Building Construction — Blair, Pennsylvania

WD PA20260077-14564-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL in Blair, Pennsylvania (construction type: building) is $40.00/hr base + $29.81/hr fringe = $69.81/hr total package (WD PA20260077-14564-bld, Rev. 2).

Scroll down for all 31 trade classifications covered by this determination.

WD Number: PA20260077-14564-bld
Revision: 2
Construction Type: building
State: Pennsylvania (PA)
County: Blair
Effective: May 17, 2026
Trades covered: 31
Official source: SAM.gov reference PA20260077View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL $40.00 $29.81 $69.81 Top 10% +196% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $48.28 $33.17 $81.45 Above median +93% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $33.01 $18.09 $51.10 +79% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $31.97 $21.35 $53.32 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $50.86 $31.78 $82.64 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $25.40 $25.47 $50.87 +83% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL, REINFORCING, RIGGER, AND STRUCTURAL $32.29 $32.41 $64.70 Top 10% +65% vs market $0.00 $0.00 $0.00 $0.00
JIBS- ADD $1.50 BOOMS 201-251 JIBS- ADD $2.25 $36.87 $21.32 $58.19 $0.00 $0.00 $0.00 $0.00
LABORER $30.24 $12.05 $42.29 Above median +81% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $18.15 $9.76 $27.91 Above median +20% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER-BRICK $29.56 $17.05 $46.61 +100% vs market $0.00 $0.00 $0.00 $0.00
MASON - STONE $34.14 $22.00 $56.14 Above median +144% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $43.00 $23.44 $66.44 Above median +121% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT, ALL TYPES $23.69 $13.13 $36.82 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $32.39 $23.26 $55.65 Above median +130% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, AND SPRAY ONLY $30.56 $23.72 $54.28 +125% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $41.36 $29.45 $70.81 Above median +121% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $29.20 $12.86 $42.06 +40% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $47.75 $26.55 $74.30 Above median +132% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $40.02 $26.55 $66.57 Above median +108% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER, DRILL, GRADALL, GRADER/BLADE, PAVER $36.87 $21.32 $58.19 +107% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HOIST, PUMP $29.70 $21.32 $51.02 +81% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: OILER $29.70 $21.32 $51.02 Above median +81% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $32.25 $21.32 $53.57 Above median +90% vs market $0.00 $0.00 $0.00 $0.00
ROOFER, EXCLUDES WATERPROOFING $33.50 $20.66 $54.16 +129% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 32.03 22.87 ROOFER: WATERPROOFING ONLY $29.50 $21.10 $50.60 +52% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: HVAC DUCT INSTALLATION ONLY FOOTNOTE: PAID HOLIDAY: ELECTION DAY $45.02 $44.09 $89.11 +168% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $49.75 $28.96 $78.71 Above median +146% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $28.76 $17.16 $45.92 Above median +62% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $35.64 $21.63 $57.27 Above median +102% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $23.36 $7.60 $30.96 Above median +10% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Blair, PA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Blair

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for PA20260077-14564-bld →