Heavy Construction — Union, Oregon

WD OR20260081-16989-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for DREDGING: ASSISTANT ENGINEER ZONE A - ALL JOBS OR PROJECTS LOCATED WITHIN 30 ROAD MILES OF PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED in Union, Oregon (construction type: heavy) is $53.31/hr base + $16.70/hr fringe = $70.01/hr total package (WD OR20260081-16989-hvy, Rev. 1).

Scroll down for all 15 trade classifications covered by this determination.

WD Number: OR20260081-16989-hvy
Revision: 1
Construction Type: heavy
State: Oregon (OR)
County: Union
Effective: May 17, 2026
Trades covered: 15
Official source: SAM.gov reference OR20260081View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
DREDGING: ASSISTANT ENGINEER ZONE A - ALL JOBS OR PROJECTS LOCATED WITHIN 30 ROAD MILES OF PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED $53.31 $16.70 $70.01 Top 10% $0.00 $0.00 $0.00 $0.00
DREDGING: ASSISTANT ENGINEER ZONE B - OVER 30-60 ROAD MILES FROM PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE $56.31 $16.70 $73.01 Top 10% $0.00 $0.00 $0.00 $0.00
DREDGING: ASSISTANT ENGINEER ZONE C - OVER 60 ROAD MILES FROM PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SH $59.31 $16.70 $76.01 Top 10% $0.00 $0.00 $0.00 $0.00
DREDGING: ASSISTANT MATE ZONE A - ALL JOBS OR PROJECTS LOCATED WITHIN 30 ROAD MILES OF PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FRO $47.95 $16.70 $64.65 Top 10% $0.00 $0.00 $0.00 $0.00
DREDGING: ASSISTANT MATE ZONE B - OVER 30-60 ROAD MILES FROM PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHO $50.95 $16.70 $67.65 Top 10% $0.00 $0.00 $0.00 $0.00
DREDGING: ASSISTANT MATE ZONE C - OVER 60 ROAD MILES FROM PORTLAND CITY HALL.*ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTES $53.95 $16.70 $70.65 Top 10% $0.00 $0.00 $0.00 $0.00
DREDGING: LEVERMAN, DIPPER, FLOATING CLAMSHELL ZONE A - ALL JOBS OR PROJECTS LOCATED WITHIN 30 ROAD MILES OF PORTLAND CITY HALL. *ALL JOBS OR PROJECTS $56.47 $16.70 $73.17 Top 10% $0.00 $0.00 $0.00 $0.00
DREDGING: LEVERMAN, DIPPER, FLOATING CLAMSHELL ZONE B - OVER 30-60 ROAD MILES FROM PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM TH $59.47 $16.70 $76.17 Top 10% $0.00 $0.00 $0.00 $0.00
DREDGING: LEVERMAN, DIPPER, FLOATING CLAMSHELL ZONE C - OVER 60 ROAD MILES FROM PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE C $62.47 $16.70 $79.17 Top 10% $0.00 $0.00 $0.00 $0.00
DREDGING: LEVERMAN, HYDRAULIC ZONE A - ALL JOBS OR PROJECTS LOCATED WITHIN 30 ROAD MILES OF PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTE $56.47 $16.70 $73.17 Top 10% $0.00 $0.00 $0.00 $0.00
DREDGING: LEVERMAN, HYDRAULIC ZONE B - OVER 30-60 ROAD MILES FROM PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY TH $59.47 $16.70 $76.17 Top 10% $0.00 $0.00 $0.00 $0.00
DREDGING: LEVERMAN, HYDRAULIC ZONE C - OVER 60 ROAD MILES FROM PORTLAND CITY HALL.*ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SH $62.47 $16.70 $79.17 Top 10% $0.00 $0.00 $0.00 $0.00
DREDGING: TENDERMAN ZONE A - ALL JOBS OR PROJECTS LOCATED WITHIN 30 ROAD MILES OF PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE $51.82 $16.70 $68.52 Top 10% $0.00 $0.00 $0.00 $0.00
DREDGING: TENDERMAN ZONE B - OVER 30-60 ROAD MILES FROM PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST $54.82 $16.70 $71.52 Top 10% $0.00 $0.00 $0.00 $0.00
DREDGING: TENDERMAN ZONE C - OVER 60 ROAD MILES FROM PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST RO $57.82 $16.70 $74.52 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Union, OR — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Union

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for OR20260081-16989-hvy →