Building Construction — Payne, Oklahoma

WD OK20260063-14367-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BOILERMAKER in Payne, Oklahoma (construction type: building) is $33.70/hr base + $24.41/hr fringe = $58.11/hr total package (WD OK20260063-14367-bld, Rev. 1).

Scroll down for all 31 trade classifications covered by this determination.

WD Number: OK20260063-14367-bld
Revision: 1
Construction Type: building
State: Oklahoma (OK)
County: Payne
Effective: May 17, 2026
Trades covered: 31
Official source: SAM.gov reference OK20260063View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $33.70 $24.41 $58.11 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $26.92 $13.09 $40.01 +76% vs market $0.00 $0.00 $0.00 $0.00
CAPACITY CRANES. ALL TOWER CRANES $38.09 $19.05 $57.14 Top 10% $0.00 $0.00 $0.00 $0.00
CARPENTER $27.79 $10.05 $37.84 +65% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $15.34 $5.50 $20.84 -9% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $14.16 $0.00 $14.16 -38% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.10 $0.00 $16.10 -29% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.40 $13.14 $54.54 +89% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $24.26 $9.76 $34.02 +18% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $32.10 $17.38 $49.48 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $9.00 $0.00 $9.00 -53% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $11.88 $0.00 $11.88 -38% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $13.04 $0.00 $13.04 -32% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $13.03 $0.00 $13.03 -32% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PLASTER TENDER $10.17 $0.00 $10.17 Above median -47% vs market $0.00 $0.00 $0.00 $0.00
LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER $35.40 $19.05 $54.45 Top 10% $0.00 $0.00 $0.00 $0.00
LESS THAN 200 TON CAPACITY $36.14 $19.05 $55.19 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $19.34 $0.74 $20.08 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $13.80 $0.94 $14.74 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $13.38 $0.00 $13.38 -39% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING $11.90 $0.00 $11.90 Bottom 10% -46% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $41.00 $16.03 $57.03 +116% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION $19.00 $0.00 $19.00 Bottom 10% -28% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $33.62 $14.18 $47.80 $0.00 $0.00 $0.00 $0.00
PLUMBER $41.00 $16.03 $57.03 Above median +116% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 10 OILER $27.25 $19.05 $46.30 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER $34.07 $19.05 $53.12 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT $28.77 $19.05 $47.82 Top 10% +111% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $15.00 $0.29 $15.29 -32% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $33.38 $16.36 $49.74 +61% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION $16.32 $0.00 $16.32 -47% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Payne, OK — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Payne

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for OK20260063-14367-bld →