $35.35 $23.61 $58.96 Above median +18% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: TRUCK DRIVER $34.58 $23.34 $57.92 Bottom 10% +16% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: TRUCK DRIVER $44.24 $16.21 $60.45 Top 10% +21% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: WINCH TRUCK OPERATOR $38.07 $24.54 $62.61 Top 10% +26% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: WINCH TRUCK OPERATOR $37.24 $24.25 $61.49 Above median +23% vs market $0.00 $0.00 $0.00 $0.00
MARBLE MASON (CLEARFIELD, FOREST, JEFFERSON, VENANGO, AND CLARION COUNTIES) $34.14 $22.77 $56.91 Top 10% $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $43.00 $23.44 $66.44 Above median +121% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH $25.84 $16.30 $42.14 Bottom 10% +74% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER (CAMERON, CRAWFORD, POTTER, WARREN,) $30.56 $23.72 $54.28 Top 10% +125% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRIDGE $38.33 $23.72 $62.05 Above median +157% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRIDGES,STACKS,TOWERS (ERIE, MCKEAN, AND WARREN COUNTIES) $28.87 $24.89 $53.76 Top 10% +123% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH & ROLLER $29.02 $21.14 $50.16 +108% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH & ROLLER $30.56 $23.72 $54.28 Above median +125% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH AND ROLLER $30.56 $23.72 $54.28 Above median +125% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH AND ROLLER (ERIE, MCKEAN, AND WARREN COUNTIES) $26.37 $24.89 $51.26 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: SPRAY $30.02 $21.14 $51.16 +112% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: SPRAY $30.56 $23.72 $54.28 Above median +125% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: SPRAY AND SANDBLASTING (ERIE, MCKEAN, AND WARREN COUNTIES) $27.12 $24.89 $52.01 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $43.13 $23.42 $66.55 Above median $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN (PILEDRIVERMAN) $44.63 $23.42 $68.05 Top 10% $0.00 $0.00 $0.00 $0.00
PLUMBERS AND PIPEFITTERS: BRIDGE DRAIN PIPE $46.98 $25.47 $72.45 Top 10% +126% vs market $0.00 $0.00 $0.00 $0.00
PLUMBERS AND PIPEFITTERS: BRIDGE DRAIN PIPE (ALLEGHENY, ARMSTRONG, BEAVER, BUTLER, CLARION, GREENE, LAWRENCE, WASHINGTON AND WESTMORELAND COUNTIES) $48.65 $25.47 $74.12 Top 10% +131% vs market $0.00 $0.00 $0.00 $0.00
PLUMBERS AND PIPEFITTERS: BRIDGE DRAIN PIPE (BEDFORD, BLAIR, CAMBRIA, CAMERON, CLEARFIELD, ELK, FAYETTE, GREENE, HUNTINGDON, INDIANA, JEFFERSON, SOMER $35.54 $19.97 $55.51 Top 10% +73% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 $41.67 $24.66 $66.33 Above median +136% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 $41.96 $24.66 $66.62 Above median +137% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1-A $44.67 $24.66 $69.33 Bottom 10% +146% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1-A $44.96 $24.66 $69.62 Top 10% +147% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1-B $43.67 $24.66 $68.33 Bottom 10% +143% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1-B $43.96 $24.66 $68.62 Top 10% +144% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 2 $41.39 $24.66 $66.05 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 2 $41.70 $24.66 $66.36 Above median +136% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3 $37.75 $24.66 $62.41 Above median +122% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3 $38.05 $24.66 $62.71 Above median +123% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4 $37.26 $24.66 $61.92 Above median +120% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4 $37.59 $24.66 $62.25 Above median +121% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5 $37.05 $24.66 $61.71 Bottom 10% +119% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5 $37.34 $24.66 $62.00 Top 10% +120% vs market $0.00 $0.00 $0.00 $0.00
TENDER $43.13 $23.42 $66.55 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1 SINGLE AXLE; INCLUDES PARTSMAN AND WAREHOUEMAN. TANDEM - TRI-AXLE - SEMI-TRACTOR TRAILER FOOTNOTES: A. HAZARDOUS/TOXIC WASTE MAT $37.93 $23.71 $61.64 Top 10% +119% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2 SPECIALTY VEHICLES; HEAVY EQUIPMENT WHOSE CAPACITY EXCEEDS THAT FOR WHICH STATE LICENSES ARE ISSUED SPECIFICALLY REFERS TO UNITS $38.39 $24.02 $62.41 Top 10% +122% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 1 SINGLE AXLE; INCLUDES PARTSMAN AND WAREHOUEMAN. TANDEM - TRI-AXLE - SEMI-TRACTOR TRAILER BEDFORD, CAMERON, CLAIRON, CLINTON, EL $37.79 $23.63 $61.42 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 2 SPECIALTY VEHICLES; HEAVY EQUIPMENT WHOSE CAPACITY EXCEEDS THAT FOR WHICH STATE LICENSES ARE ISSUED SPECIFICALLY REFERS TO UNIT $38.25 $23.93 $62.18 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Clearfield, PA — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Clearfield

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for PA20260002-14570-hwy →