Highway Construction — Craig, Oklahoma

WD OK20260019-14407-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, EXCLUDES FORM WORK AND FORM SETTING in Craig, Oklahoma (construction type: highway) is $13.94/hr base + $0.00/hr fringe = $13.94/hr total package (WD OK20260019-14407-hwy, Rev. 1).

Scroll down for all 67 trade classifications covered by this determination.

WD Number: OK20260019-14407-hwy
Revision: 1
Construction Type: highway
State: Oklahoma (OK)
County: Craig
Effective: May 17, 2026
Trades covered: 67
Official source: SAM.gov reference OK20260019View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, EXCLUDES FORM WORK AND FORM SETTING $13.94 $0.00 $13.94 Above median -39% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK AND FORM SETTING $13.48 $0.00 $13.48 Bottom 10% -41% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK AND FORM SETTING $13.69 $0.00 $13.69 -40% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK AND FORM SETTING $14.00 $0.00 $14.00 Top 10% -39% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK AND FORM SETTING $13.70 $0.00 $13.70 Above median -40% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.24 $0.00 $14.24 -37% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $13.27 $0.00 $13.27 -41% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER.$ 13.70 0.00 CEMENT MASON/CONCRETE FINISHER $14.72 $1.35 $16.07 Top 10% -29% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER/FORM SETTER $12.30 $0.00 $12.30 Top 10% $0.00 $0.00 $0.00 $0.00
GUARDRAIL INSTALLER $9.70 $0.00 $9.70 Bottom 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $13.63 $0.00 $13.63 Bottom 10% -41% vs market $0.00 $0.00 $0.00 $0.00
LABORER $12.70 $0.00 $12.70 -34% vs market $0.00 $0.00 $0.00 $0.00
LABORER $11.13 $0.00 $11.13 -42% vs market $0.00 $0.00 $0.00 $0.00
LABORER $12.41 $0.00 $12.41 -35% vs market $0.00 $0.00 $0.00 $0.00
LABORER (AIR/POWER TOOL OPERATOR) $12.79 $0.00 $12.79 Top 10% -34% vs market $0.00 $0.00 $0.00 $0.00
LABORER (TRAFFIC CONTROL) $10.28 $0.00 $10.28 -47% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $10.64 $0.00 $10.64 Above median -45% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $10.55 $0.00 $10.55 Above median -45% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $10.68 $0.00 $10.68 Above median -44% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $10.07 $0.00 $10.07 -48% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $11.16 $0.00 $11.16 Above median -42% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $11.12 $0.00 $11.12 Above median -42% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $11.96 $0.00 $11.96 Top 10% -38% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $14.66 $0.00 $14.66 -35% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $12.38 $0.75 $13.13 -42% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $12.83 $0.00 $12.83 -43% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $11.54 $0.00 $11.54 Bottom 10% -49% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $14.13 $0.00 $14.13 -38% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $17.33 $0.00 $17.33 -24% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $14.56 $0.00 $14.56 -36% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $14.87 $0.00 $14.87 -34% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $16.47 $0.00 $16.47 -27% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $14.75 $0.00 $14.75 -35% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $13.34 $0.00 $13.34 -41% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $18.63 $0.00 $18.63 -18% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $14.65 $0.00 $14.65 -35% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $12.56 $0.00 $12.56 -45% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $14.70 $0.00 $14.70 -35% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: (ROLLER) $12.44 $0.00 $12.44 Above median -45% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE $16.13 $0.00 $16.13 Above median -29% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE $14.99 $0.00 $14.99 -34% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $14.61 $0.00 $14.61 -36% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $14.33 $0.00 $14.33 Bottom 10% -37% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER $13.66 $0.00 $13.66 Bottom 10% -40% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER $13.83 $0.00 $13.83 -39% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MECHANIC $18.77 $0.00 $18.77 -17% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MECHANIC $18.96 $0.00 $18.96 -16% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: OILER $14.59 $0.00 $14.59 -36% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: OILER $13.38 $0.00 $13.38 Bottom 10% -41% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $13.48 $0.00 $13.48 -41% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $12.58 $0.00 $12.58 -45% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $13.12 $0.00 $13.12 -42% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:.$ 14.42 0.00 POWER EQUIPMENT OPERATOR $11.02 $0.00 $11.02 Bottom 10% -51% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:..$ 14.84 0.00 POWER EQUIPMENT OPERATOR $14.77 $0.00 $14.77 Top 10% -35% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $13.44 $0.00 $13.44 -46% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $15.92 $0.00 $15.92 Above median -36% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $13.64 $0.00 $13.64 -45% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $15.20 $0.69 $15.89 Above median -36% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $16.18 $0.00 $16.18 Above median -35% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $14.22 $0.00 $14.22 -43% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER (SINGLE AXLE TRUCK) $13.15 $0.00 $13.15 Top 10% -47% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $13.91 $0.00 $13.91 -44% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $13.93 $0.00 $13.93 -44% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER $15.75 $0.00 $15.75 Above median -37% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER $16.14 $0.00 $16.14 Above median -35% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER $16.93 $0.00 $16.93 Top 10% -32% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER $15.15 $0.00 $15.15 Above median -39% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Craig, OK — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Craig

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for OK20260019-14407-hwy →