Residential Construction — Jefferson, Oregon
WD OR20260009-14438-res · Revision 2 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CARPENTER, EXCLUDES FORM WORK in Jefferson, Oregon (construction type: residential) is $7.25/hr base + $0.00/hr fringe = $7.25/hr total package (WD OR20260009-14438-res, Rev. 2).
Scroll down for all 22 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER, EXCLUDES FORM WORK | $7.25 | $0.00 | $7.25 Bottom 10% -75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS | $33.48 | $14.03 | $47.51 +62% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS | $36.27 | $14.03 | $50.30 +71% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $46.13 | $20.31 | $66.44 Top 10% +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $41.67 | $19.08 | $60.75 Above median +30% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $31.05 | $12.04 | $43.09 -8% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $40.93 | $20.39 | $61.32 Above median +31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $33.41 | $18.20 | $51.61 +10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| EXCAVATOR OVER 80,000 LBS. THROUGH 130,000 LBS.; LOADERS: LOADER OPERATOR 60,000 AND LESS THAN 120,000; RUBBER TIRED SCRAPER: WITH TANDOM SCRAPERS; SE | $53.60 | $16.90 | $70.50 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| EXCAVATORS/TRACKHOE: HYDRAULIC BACKHOE OPERATOR, WHEEL TYPE; HYDRAULIC BACKHOE OPERATOR TRACK TYPE UP TO AND INCLUDING 20,000 LBS.; LOADERS: LOADERS | $49.03 | $16.90 | $65.93 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS | $43.79 | $17.05 | $60.84 Top 10% +153% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS | $39.00 | $17.30 | $56.30 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 2 BULLDOZERS: BULLDOZER OPERATOR OVER 120,000 LBS AND ABOVE; BULLDOZER OPERATOR, TWIN ENGINE; BULLDOZER OPERATOR,TANDEM | $54.75 | $16.90 | $71.65 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 4 BULLDOZERS: BULLDOZER OPERATOR OVER 20,000 LBS AND MORE THAN 100 HORSE UP TO 70,000 LBS; HYDRAULIC HOES EXCAVATOR/TRA | $50.27 | $16.90 | $67.17 Top 10% +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $14.41 | $0.00 | $14.41 -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 1 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: UP TO AND INCLUDING 10 CU. YDS | $35.41 | $18.30 | $53.71 Top 10% +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 2 DUMP TRCUKS/ARTICULATED DUMPS 6 CU TO 10 CU | $35.57 | $18.30 | $53.87 Top 10% +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 3 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 10 CU. YDS. AND INCLUDING 30 CU. YDS., INCLUDES ARTICULATED DUMP TRUCKS | $35.74 | $18.30 | $54.04 Top 10% +84% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 4 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 30 CU. YDS. AND INCLUDING 50 CU. YDS. AND INCLUDES ARTICULATED DUMP TRUCKS | $36.08 | $18.30 | $54.38 Top 10% +85% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 5 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 50 CU. YDS. AND INCLUDING 60 CU. YDS. AND INCLUDES ARTICULATED DUMP TRUCKS | $36.35 | $18.30 | $54.65 Top 10% +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 6 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 60 CU. YDS. AND INCLUDING 80 CU. YDS. AND INCLUDES ARTICULATED DUMP TRUCKS | $36.57 | $18.30 | $54.87 Top 10% +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 7 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 80 CU. YDS. AND INCLUDING 100 CU. YDS., INCLUDES ARTICULATED DUMP TRUCKS | $36.82 | $18.30 | $55.12 Top 10% +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Jefferson, OR — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Compliance Notes
- This wage determination applies to federal contracts for residential construction in Jefferson, Oregon.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.