Heavy Construction — Seneca, Ohio

WD OH20260001-14513-hvy · Revision 2 · Effective May 19, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Seneca, Ohio (construction type: heavy) is $32.40/hr base + $19.30/hr fringe = $51.70/hr total package (WD OH20260001-14513-hvy, Rev. 2).

Scroll down for all 270 trade classifications covered by this determination.

WD Number: OH20260001-14513-hvy
Revision: 2
Construction Type: heavy
State: Ohio (OH)
County: Seneca
Effective: May 19, 2026
Trades covered: 270
Official source: SAM.gov reference OH20260001View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $32.40 $19.30 $51.70 +68% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER (COLUMBIANA, MAHONING & TRUMBULL) $33.39 $20.06 $53.45 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON $33.39 $20.06 $53.45 Above median +74% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON $32.40 $19.30 $51.70 +68% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON $35.39 $17.47 $52.86 +72% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON (ASHLAND, CRAWFORD, HARDIN, HOLMES, MARION, MORROW, RICHLAND, WAYNE AND WYANDOT COUNTIES) FOOTNOTE: LAYOUT MAN AND SAWMAN RATE $33.39 $20.06 $53.45 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON (BROWN, BUTLER, CLERMONT, HAMILTON, PREBLE & WARREN COUNTIES:) $33.39 $20.06 $53.45 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON (CARROLL, COLUMBIANA, STARK & TUSCARAWAS) $33.39 $20.06 $53.45 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON (CHAMPAIGN, CLARK, CLINTON, DARKE, GREENE, HIGHLAND, LOGAN, MIAMI, MONTGOMERY, PREBLE AND SHELBY COUNTIES) $33.39 $20.06 $53.45 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON (COLUMBIANA & JEFFERSON) $33.39 $20.06 $53.45 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON (COSHOCTON, FAIRFIELD, GUERNSEY, HOCKING, KNOX, KICKING, MORGAN, MUSKINGUM, NOBLE & PERRY COUNTIES:) $33.39 $20.06 $53.45 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON (DEFIANCE, FULTON, HENRY, PAULDING, PUTNAM AND WILLIAMS COUNTIES) $33.39 $20.06 $53.45 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON (ERIE, HANCOCK, HURON, OTTAWA, SANDUSKY, SENECA, WOOD AND WYANDOT COUNTIES & THE ISLANDS OF LAKE ERIE NORTH OF SANDUSKY) FOOTNO $33.39 $20.06 $53.45 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON (FULTON, HENRY, LUCAS AND WOOD COUNTIES) $33.39 $20.06 $53.45 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON (NOBLE AND WASHINGTON COUNTIES) $33.39 $20.06 $53.45 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: BRICKLAYERS; CAULKERS; CLEANERS; POINTERS; & STONEMASONS (CUYAHOGA, LORAIN & MEDINA) $36.64 $17.13 $53.77 Top 10% +75% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: SANDBLASTERS (CUYAHOGA, LORAIN & MEDINA) $36.39 $17.13 $53.52 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: SEWER BRICKLAYERS & STACK BUILDERS (CUYAHOGA, LORAIN & MEDINA) $36.64 $17.13 $53.77 Top 10% +75% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: SWING SCAFFOLDS (CUYAHOGA, LORAIN & MEDINA) $37.14 $17.13 $54.27 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
CABLE SPLICER $38.98 $18.96 $57.94 $0.00 $0.00 $0.00 $0.00
CABLE SPLICER $42.94 $27.74 $70.68 Above median $0.00 $0.00 $0.00 $0.00
CABLE SPLICER $32.68 $18.13 $50.81 Bottom 10% $0.00 $0.00 $0.00 $0.00
CABLE SPLICER (ASHTABULA, GEAUGA AND LAKE COUNTIES) $33.81 $21.47 $55.28 Top 10% $0.00 $0.00 $0.00 $0.00
CABLE SPLICER (ATHENS, MEIGS, MONROE, MORGAN, NOBLE, VINTON, AND WASHINGTON COUNITES) $40.25 $33.33 $73.58 Top 10% $0.00 $0.00 $0.00 $0.00
CABLE SPLICER (BUTLER AND WARREN COUNTIES) $30.50 $18.23 $48.73 Top 10% $0.00 $0.00 $0.00 $0.00
