Residential Construction — Lincoln, Oregon

WD OR20260008-14443-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, EXCLUDES FORM WORK in Lincoln, Oregon (construction type: residential) is $19.99/hr base + $7.78/hr fringe = $27.77/hr total package (WD OR20260008-14443-res, Rev. 1).

Scroll down for all 19 trade classifications covered by this determination.

WD Number: OR20260008-14443-res
Revision: 1
Construction Type: residential
State: Oregon (OR)
County: Lincoln
Effective: May 17, 2026
Trades covered: 19
Official source: SAM.gov reference OR20260008View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, EXCLUDES FORM WORK $19.99 $7.78 $27.77 Above median -6% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS $33.48 $14.03 $47.51 +62% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS $36.27 $14.03 $50.30 +71% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $46.13 $20.31 $66.44 Top 10% +122% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $39.34 $22.45 $61.79 Above median +32% vs market $0.00 $0.00 $0.00 $0.00
EXCAVATOR OVER 80,000 LBS. THROUGH 130,000 LBS.; LOADERS: LOADER OPERATOR 60,000 AND LESS THAN 120,000; RUBBER TIRED SCRAPER: WITH TANDOM SCRAPERS; SE $53.60 $16.90 $70.50 Top 10% $0.00 $0.00 $0.00 $0.00
EXCAVATORS/TRACKHOE: HYDRAULIC BACKHOE OPERATOR, WHEEL TYPE; HYDRAULIC BACKHOE OPERATOR TRACK TYPE UP TO AND INCLUDING 20,000 LBS.; LOADERS: LOADERS $49.03 $16.90 $65.93 Top 10% $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $11.00 $0.00 $11.00 -54% vs market $0.00 $0.00 $0.00 $0.00
LABORERS $43.79 $17.05 $60.84 Top 10% +153% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2 BULLDOZERS: BULLDOZER OPERATOR OVER 120,000 LBS AND ABOVE; BULLDOZER OPERATOR, TWIN ENGINE; BULLDOZER OPERATOR,TANDEM $54.75 $16.90 $71.65 Top 10% +119% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 4 BULLDOZERS: BULLDOZER OPERATOR OVER 20,000 LBS AND MORE THAN 100 HORSE UP TO 70,000 LBS; HYDRAULIC HOES EXCAVATOR/TRA $50.27 $16.90 $67.17 Top 10% +105% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $14.41 $0.00 $14.41 -47% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 1 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: UP TO AND INCLUDING 10 CU. YDS $35.41 $18.30 $53.71 Top 10% +83% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 2 DUMP TRCUKS/ARTICULATED DUMPS 6 CU TO 10 CU $35.57 $18.30 $53.87 Top 10% +83% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 3 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 10 CU. YDS. AND INCLUDING 30 CU. YDS., INCLUDES ARTICULATED DUMP TRUCKS $35.74 $18.30 $54.04 Top 10% +84% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 4 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 30 CU. YDS. AND INCLUDING 50 CU. YDS. AND INCLUDES ARTICULATED DUMP TRUCKS $36.08 $18.30 $54.38 Top 10% +85% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 5 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 50 CU. YDS. AND INCLUDING 60 CU. YDS. AND INCLUDES ARTICULATED DUMP TRUCKS $36.35 $18.30 $54.65 Top 10% +86% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 6 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 60 CU. YDS. AND INCLUDING 80 CU. YDS. AND INCLUDES ARTICULATED DUMP TRUCKS $36.57 $18.30 $54.87 Top 10% +87% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 7 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 80 CU. YDS. AND INCLUDING 100 CU. YDS., INCLUDES ARTICULATED DUMP TRUCKS $36.82 $18.30 $55.12 Top 10% +87% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Lincoln, OR — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Lincoln

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for OR20260008-14443-res →