Building Construction — Washington, Ohio

WD OH20260104-17010-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Washington, Ohio (construction type: building) is $38.05/hr base + $30.87/hr fringe = $68.92/hr total package (WD OH20260104-17010-bld, Rev. 1).

Scroll down for all 32 trade classifications covered by this determination.

WD Number: OH20260104-17010-bld
Revision: 1
Construction Type: building
State: Ohio (OH)
County: Washington
Effective: May 17, 2026
Trades covered: 32
Official source: SAM.gov reference OH20260104View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $38.05 $30.87 $68.92 Above median +153% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $26.54 $11.28 $37.82 +23% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $24.74 $11.86 $36.60 +31% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $26.07 $12.34 $38.41 Above median +29% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.00 $33.32 $73.32 Above median +140% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $36.00 $23.57 $59.57 +73% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $29.81 $20.72 $50.53 +46% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $36.10 $24.65 $60.75 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $21.30 $7.87 $29.17 Above median +22% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $34.62 $12.95 $47.57 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $29.55 $10.90 $40.45 Above median +70% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $23.98 $8.58 $32.56 Above median +36% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $30.26 $12.58 $42.84 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $22.55 $8.03 $30.58 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $29.56 $11.82 $41.38 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $29.66 $12.61 $42.27 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $27.56 $16.37 $43.93 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $30.28 $13.29 $43.57 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $28.83 $12.72 $41.55 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $20.37 $10.63 $31.00 +20% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $40.92 $37.20 $78.12 Above median +160% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $47.48 $27.14 $74.62 Above median +148% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $32.92 $19.66 $52.58 Above median +75% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $44.14 $16.41 $60.55 Above median +102% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $28.87 $19.66 $48.53 +62% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $32.42 $19.66 $52.08 Above median +74% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $32.10 $21.45 $53.55 Above median +97% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $29.75 $25.51 $55.26 +83% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 32.89 20.81 PAINTER: SPRAY $22.78 $12.40 $35.18 +16% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $28.31 $10.45 $38.76 +63% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $29.92 $16.77 $46.69 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $22.78 $12.61 $35.39 Above median +27% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Washington, OH — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Washington

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for OH20260104-17010-bld →