CABLE SPLICER (CHAMPAIGN, CLARK, DELAWARE, FAIRFIELD, FRANKLIN, MADISON, PICKAWAY, AND UNION COUNTIES) $44.00 $26.40 $70.40 Top 10% $0.00 $0.00 $0.00 $0.00
CABLE SPLICER (MEDINA, PORTAGE, SUMMIT & WAYNE) $46.81 $20.95 $67.76 Top 10% $0.00 $0.00 $0.00 $0.00
CARPENTER $33.19 $25.02 $58.21 Above median +108% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $32.50 $26.19 $58.69 Above median +109% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $35.94 $23.59 $59.53 Above median +112% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $34.07 $24.28 $58.35 Above median +108% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $33.38 $24.69 $58.07 Above median +107% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $37.18 $25.07 $62.25 Above median +122% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $35.44 $27.56 $63.00 Above median +125% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $32.05 $26.13 $58.18 Above median +107% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $31.80 $26.33 $58.13 Above median +107% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $38.57 $24.64 $63.21 Above median +125% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $34.67 $23.57 $58.24 Above median +108% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $38.42 $24.01 $62.43 Above median +123% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $36.71 $24.14 $60.85 Above median +117% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $33.74 $27.05 $60.79 Above median +117% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER & PILEDRIVERMEN $35.94 $23.59 $59.53 Above median +112% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $32.40 $19.30 $51.70 Above median +73% vs market $0.00 $0.00 $0.00 $0.00
DAYS' PAID VACATION; AFTER 20 YEARS' SERVICE - 20 DAYS' PAID VACATION C. FUNERAL LEAVE UP TO 3 DAYS MAXIMUM PAID LEAVE FOR DEATH OF MOTHER, FATHER, BR $20.61 $3.50 $24.11 Top 10% $0.00 $0.00 $0.00 $0.00
DIVER $40.58 $9.69 $50.27 Above median $0.00 $0.00 $0.00 $0.00
DIVER $39.41 $10.40 $49.81 Bottom 10% $0.00 $0.00 $0.00 $0.00
DIVER, WET $58.52 $24.91 $83.43 Top 10% $0.00 $0.00 $0.00 $0.00
DIVER, WET $49.82 $25.40 $75.22 Bottom 10% $0.00 $0.00 $0.00 $0.00
DIVER, WET $54.51 $27.50 $82.01 Above median $0.00 $0.00 $0.00 $0.00
DIVER, WET $54.36 $22.54 $76.90 Above median $0.00 $0.00 $0.00 $0.00
DIVER, WET $50.85 $24.82 $75.67 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $48.40 $25.24 $73.64 Above median +141% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $39.25 $31.23 $70.48 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $38.05 $22.97 $61.02 Above median +100% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.15 $29.35 $70.50 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (ADAMS, FAYETTE, HIGHLAND, HOCKING, JACKSON, PICKAWAY, PIKE, ROSS, SCIOTO & VINTON) $37.00 $22.26 $59.26 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (ALLEN, AUGLAIZE, HARDIN, LOGAN, MERCER, SHELBY, VAN WERT & WYANDOT) $39.17 $23.60 $62.77 Top 10% +105% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (ASHLAND, CRAWFORD, HURON, KNOX, MARION, MORROW, RICHLAND AND WYANDOT COUNTIES) $32.30 $21.83 $54.13 Top 10% +77% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (ASHTABULA, GEAUGA AND LAKE COUNTIES) $41.17 $24.58 $65.75 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (ASHTABULA, GEAUGA, MAHONING, PORTAGE, AND TRUMBULL) $42.20 $23.37 $65.57 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (ATHENS, MEIGS, MONROE, MORGAN, NOBLE, VINTON, AND WASHINGTON COUNITES) $40.00 $33.32 $73.32 Top 