Highway Construction — Murray, Oklahoma
WD OK20260020-14402-hwy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CARPENTER, EXCLUDES FORM WORK in Murray, Oklahoma (construction type: highway) is $12.45/hr base + $0.00/hr fringe = $12.45/hr total package (WD OK20260020-14402-hwy, Rev. 1).
Scroll down for all 82 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER, EXCLUDES FORM WORK | $12.45 | $0.00 | $12.45 Bottom 10% -46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES FORM WORK | $11.75 | $0.00 | $11.75 Bottom 10% -49% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES FORM WORK | $12.87 | $0.00 | $12.87 -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES FORM WORK..$ 12.53 0.00 CARPENTER, EXCLUDES FORM WORK.$ 12.14 0.00 CARPENTER, EXCLUDES FORM WORK | $12.49 | $0.00 | $12.49 Top 10% -46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $13.70 | $0.00 | $13.70 -39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $12.95 | $0.00 | $12.95 -43% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $12.00 | $0.00 | $12.00 -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $11.80 | $0.00 | $11.80 -48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER.$ 12.65 0.00 CEMENT MASON/CONCRETE FINISHER | $12.28 | $0.00 | $12.28 Top 10% -46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FORM WORKER | $12.19 | $0.00 | $12.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| GUARDRAIL INSTALLER | $9.70 | $0.00 | $9.70 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING | $13.63 | $0.00 | $13.63 Bottom 10% -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $12.70 | $0.00 | $12.70 -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $11.13 | $0.00 | $11.13 -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $12.35 | $0.00 | $12.35 -36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER (AIR/POWER TOOL OPERATOR) | $12.79 | $0.00 | $12.79 Top 10% -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER (TRAFFIC CONTROL) | $11.15 | $0.00 | $11.15 Top 10% -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $10.79 | $0.00 | $10.79 Above median -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $10.80 | $0.00 | $10.80 Above median -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $10.60 | $0.00 | $10.60 Above median -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $10.48 | $0.00 | $10.48 Above median -46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $11.05 | $0.00 | $11.05 Above median -43% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $9.88 | $0.00 | $9.88 -49% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $9.82 | $0.00 | $9.82 -49% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $11.68 | $0.00 | $11.68 Above median -39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $10.42 | $0.00 | $10.42 Above median -46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $10.25 | $0.00 | $10.25 -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $10.37 | $0.00 | $10.37 -46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $10.01 | $0.00 | $10.01 -48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $10.40 | $0.00 | $10.40 -46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $10.55 | $0.00 | $10.55 Above median -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $10.34 | $0.00 | $10.34 -46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $9.97 | $0.00 | $9.97 -48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $10.49 | $0.00 | $10.49 Above median -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $10.22 | $0.00 | $10.22 -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $14.66 | $0.00 | $14.66 -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $12.38 | $0.75 | $13.13 -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $12.46 | $0.00 | $12.46 -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $12.13 | $0.00 | $12.13 Bottom 10% -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $14.62 | $0.00 | $14.62 -36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $17.33 | $0.00 | $17.33 -24% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $16.06 | $0.00 | $16.06 -29% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $14.56 | $0.00 | $14.56 -36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $14.16 | $0.00 | $14.16 -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $17.37 | $0.00 | $17.37 -23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $17.04 | $0.00 | $17.04 -25% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $14.08 | $0.00 | $14.08 -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $13.25 | $0.00 | $13.25 -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $16.17 | $0.00 | $16.17 -29% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $12.62 | $0.00 | $12.62 -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $14.70 | $0.00 | $14.70 -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: (ROLLER) | $11.86 | $0.00 | $11.86 -48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: (ROLLER) | $12.61 | $0.00 | $12.61 Top 10% -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE | $14.05 | $0.00 | $14.05 -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE | $16.83 | $0.00 | $16.83 Above median -26% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE | $12.52 | $0.00 | $12.52 Bottom 10% -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE | $13.46 | $0.00 | $13.46 -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $14.34 | $0.00 | $14.34 Bottom 10% -37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $14.89 | $0.00 | $14.89 -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $13.02 | $0.00 | $13.02 Bottom 10% -43% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $14.35 | $0.00 | $14.35 Bottom 10% -37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $14.56 | $0.00 | $14.56 -36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CONCRETE SAW | $15.02 | $0.00 | $15.02 Above median -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CONCRETE SAW | $16.42 | $0.00 | $16.42 Top 10% -28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: LOADER | $13.39 | $0.00 | $13.39 Bottom 10% -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: LOADER | $13.10 | $0.00 | $13.10 Bottom 10% -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR:.$ 14.42 0.00 POWER EQUIPMENT OPERATOR | $11.02 | $0.00 | $11.02 Bottom 10% -51% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR:..$ 13.11 0.00 POWER EQUIPMENT OPERATOR | $13.99 | $0.00 | $13.99 Top 10% -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $12.00 | $0.00 | $12.00 -52% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $15.92 | $0.00 | $15.92 Above median -36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $12.63 | $0.00 | $12.63 -49% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $14.99 | $0.00 | $14.99 -40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $16.18 | $0.00 | $16.18 Above median -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $14.42 | $0.00 | $14.42 -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $14.22 | $0.00 | $14.22 -43% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER (SINGLE AXLE TRUCK) | $13.15 | $0.00 | $13.15 Top 10% -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER | $16.12 | $0.00 | $16.12 Above median -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER | $14.76 | $0.00 | $14.76 Above median -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER | $15.68 | $0.00 | $15.68 Above median -37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER | $14.06 | $0.00 | $14.06 -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER | $14.43 | $0.00 | $14.43 -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER | $16.61 | $0.00 | $16.61 Top 10% -33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Murray, OK — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Murray
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Murray, Oklahoma.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.