Residential Construction — McIntosh, Oklahoma

WD OK20260003-14416-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for AIR CONDITIONING MECHANIC in McIntosh, Oklahoma (construction type: residential) is $10.35/hr base + $0.00/hr fringe = $10.35/hr total package (WD OK20260003-14416-res, Rev. 1).

Scroll down for all 20 trade classifications covered by this determination.

WD Number: OK20260003-14416-res
Revision: 1
Construction Type: residential
State: Oklahoma (OK)
County: McIntosh
Effective: May 17, 2026
Trades covered: 20
Official source: SAM.gov reference OK20260003View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
AIR CONDITIONING MECHANIC $10.35 $0.00 $10.35 Top 10% $0.00 $0.00 $0.00 $0.00
BRICKLAYER $10.31 $0.00 $10.31 Bottom 10% -55% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $7.25 $0.00 $7.25 Bottom 10% -68% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $8.73 $0.00 $8.73 Bottom 10% -61% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHERS $8.09 $0.00 $8.09 Bottom 10% $0.00 $0.00 $0.00 $0.00
DRYWALL INSTALLER $10.00 $0.00 $10.00 Top 10% -56% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $8.31 $0.00 $8.31 Bottom 10% -71% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: CARPET $9.26 $0.00 $9.26 -46% vs market $0.00 $0.00 $0.00 $0.00
INSULATION INSTALLER $7.25 $0.00 $7.25 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER $7.50 $0.00 $7.50 Bottom 10% -67% vs market $0.00 $0.00 $0.00 $0.00
LABORER $7.25 $0.00 $7.25 Bottom 10% -62% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $7.25 $0.00 $7.25 Bottom 10% -67% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $8.86 $0.00 $8.86 Bottom 10% -66% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $7.25 $0.00 $7.25 Bottom 10% -68% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $8.31 $0.00 $8.31 Above median -63% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BULLDOZERS $8.23 $0.00 $8.23 Above median -64% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $7.26 $0.00 $7.26 Bottom 10% -68% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $7.76 $0.00 $7.76 Bottom 10% -75% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $7.25 $0.00 $7.25 Bottom 10% -65% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $7.25 $0.00 $7.25 Bottom 10% -71% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the McIntosh, OK — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in McIntosh

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for OK20260003-14416-res →