10% +140% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (BUTLER AND WARREN COUNTIES) $38.00 $24.16 $62.16 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (CARROLL, COLUMBIANA, HOLMES, MAHONING, STARK, TUSCARAWAS, AND WAYNE COUNTIES) $39.86 $29.19 $69.05 Top 10% +126% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (CHAMPAIGN, CLARK, DELAWARE, FAIRFIELD, FRANKLIN, MADISON, PICKAWAY, AND UNION COUNTIES) $43.00 $26.37 $69.37 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (CLINTON, DARKE, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN) $38.00 $22.49 $60.49 Top 10% +98% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (COLUMBIANA MAHONING, & TRUMBULL) $41.49 $21.81 $63.30 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (COSHOCTON, GUERNSEY, KNOX, LICKING, MUSKINGUM, PERRY, AND TUSCARAWAS COUNTIES) $39.60 $24.41 $64.01 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (ERIE & HURON) $42.95 $18.81 $61.76 Top 10% +102% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (LORAIN & MEDINA) $42.95 $18.81 $61.76 Top 10% +102% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (MEDINA, PORTAGE, SUMMIT & WAYNE) $42.55 $20.95 $63.50 Top 10% +108% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN FOOTNOTE: A. 1 1/2 PAID HOLIDAYS: THE LAST SCHEDULED WORKDAY PRIOR TO CHRISTMAS & 4 HOURS ON GOOD FRIDAY $44.00 $37.68 $81.68 Top 10% +167% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, EXCLUDING SOUND & COMMUNICATIONS WORK. FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANK $46.63 $24.92 $71.55 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LEVEL - $.50 PREMIUM PAINTER: SWING STAGE, CHAIR, SPIDERS, & CHERRY PICKERS ALL SURFACES 40 FT. OR OVER WHERE MATERIAL IS APPLIED TO OR LABOR PE $27.84 $18.54 $46.38 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER $36.10 $24.65 $60.75 +76% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (ADAMS, GALLIA, JACKSON, LAWRENCE & SCIOTO) $39.70 $29.59 $69.29 Top 10% +101% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (ALLEN, AUGLAIZE, BUTLER, CHAMPAIGN, CLARK, CLINTON, DARKE, GREENE, HIGHLAND (INSIDE LINES DRAWN FROM MARSHALL TO LYNCHBURG & FROM THE $37.39 $25.35 $62.74 Top 10% +82% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (ALLEN, DEFIANCE, MERCER, PAULDING, PUTNAM, VAN WERT, AND WILLIAMS COUNTIES) $38.00 $26.39 $64.39 Top 10% +86% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (BELMONT, GUERNSEY, HARRISON, JEFFERSON, MONROE & MUSKINGUM) $35.19 $25.66 $60.85 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (CHAMPAIGN, CLARK, COSHOCTON, CRAWFORD, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, HARDIN, HIGHLAND, HOCKING, JACKSON, KNOX, LICKING, LOGAN, M $40.87 $23.15 $64.02 Top 10% +85% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING (ADAMS, BROWN, BUTLER, CLERMONT, CLINTON, HAMILTON, HIGHLAND AND WARREN COUNTIES) $38.27 $23.90 $62.17 Top 10% +80% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ALL OTHER WORK (CRAWFORD, DEFIANCE, ERIE, FULTON, HANCOCK, HARDIN, HENRY, HURON (WEST OF A $29.77 $21.30 $51.07 Top 10% +48% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: FENCE ERECTOR (CLINTON, HAMILTON, HIGHLAND & WARREN) $35.88 $23.90 $59.78 Top 10% +73% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: FENCE ERECTOR (CRAWFORD, DEFIANCE, ERIE, FULTON, HANCOCK, HARDIN, HENRY, HURON (WEST OF A $29.77 $21.30 $51.07 Top 10% +48% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: FLAT ROAD MESH (CRAWFORD, DEFIANCE, ERIE, FULTON, HANCOCK, HARDIN, HENRY, HURON (WEST OF A $26.40 $24.62 $51.02 Top 10% +48% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: