Building Construction — Tulsa, Oklahoma

WD OK20260053-14428-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Tulsa, Oklahoma (construction type: building) is $26.92/hr base + $13.09/hr fringe = $40.01/hr total package (WD OK20260053-14428-bld, Rev. 1).

Scroll down for all 33 trade classifications covered by this determination.

WD Number: OK20260053-14428-bld
Revision: 1
Construction Type: building
State: Oklahoma (OK)
County: Tulsa
Effective: May 17, 2026
Trades covered: 33
Official source: SAM.gov reference OK20260053View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $26.92 $13.09 $40.01 +76% vs market $0.00 $0.00 $0.00 $0.00
CAPACITY CRANES. ALL TOWER CRANES $38.09 $19.05 $57.14 Top 10% $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK..$ 14.96 1.55 CARPENTER $15.08 $1.21 $16.29 -29% vs market $0.00 $0.00 $0.00 $0.00
CAULKER $20.00 $1.61 $21.61 Above median $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $13.72 $1.27 $14.99 -34% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $13.00 $0.00 $13.00 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $38.38 $12.89 $51.27 +78% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $21.11 $2.47 $23.58 -18% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $20.65 $3.06 $23.71 -18% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: ALARM INSTALLATION $19.48 $3.34 $22.82 Above median -21% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $12.69 $0.38 $13.07 $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $36.65 $16.03 $52.68 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.44 $2.71 $15.15 Above median -21% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $12.43 $0.00 $12.43 -35% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $13.00 $1.91 $14.91 Above median -23% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.39 $0.00 $12.39 -36% vs market $0.00 $0.00 $0.00 $0.00
LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER $35.40 $19.05 $54.45 Top 10% $0.00 $0.00 $0.00 $0.00
LESS THAN 200 TON CAPACITY $36.14 $19.05 $55.19 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT PAVER $16.25 $0.00 $16.25 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $16.96 $4.22 $21.18 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $21.07 $2.48 $23.55 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $14.28 $1.70 $15.98 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $16.18 $0.00 $16.18 $0.00 $0.00 $0.00 $0.00
PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE $51.24 $38.44 $89.68 Bottom 10% $0.00 $0.00 $0.00 $0.00
PIPEFITTER $36.65 $16.03 $52.68 +100% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 10 OILER; SEMI- TRAILER TRUCK DRIVER $27.25 $19.05 $46.30 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER $34.07 $19.05 $53.12 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT $28.77 $19.05 $47.82 Top 10% +111% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $26.30 $10.34 $36.64 +62% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $35.49 $14.60 $50.09 +62% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 22.11 4.93 PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING $12.22 $0.00 $12.22 -61% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $21.86 $1.19 $23.05 Bottom 10% -13% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP AND FLATBED TRUCK $11.00 $0.00 $11.00 Above median -56% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Tulsa, OK — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Tulsa

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for OK20260053-14428-bld →