Building Construction — Multnomah, Oregon

WD OR20260100-14521-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICK FINISHER in Multnomah, Oregon (construction type: building) is $32.68/hr base + $16.48/hr fringe = $49.16/hr total package (WD OR20260100-14521-bld, Rev. 1).

Scroll down for all 43 trade classifications covered by this determination.

WD Number: OR20260100-14521-bld
Revision: 1
Construction Type: building
State: Oregon (OR)
County: Multnomah
Effective: May 17, 2026
Trades covered: 43
Official source: SAM.gov reference OR20260100View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICK FINISHER $32.68 $16.48 $49.16 Top 10% $0.00 $0.00 $0.00 $0.00
BRICKLAYER $49.60 $25.15 $74.75 Top 10% +108% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FORM WORK $52.62 $16.81 $69.43 Top 10% +136% vs market $0.00 $0.00 $0.00 $0.00
CAULKER $47.58 $28.45 $76.03 Top 10% $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $46.13 $20.31 $66.44 Top 10% +122% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $45.52 $22.03 $67.55 Above median +56% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER $52.43 $17.01 $69.44 Top 10% +147% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $52.12 $24.37 $76.49 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $63.50 $29.73 $93.23 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: SOFT FLOORS $41.77 $21.18 $62.95 Top 10% +126% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $53.15 $23.21 $76.36 Above median +151% vs market $0.00 $0.00 $0.00 $0.00
HEAT & FROST INSULATOR $62.02 $22.36 $84.38 Above median $0.00 $0.00 $0.00 $0.00
HEAT & FROST INSULATOR $46.64 $18.88 $65.52 Bottom 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER $48.31 $34.52 $82.83 Above median +91% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $39.11 $17.30 $56.41 Top 10% +135% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $40.41 $17.30 $57.71 Top 10% +140% vs market $0.00 $0.00 $0.00 $0.00
LABORER: HOD CARRIER $43.79 $17.05 $60.84 Above median +153% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $16.02 $0.00 $16.02 Above median -33% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $43.79 $17.05 $60.84 Top 10% +153% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $40.41 $17.30 $57.71 Top 10% +140% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $54.75 $16.90 $71.65 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $20.43 $2.31 $22.74 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $54.75 $16.90 $71.65 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $54.75 $16.90 $71.65 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $58.82 $16.90 $75.72 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $23.00 $0.00 $23.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $45.81 $16.90 $62.71 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $54.75 $16.90 $71.65 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $54.75 $16.90 $71.65 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $45.81 $16.90 $62.71 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $35.76 $3.60 $39.36 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PUMP $27.42 $7.92 $35.34 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $50.27 $16.90 $67.17 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $40.85 $16.68 $57.53 Above median +145% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $60.77 $34.72 $95.49 Top 10% +113% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $46.56 $19.83 $66.39 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $60.77 $34.72 $95.49 Top 10% +113% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $27.49 $0.00 $27.49 +2% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $54.99 $33.92 $88.91 Top 10% +184% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $51.65 $27.57 $79.22 Above median +77% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $32.68 $16.48 $49.16 Above median +88% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $43.93 $21.81 $65.74 Top 10% +151% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $21.30 $5.66 $26.96 Above median -8% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Multnomah, OR — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Multnomah

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for OR20260100-14521-bld →