LAYOUT; SHEETER (ASHTABULA, COLUMBIANA, MAHONING, PORTAGE & TRUMBULL) $37.26 $28.16 $65.42 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL, REINFORCING, & STRUCTURAL (ASHTABULA, CUYAHOGA, ERIE, GEAUGA, HURON, LAKE, LORAIN, MEDINA, PORTAGE, AND SUMMIT COUNTIES) $36.83 $29.01 $65.84 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL; REINFORCING; STRUCTURAL (ASHTABULA, COLUMBIANA, MAHONING, PORTAGE & TRUMBULL) $36.26 $28.16 $64.42 Top 10% +87% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL; STRUCTURAL (CLINTON, HAMILTON, HIGHLAND & WARREN) $37.77 $23.90 $61.67 Top 10% +79% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL, INCLUDING METAL BUILDING ERECTION & REINFORCING (ASHTABULA) $36.83 $29.01 $65.84 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: TUNNES & CAISSONS UNDER PRESSURE (CRAWFORD, DEFIANCE, ERIE, FULTON, HANCOCK, HARDIN, HENRY, HURON (WEST OF A $35.50 $29.20 $64.70 Top 10% +87% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKERS: STRUCTURAL, ORNAMENTAL AND REINFORCING (ASHLAND, CARROLL, COLUMBIANA, COSHOCTON, HOLMES, HURON, MAHONING, MEDINA, PORTAGE, RICHLAND, STAR $34.70 $22.88 $57.58 Top 10% +67% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1- ASPHALT LABORER; CARPENTER TENDER; CONCRETE CURING APPLICATOR; DUMP MAN; GUARDRAIL AND FENCE INSTALLER; JOINT SETTER; LABORER; LANDSC $35.52 $14.45 $49.97 Bottom 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1- ASPHALT LABORER; CARPENTER TENDER; CONCRETE CURING APPLICATOR; DUMP MAN; GUARDRAIL AND FENCE INSTALLER; JOINT SETTER; LABORER; LANDSC $37.18 $14.45 $51.63 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1- ASPHALT LABORER; CARPENTER TENDER; CONCRETE CURING APPLICATOR; DUMP MAN; GUARDRAIL AND FENCE INSTALLER; JOINT SETTER; LABORER; LANDSC $35.95 $14.45 $50.40 Above median +111% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2- ASPHALT RAKER; CONCRETE PUDDLER; KETTLE MAN PIPELINE); MACHINE DRIVEN TOOLS; MASON TENDER; BRICK PAVER; MORTAR MIXER; POWER BUGGY OR $35.69 $14.45 $50.14 Bottom 10% +110% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2- ASPHALT RAKER; CONCRETE PUDDLER; KETTLE MAN PIPELINE); MACHINE DRIVEN TOOLS; MASON TENDER; BRICK PAVER; MORTAR MIXER; POWER BUGGY OR $37.35 $14.45 $51.80 Top 10% +117% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2- ASPHALT RAKER; CONCRETE PUDDLER; KETTLE MAN PIPELINE); MACHINE DRIVEN TOOLS; MASON TENDER; BRICK PAVER; MORTAR MIXER; POWER BUGGY OR $36.12 $14.45 $50.57 Above median +112% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3- BLASTER; MUCKER; POWDER PERSON; TOP LANDER; WRENCHER; YARNER; HAZARDOUS WASTE; CONCRETE SPECIALIST; CONCRETE CREW IN TUNNELS; CURB SE $36.02 $14.45 $50.47 Bottom 10% +112% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3- BLASTER; MUCKER; POWDER PERSON; TOP LANDER; WRENCHER; YARNER; HAZARDOUS WASTE; CONCRETE SPECIALIST; CONCRETE CREW IN TUNNELS; CURB SE $37.68 $14.45 $52.13 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3- BLASTER; MUCKER; POWDER PERSON; TOP LANDER; WRENCHER; YARNER; HAZARDOUS WASTE; CONCRETE SPECIALIST; CONCRETE CREW IN TUNNELS; CURB SE $36.45 $14.45 $50.90 Above median +113% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 4- MINER; & GUNITE NOZZLE PERSON TUNNEL LABORER WITH AIR-PRESSURIZED ADD $1.00 TO BASE RATE SIGNAL PERSON WILL RECEIVE THE RATE EQUAL TO $36.47 $14.45 $50.92 Bottom 10% +113% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 4- MINER; & GUNITE NOZZLE PERSON TUNNEL LABORER WITH AIR-PRESSURIZED ADD $1.00 TO BASE RATE SIGNAL PERSON WILL RECEIVE THE RATE EQUAL TO $38.13 $14.45 $52.58 Top 