Highway Construction — Logan, Oklahoma
WD OK20260022-14397-hwy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CARPENTER in Logan, Oklahoma (construction type: highway) is $13.32/hr base + $0.00/hr fringe = $13.32/hr total package (WD OK20260022-14397-hwy, Rev. 1).
Scroll down for all 64 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER | $13.32 | $0.00 | $13.32 -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $11.93 | $0.00 | $11.93 -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $12.47 | $0.00 | $12.47 -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $12.55 | $0.00 | $12.55 -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $12.44 | $0.00 | $12.44 -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $14.21 | $0.00 | $14.21 Bottom 10% -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING | $13.63 | $0.00 | $13.63 Bottom 10% -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $12.50 | $0.00 | $12.50 -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $9.63 | $0.00 | $9.63 -50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $11.31 | $0.00 | $11.31 -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER (POWER TOOL OPERATOR) | $12.89 | $0.00 | $12.89 Top 10% -33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER (TRAFFIC CONTROL) | $11.12 | $0.00 | $11.12 Above median -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $10.37 | $0.00 | $10.37 -46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $10.17 | $0.00 | $10.17 -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $10.55 | $0.00 | $10.55 Above median -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $10.62 | $0.00 | $10.62 Above median -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMMON OR GENERAL | $10.05 | $0.00 | $10.05 -48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $13.63 | $0.00 | $13.63 -40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $16.50 | $0.00 | $16.50 -27% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $12.56 | $0.00 | $12.56 -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $14.06 | $0.00 | $14.06 -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $14.43 | $0.00 | $14.43 -36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $14.93 | $0.00 | $14.93 -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $15.60 | $0.00 | $15.60 -31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $15.10 | $0.00 | $15.10 -33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $13.81 | $0.00 | $13.81 -39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $16.99 | $0.00 | $16.99 -25% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $12.71 | $0.00 | $12.71 -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $14.70 | $0.00 | $14.70 -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $12.44 | $0.00 | $12.44 -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: (ROLLER) | $12.27 | $0.00 | $12.27 Above median -46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ASPHALT PAVING MACHINE | $14.08 | $0.00 | $14.08 Above median -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ASPHALT PAVING MACHINE | $14.04 | $0.00 | $14.04 -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ASPHALT PAVING MACHINE | $14.57 | $0.00 | $14.57 Top 10% -36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ASPHALT PAVING MACHINE | $13.32 | $0.00 | $13.32 Bottom 10% -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE | $13.64 | $0.00 | $13.64 -40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE | $12.91 | $0.00 | $12.91 Bottom 10% -43% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $14.24 | $0.00 | $14.24 Bottom 10% -37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $13.36 | $0.00 | $13.36 Bottom 10% -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CONCRETE SAW | $11.70 | $0.00 | $11.70 -48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CONCRETE SAW | $11.64 | $0.00 | $11.64 Bottom 10% -49% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $14.98 | $0.00 | $14.98 -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $14.46 | $0.00 | $14.46 Bottom 10% -36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $12.00 | $0.00 | $12.00 Bottom 10% -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: LOADER | $12.85 | $0.00 | $12.85 Bottom 10% -43% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: LOADER | $12.76 | $0.00 | $12.76 Bottom 10% -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROLLER | $12.94 | $0.00 | $12.94 -43% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROLLER | $12.86 | $0.00 | $12.86 -43% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROLLER | $11.67 | $0.00 | $11.67 Bottom 10% -49% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: SCRAPER | $13.19 | $0.00 | $13.19 -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: SCRAPER | $13.06 | $0.00 | $13.06 -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: SCRAPER.$ 12.00 0.00 POWER EQUIPMENT OPERATOR: ROLLER | $12.73 | $0.00 | $12.73 -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR:.$ 13.61 0.00 POWER EQUIPMENT OPERATOR | $11.97 | $0.00 | $11.97 -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC SIGNAL INSTALLER | $17.37 | $0.00 | $17.37 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $12.00 | $0.00 | $12.00 -52% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $12.48 | $0.00 | $12.48 -50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $13.75 | $0.00 | $13.75 -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $13.90 | $0.00 | $13.90 -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $14.69 | $0.00 | $14.69 -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $12.88 | $0.00 | $12.88 -48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $12.32 | $0.00 | $12.32 -51% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER | $13.72 | $0.00 | $13.72 -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER | $12.37 | $0.00 | $12.37 Bottom 10% -50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER | $12.00 | $0.00 | $12.00 Bottom 10% -52% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Logan, OK — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Logan
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Logan, Oklahoma.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.