Building Construction — McClain, Oklahoma
WD OK20260048-14401-bld · Revision 2 · Effective May 17, 2026
The Davis-Bacon prevailing wage for BRICKLAYER in McClain, Oklahoma (construction type: building) is $26.92/hr base + $13.09/hr fringe = $40.01/hr total package (WD OK20260048-14401-bld, Rev. 2).
Scroll down for all 40 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $26.92 | $13.09 | $40.01 +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CAPACITY CRANES. ALL TOWER CRANES | $38.09 | $19.05 | $57.14 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $27.79 | $10.05 | $37.84 +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $14.45 | $0.00 | $14.45 -37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $16.31 | $2.96 | $19.27 Bottom 10% -16% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $16.72 | $0.00 | $16.72 -26% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER | $14.25 | $0.00 | $14.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL HANGER, INCLUDES METAL STUD INSTALLATION | $14.08 | $0.00 | $14.08 Top 10% -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $41.40 | $13.14 | $54.54 +89% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $24.26 | $9.76 | $34.02 +18% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FENCE ERECTOR | $16.00 | $0.00 | $16.00 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $12.02 | $2.42 | $14.44 Bottom 10% -33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HVAC MECHANIC | $21.64 | $6.46 | $28.10 Top 10% +15% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $17.11 | $0.00 | $17.11 -26% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | $32.10 | $17.38 | $49.48 Bottom 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $11.40 | $0.00 | $11.40 -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE | $13.75 | $0.00 | $13.75 -29% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $12.00 | $0.00 | $12.00 -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.00 | $1.91 | $14.91 Above median -23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $12.39 | $0.00 | $12.39 -36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PLASTER TENDER | $12.00 | $0.00 | $12.00 Above median -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER | $35.40 | $19.05 | $54.45 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| LESS THAN 200 TON CAPACITY | $36.14 | $19.05 | $55.19 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $29.15 | $11.81 | $40.96 Bottom 10% +38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.25 | $4.35 | $25.60 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $20.64 | $2.35 | $22.99 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $14.28 | $1.70 | $15.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $16.18 | $0.00 | $16.18 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $13.38 | $1.54 | $14.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $12.17 | $0.00 | $12.17 Above median -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $51.11 | $38.44 | $89.55 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $41.00 | $16.03 | $57.03 +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER; SEMI- TRAILER TRUCK DRIVER | $27.25 | $19.05 | $46.30 Top 10% +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER | $34.07 | $19.05 | $53.12 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT | $28.77 | $19.05 | $47.82 Top 10% +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $26.30 | $10.34 | $36.64 +62% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $33.38 | $16.36 | $49.74 +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 19.45 6.38 PLASTERER | $17.50 | $0.00 | $17.50 -43% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $39.05 | $25.77 | $64.82 +146% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP AND FLATBED TRUCK | $11.60 | $0.00 | $11.60 Top 10% -54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the McClain, OK — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in McClain
Compliance Notes
- This wage determination applies to federal contracts for building construction in McClain, Oklahoma.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.