10% +120% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 4- MINER; & GUNITE NOZZLE PERSON TUNNEL LABORER WITH AIR-PRESSURIZED ADD $1.00 TO BASE RATE SIGNAL PERSON WILL RECEIVE THE RATE EQUAL TO $36.90 $14.45 $51.35 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SEWAGE PLANTS, WASTE PLANTS, WATER TREATMENT FACILITIES, PUMPING STATIONS, & ETHANOL PLANTS CONSTRUCTION $38.56 $14.45 $53.01 Top 10% +122% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: CABLE SPLICER : FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & CH $53.90 $23.19 $77.09 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: CABLE SPLICER FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & CHRI $53.90 $23.19 $77.09 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: EQUIPMENT OPERATOR $40.44 $17.71 $58.15 Above median +43% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: EQUIPMENT OPERATOR (ALLEN, HARDIN, VAN WERT & WYANDOT) FOOTNOTE: A. HALF DAY'S PAID HOLIDAY: THE LAST 4 HOURS OF THE WORKDAY PRIOR $32.95 $17.08 $50.03 Top 10% +23% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: EQUIPMENT OPERATOR: DOT/TRAFFIC SIGNAL & HIGHWAY LIGHTING PROJECTS $39.97 $18.79 $58.76 Top 10% +45% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: EQUIPMENT OPERATOR: MUNICIPAL POWER/TRANSIT PROJECTS $49.46 $21.60 $71.06 Top 10% +75% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN $29.07 $14.97 $44.04 +8% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (ALLEN, HARDIN, VAN WERT & WYANDOT): FOOTNOTE: A. HALF DAY'S PAID HOLIDAY: THE LAST 4 HOURS OF THE WORKDAY P $20.59 $13.62 $34.21 Top 10% -16% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN/TRUCK DRIVER FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DA $20.51 $13.84 $34.35 Top 10% -15% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN: DOT/TRAFFIC SIGNAL & HIGHWAY LIGHTING PROJECTS $31.10 $16.40 $47.50 Top 10% +17% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN: MUNICIPAL POWER/TRANSIT PROJECTS $38.47 $18.64 $57.11 Top 10% +41% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: HELI-ARC WELDING FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & C $47.17 $21.31 $68.48 Top 10% +69% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN & CABLE SPLICERS $46.02 $19.04 $65.06 Top 10% +60% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN (ALLEN, HARDIN, VAN WERT & WYANDOT) FOOTNOTE: A. HALF DAY'S PAID HOLIDAY: THE LAST 4 HOURS OF THE WORKDAY PRIOR TO CHRISTMA $47.07 $21.03 $68.10 Top 10% +68% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS $46.87 $21.22 $68.09 Top 10% +68% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMEN/CABLE SPLICER: DOT/TRAFFIC SIGNAL & HIGHWAY LIGHTING PROJECTS $43.89 $19.85 $63.74 Top 10% +57% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMEN/CABLE SPLICER: MUNICIPAL POWER/TRANSIT PROJECTS $54.96 $23.09 $78.05 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: OPERATOR - CLASS 1 FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & $37.50 $18.60 $56.10 Top 10% +38% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: OPERATOR - CLASS 2 FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & $32.81 $17.29 $50.10 Top 10% +23% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: TRAFFIC SIGNAL & LIGHTING TECHNICIAN FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; T $42.18 $19.91 $62.09 Top 10% +53% vs market $0.00 $0.00 $0.00 $0.00
