Heavy Construction — Jackson, Oregon

WD OR20260056-14437-hvy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for 70,000 LBS; CRANE: DERRICK BARGE OPERATOR LESS THAN 30 TON; PILEDRIVER; SCREED; BLADE OPERATOR in Jackson, Oregon (construction type: heavy) is $50.27/hr base + $16.90/hr fringe = $67.17/hr total package (WD OR20260056-14437-hvy, Rev. 2).

Scroll down for all 33 trade classifications covered by this determination.

WD Number: OR20260056-14437-hvy
Revision: 2
Construction Type: heavy
State: Oregon (OR)
County: Jackson
Effective: May 17, 2026
Trades covered: 33
Official source: SAM.gov reference OR20260056View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
70,000 LBS; CRANE: DERRICK BARGE OPERATOR LESS THAN 30 TON; PILEDRIVER; SCREED; BLADE OPERATOR $50.27 $16.90 $67.17 $0.00 $0.00 $0.00 $0.00
CARPENTERS $53.94 $16.81 $70.75 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $46.13 $20.31 $66.44 Top 10% +122% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $47.04 $21.84 $68.88 Above median +47% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: PAINTER $23.79 $6.57 $30.36 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER $48.31 $34.52 $82.83 Above median +91% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT SPREADER $22.18 $9.39 $31.57 Top 10% +31% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FORM-STRIPPING $19.27 $6.32 $25.59 Top 10% +6% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $20.02 $7.22 $27.24 Above median +13% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $10.60 $1.80 $12.40 -48% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $18.57 $6.24 $24.81 Above median +3% vs market $0.00 $0.00 $0.00 $0.00
LABORERS $43.79 $17.05 $60.84 Top 10% +153% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 BLASTER, DEMOLITION; GENERAL LABORER; CHAIN SAW $39.11 $17.30 $56.41 +135% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 VIBRATING PLATE $40.41 $17.30 $57.71 +140% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 FLAGGER, TRAFFIC CONTROL-CONE SETTER $34.39 $17.30 $51.69 +115% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE $21.68 $5.88 $27.56 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: EXCAVATOR $21.61 $7.05 $28.66 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $22.91 $7.72 $30.63 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $26.57 $9.97 $36.54 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $20.00 $0.73 $20.73 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR; ROLLER $49.03 $16.90 $65.93 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $19.77 $0.00 $19.77 -16% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS $39.94 $16.68 $56.62 Above median +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1B LATTICE BOOM CRANE: OPERATOR, 300 TONS THROUGH 399 TONS WITH OVER 200 FEET BOOM; OPERATOR 400 TONS AND OVER $60.98 $16.90 $77.88 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2 CRANE: CABLEWAY OPERATOR, 25 TONS AND OVER; HYDRAULIC CRANE: HYDRAULIC CRANE OPERATOR 90 TONS THROUGH 199 TONS; TOWER $54.75 $16.90 $71.65 Top 10% +119% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 3 HYDRAULIC CRANE: HYDRAULIC CRANE OPERATOR, 50 TONS THROUGH 89 TONS; LATTICE BOOM CRANES: LATTICE BOOM CRANE-50 THROUG $53.60 $16.90 $70.50 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 6 OILER; BOBCAT/SKID LOADER; GRADE CHECKER; CRANE OILER; ASPHALT SPREADER; BROOM OPERATOR; FORKLIFT; ROLLER $45.81 $16.90 $62.71 +91% vs market $0.00 $0.00 $0.00 $0.00
TOWER ATTACHMENTS $56.66 $16.90 $73.56 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 1 FLATBED TRUCK $35.41 $18.30 $53.71 +83% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $16.00 $4.33 $20.33 Above median -31% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $17.07 $5.50 $22.57 Above median -23% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OFF THE ROAD TRUCK $21.86 $7.08 $28.94 Above median -2% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $18.41 $6.58 $24.99 Above median -15% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Jackson, OR — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Jackson

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for OR20260056-14437-hvy →