Residential Construction — Summit, Ohio

WD OH20260020-14445-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Summit, Ohio (construction type: residential) is $36.89/hr base + $22.13/hr fringe = $59.02/hr total package (WD OH20260020-14445-res, Rev. 1).

Scroll down for all 13 trade classifications covered by this determination.

WD Number: OH20260020-14445-res
Revision: 1
Construction Type: residential
State: Ohio (OH)
County: Summit
Effective: May 17, 2026
Trades covered: 13
Official source: SAM.gov reference OH20260020View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $36.89 $22.13 $59.02 Above median +92% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $18.23 $7.67 $25.90 -8% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $27.04 $0.00 $27.04 -9% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $23.34 $14.21 $37.55 +23% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $18.03 $0.00 $18.03 Above median -24% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER-BRICK $25.90 $18.40 $44.30 +86% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $29.49 $11.16 $40.65 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $33.95 $20.20 $54.15 Above median +110% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $20.00 $5.52 $25.52 -15% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $38.63 $15.20 $53.83 Above median +79% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $36.92 $24.01 $60.93 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $16.85 $3.83 $20.68 -24% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $22.78 $13.06 $35.84 +18% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Summit, OH — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Summit

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for OH20260020-14445-res →