MASON - STONE $33.39 $20.06 $53.45 Above median +155% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR; GROUT PUMP; GUNNITE MACHINE; HORIZONTAL DIRECTIONAL DRILL LOCATOR; SINGLE DRUM HOIST WITH OR WITHOUT TOWER; HUCK BOLTING MACHINE; HYDRAULIC $35.27 $24.30 $59.57 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR; GROUT PUMP; GUNNITE MACHINE; HORIZONTAL DIRECTIONAL DRILL LOCATOR; SINGLE DRUM HOIST WITH OR WITHOUT TOWER; HUCK BOLTING MACHINE; HYDRAULIC $38.47 $24.30 $62.77 Top 10% $0.00 $0.00 $0.00 $0.00
OR MORE YEARS' SERVICE $33.05 $14.91 $47.96 Bottom 10% $0.00 $0.00 $0.00 $0.00
OR MORE YEARS' SERVICE $34.30 $14.95 $49.25 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER COMMERCIAL NEW WORK; REMODELING; & RENOVATIONS: GROUP 1- BRUSH; & ROLLER (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE & SUMMIT) $30.75 $18.95 $49.70 Top 10% +93% vs market $0.00 $0.00 $0.00 $0.00
PAINTER COMMERCIAL NEW WORK; REMODELING; & RENOVATIONS: GROUP 2- SANDBLASTING & BUFFING (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE & SUMMIT) $31.15 $18.95 $50.10 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
PAINTER COMMERCIAL NEW WORK; REMODELING; & RENOVATIONS: GROUP 4- BRIDGE BLASTER (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE & SUMMIT) $37.01 $18.95 $55.96 Top 10% +117% vs market $0.00 $0.00 $0.00 $0.00
PAINTER COMMERCIAL REPAINT GROUP 1- BRUSH; & ROLLER (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE & SUMMIT) $29.25 $18.95 $48.20 Top 10% +87% vs market $0.00 $0.00 $0.00 $0.00
PAINTER COMMERCIAL REPAINT GROUP 3- SPRAY PAINTING..$ 29.95 18.95 PAINTER COMMERCIAL REPAINT GROUP 2- SANDBLASTING & BUFFING (ASHTABULA, CUYAHOGA, GEA $29.65 $18.95 $48.60 Top 10% +88% vs market $0.00 $0.00 $0.00 $0.00
PAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING BRIDGE EQUIPMENT TENDER AND CONTAINMENT BUILDER $21.95 $10.20 $32.15 Top 10% +25% vs market $0.00 $0.00 $0.00 $0.00
PAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING BRIDGES WHEN HIGHEST POINT OF CLEARANCE IS 60 FEET OR MORE; & LEAD ABATEMENT PROJECTS $26.30 $10.20 $36.50 Top 10% +42% vs market $0.00 $0.00 $0.00 $0.00
PAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING BRUSH & ROLLER $25.30 $10.20 $35.50 Top 10% +38% vs market $0.00 $0.00 $0.00 $0.00
PAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING SANDBLASTING & HOPPER TENDER; WATER BLASTING $26.05 $10.20 $36.25 Top 10% +41% vs market $0.00 $0.00 $0.00 $0.00
PAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING SPRAY $25.80 $10.20 $36.00 Top 10% +40% vs market $0.00 $0.00 $0.00 $0.00
PAINTER NEW COMMERCIAL WORK GROUP 1- BRUSH; SPRAY & SANDBLASTING POT TENDER. REPAINT IS 90% OF GROUP RATE $33.66 $23.88 $57.54 Top 10% +123% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BASE RATE $24.83 $10.00 $34.83 Top 10% +35% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRIDGE EQUIPMENT TENDERS AND CONTAINMENT BUILDERS $27.93 $7.25 $35.18 Top 10% +36% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRIDGES $37.26 $15.16 $52.42 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRIDGES, LOCKS, DAMS & TENSION TOWERS $27.83 $10.00 $37.83 Top 10% +47% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRIDGES, LOCKS, DAMS, TENSION TOWERS & ENERGIZED SUBSTATIONS $36.09 $19.49 $55.58 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRIDGES; BLASTERS; AND RIGGERS $34.60 $7.25 $41.85 Top 10% +62% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRIDGES; LOCKS; DAMS; TENSION TOWERS; & ENERGIZED SUBSTATIONS $36.44 $24.46 $60.90 Top 10% +136% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRIDGES; TOWERS, POLES & STACKS; SANDBLASTING STEEL; STRUCTURAL STEEL & METALIZING $33.18 $18.15 $51.33 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER $31.93 $18.15 $50.08 