Building Construction — Carter, Oklahoma

WD OK20260037-14382-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BOILERMAKER in Carter, Oklahoma (construction type: building) is $33.70/hr base + $24.41/hr fringe = $58.11/hr total package (WD OK20260037-14382-bld, Rev. 1).

Scroll down for all 29 trade classifications covered by this determination.

WD Number: OK20260037-14382-bld
Revision: 1
Construction Type: building
State: Oklahoma (OK)
County: Carter
Effective: May 17, 2026
Trades covered: 29
Official source: SAM.gov reference OK20260037View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $33.70 $24.41 $58.11 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $20.00 $0.00 $20.00 -12% vs market $0.00 $0.00 $0.00 $0.00
CAPACITY CRANES. ALL TOWER CRANES $38.09 $19.05 $57.14 Top 10% $0.00 $0.00 $0.00 $0.00
CARPENTER $14.96 $0.00 $14.96 -35% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $16.20 $0.00 $16.20 -29% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK $16.19 $0.96 $17.15 Bottom 10% -25% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.50 $0.00 $14.50 -36% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $21.60 $0.00 $21.60 -25% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $21.51 $6.27 $27.78 -4% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LAYER $18.74 $1.10 $19.84 Top 10% +17% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $13.79 $0.92 $14.71 Above median $0.00 $0.00 $0.00 $0.00
GLAZIER $15.27 $1.46 $16.73 Bottom 10% -22% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $32.10 $17.38 $49.48 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $11.58 $0.77 $12.35 -36% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $12.00 $0.00 $12.00 -38% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $13.04 $0.00 $13.04 -32% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $11.65 $0.00 $11.65 -39% vs market $0.00 $0.00 $0.00 $0.00
LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER $35.40 $19.05 $54.45 Top 10% $0.00 $0.00 $0.00 $0.00
LESS THAN 200 TON CAPACITY $36.14 $19.05 $55.19 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $16.83 $0.00 $16.83 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $18.02 $0.00 $18.02 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $12.32 $0.00 $12.32 -44% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $41.00 $16.03 $57.03 +116% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $18.00 $3.23 $21.23 -19% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 10 OILER $27.25 $19.05 $46.30 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER $34.07 $19.05 $53.12 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $15.00 $0.29 $15.29 -32% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $33.38 $16.36 $49.74 +61% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $21.52 $6.00 $27.52 +4% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Carter, OK — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Carter

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for OK20260037-14382-bld →