Highway Construction — Muskogee, Oklahoma
WD OK20260019-14417-hwy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CARPENTER, EXCLUDES FORM WORK AND FORM SETTING in Muskogee, Oklahoma (construction type: highway) is $13.94/hr base + $0.00/hr fringe = $13.94/hr total package (WD OK20260019-14417-hwy, Rev. 1).
Scroll down for all 67 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER, EXCLUDES FORM WORK AND FORM SETTING | $13.94 | $0.00 | $13.94 Above median -39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES FORM WORK AND FORM SETTING | $13.48 | $0.00 | $13.48 Bottom 10% -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES FORM WORK AND FORM SETTING | $13.69 | $0.00 | $13.69 -40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES FORM WORK AND FORM SETTING | $14.00 | $0.00 | $14.00 Top 10% -39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES FORM WORK AND FORM SETTING | $13.70 | $0.00 | $13.70 Above median -40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $14.24 | $0.00 | $14.24 -37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $13.27 | $0.00 | $13.27 -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER.$ 13.70 0.00 CEMENT MASON/CONCRETE FINISHER | $14.72 | $1.35 | $16.07 Top 10% -29% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FORM WORKER/FORM SETTER | $12.30 | $0.00 | $12.30 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| GUARDRAIL INSTALLER | $9.70 | $0.00 | $9.70 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING | $13.63 | $0.00 | $13.63 Bottom 10% -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $12.70 | $0.00 | $12.70 -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $11.13 | $0.00 | $11.13 -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $12.41 | $0.00 | $12.41 -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER (AIR/POWER TOOL OPERATOR) | $12.79 | $0.00 | $12.79 Top 10% -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER (TRAFFIC CONTROL) | $10.28 | $0.00 | $10.28 -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $10.64 | $0.00 | $10.64 Above median -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $10.55 | $0.00 | $10.55 Above median -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $10.68 | $0.00 | $10.68 Above median -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $10.07 | $0.00 | $10.07 -48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $11.16 | $0.00 | $11.16 Above median -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $11.12 | $0.00 | $11.12 Above median -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $11.96 | $0.00 | $11.96 Top 10% -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $14.66 | $0.00 | $14.66 -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $12.38 | $0.75 | $13.13 -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $12.83 | $0.00 | $12.83 -43% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $11.54 | $0.00 | $11.54 Bottom 10% -49% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $14.13 | $0.00 | $14.13 -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $17.33 | $0.00 | $17.33 -24% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $14.56 | $0.00 | $14.56 -36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $14.87 | $0.00 | $14.87 -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $16.47 | $0.00 | $16.47 -27% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $14.75 | $0.00 | $14.75 -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $13.34 | $0.00 | $13.34 -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $18.63 | $0.00 | $18.63 -18% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $14.65 | $0.00 | $14.65 -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $12.56 | $0.00 | $12.56 -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $14.70 | $0.00 | $14.70 -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: (ROLLER) | $12.44 | $0.00 | $12.44 Above median -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE | $16.13 | $0.00 | $16.13 Above median -29% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE | $14.99 | $0.00 | $14.99 -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $14.61 | $0.00 | $14.61 -36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $14.33 | $0.00 | $14.33 Bottom 10% -37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: LOADER | $13.66 | $0.00 | $13.66 Bottom 10% -40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: LOADER | $13.83 | $0.00 | $13.83 -39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: MECHANIC | $18.77 | $0.00 | $18.77 -17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: MECHANIC | $18.96 | $0.00 | $18.96 -16% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: OILER | $14.59 | $0.00 | $14.59 -36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: OILER | $13.38 | $0.00 | $13.38 Bottom 10% -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROLLER | $13.48 | $0.00 | $13.48 -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROLLER | $12.58 | $0.00 | $12.58 -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROLLER | $13.12 | $0.00 | $13.12 -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR:.$ 14.42 0.00 POWER EQUIPMENT OPERATOR | $11.02 | $0.00 | $11.02 Bottom 10% -51% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR:..$ 14.84 0.00 POWER EQUIPMENT OPERATOR | $14.77 | $0.00 | $14.77 Top 10% -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $13.44 | $0.00 | $13.44 -46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $15.92 | $0.00 | $15.92 Above median -36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $13.64 | $0.00 | $13.64 -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $15.20 | $0.69 | $15.89 Above median -36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $16.18 | $0.00 | $16.18 Above median -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $14.22 | $0.00 | $14.22 -43% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER (SINGLE AXLE TRUCK) | $13.15 | $0.00 | $13.15 Top 10% -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $13.91 | $0.00 | $13.91 -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $13.93 | $0.00 | $13.93 -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER | $15.75 | $0.00 | $15.75 Above median -37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER | $16.14 | $0.00 | $16.14 Above median -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER | $16.93 | $0.00 | $16.93 Top 10% -32% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER | $15.15 | $0.00 | $15.15 Above median -39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Muskogee, OK — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Muskogee
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Muskogee, Oklahoma.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.