Building Construction — Stark, Ohio

WD OH20260106-14365-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Stark, Ohio (construction type: building) is $46.50/hr base + $29.43/hr fringe = $75.93/hr total package (WD OH20260106-14365-bld, Rev. 1).

Scroll down for all 32 trade classifications covered by this determination.

WD Number: OH20260106-14365-bld
Revision: 1
Construction Type: building
State: Ohio (OH)
County: Stark
Effective: May 17, 2026
Trades covered: 32
Official source: SAM.gov reference OH20260106View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $46.50 $29.43 $75.93 Above median +179% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $35.59 $22.71 $58.30 Above median +89% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $33.09 $23.06 $56.15 +100% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION $24.30 $10.71 $35.01 Top 10% +25% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $26.07 $12.34 $38.41 Above median +29% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $25.15 $17.44 $42.59 +39% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $39.86 $29.19 $69.05 Above median +126% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $32.87 $15.17 $48.04 +64% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $32.62 $12.95 $45.57 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $34.62 $12.95 $47.57 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $29.55 $10.90 $40.45 Above median +70% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $23.98 $8.58 $32.56 Above median +36% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $30.26 $12.58 $42.84 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $22.55 $8.03 $30.58 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $29.51 $11.77 $41.28 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $29.66 $12.61 $42.27 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $27.56 $16.37 $43.93 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $30.28 $13.29 $43.57 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $28.83 $12.72 $41.55 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $31.93 $18.15 $50.08 Above median +94% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $40.92 $37.20 $78.12 Above median +160% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $47.48 $27.14 $74.62 Above median +148% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $32.92 $19.66 $52.58 Above median +75% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $44.14 $16.41 $60.55 Above median +102% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $28.87 $19.66 $48.53 +62% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $32.42 $19.66 $52.08 Above median +74% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $32.10 $21.45 $53.55 Above median +97% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $37.66 $32.23 $69.89 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 34.16 0.00 PAINTER: SPRAY $22.78 $12.40 $35.18 +16% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $25.37 $17.42 $42.79 +80% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $33.46 $21.37 $54.83 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $22.78 $12.61 $35.39 Above median +27% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Stark, OH — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Stark

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for OH20260106-14365-bld →