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER ALL SURFACES 40 FT. OR OVER WHERE MATERIAL IS APPLIED TO OR LABOR PERFORMED ON, ABOVE GROUND LEVEL, FLOOR LEVEL - $.50 PREMIUM $27.59 $18.54 $46.13 Top 10% +79% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $20.93 $7.25 $28.18 +9% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH; ROLLER $30.20 $15.16 $45.36 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING & TAPING: LL SURFACES 40 FT. OR OVER WHERE MATERIAL IS APPLIED TO OR LABOR PERFORMED ON, ABOVE GROUND LEVEL, FLOOR LEVEL $28.34 $18.54 $46.88 Top 10% +82% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: GROUP 1- BRIDGE EQUIPMENT TENDER; BRIDGE/CONTAINMENT BUILDER $21.95 $10.20 $32.15 Top 10% +25% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: GROUP 1- PAINTERS, BRUSH & ROLLER $30.64 $18.36 $49.00 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: GROUP 1: BRUSH & ROLLER $29.15 $13.97 $43.12 Top 10% +67% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: GROUP 2- BRIDGES $40.27 $18.36 $58.63 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: GROUP 2- BRUSH & ROLLER $25.30 $10.20 $35.50 Top 10% +38% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: GROUP 2- BRUSH; ROLLER; POWER TOOLS, UNDER 40 FEET..$ 35.02 21.54 PAINTER: GROUP 1- CONTAINMENT BUILDER $33.32 $21.54 $54.86 Top 10% +113% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: GROUP 2: SWING, SCAFFOLD BRIDGES; STRUCTURAL STEEL; OPEN ACID TANK; HIGH TENSION ELECTRICAL EQUIPMENT; & HOT PIPES $33.09 $13.97 $47.06 Top 10% +82% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: GROUP 3- SAND BLASTING; SPRAY; STEAM CLEANING; PRESSURE WASHING; EPOXY & TWO COMPONENT MATERIALS; LEAD ABATEMENT; HAZARDOUS WASTE; TOXIC MATE $36.72 $21.54 $58.26 Top 10% +126% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: GROUP 3- SPRAY $25.80 $10.20 $36.00 Top 10% +40% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: GROUP 3- STRUCTURAL STEEL $40.27 $18.36 $58.63 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: GROUP 3: SPRAY; SANDBLAST; STEAMCLEAN; LEAD ABATEMENT $29.90 $13.97 $43.87 Top 10% +70% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: GROUP 4- SANDBLASTING; & WATERBLASTING $26.05 $10.20 $36.25 Top 10% +41% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: GROUP 4- SPRAY, EXCEPT BAR JOIST/DECK $31.14 $18.36 $49.50 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: GROUP 4- STACKS; BRIDGES $40.03 $21.54 $61.57 Top 10% +139% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: GROUP 4: STEEPLEJACK WORK $30.10 $13.97 $44.07 Top 10% +71% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: GROUP 5- ELEVATED TANKS; STEEPLEJACK WORK; BRIDGE; & LEAD ABATEMENT $26.30 $10.20 $36.50 Top 10% +42% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: GROUP 5- EPOXY/MASTIC; SPRAY- BAR JOIST/DECK; WORKING ABOVE 50 FEET; AND SWINGSTAGES $31.29 $18.36 $49.65 Top 10% +93% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: GROUP 5: COAL TAR $30.65 $13.97 $44.62 Top 10% +73% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: GROUP 6- TANKS; SANDBLASTING $35.27 $18.36 $53.63 Top 10% +108% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: GROUP 7- TOWERS; STACKS $32.64 $18.36 $51.00 Top 10% +98% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: GROUP 8: BRIDGE BLASTER, RIGGER..$ 40.86 13.97 PAINTER: GROUP 7: TANKS, STACKS & TOWERS..$ 33.86 13.97 PAINTER: GROUP 6: BRIDGE EQUIPMENT TEN $37.86 $13.97 $51.83 Top 10% +101% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: LEAD ABATEMENT ALL SURFACES 40 FT. OR OVER WHERE MATERIAL IS APPLIED TO OR LABOR PERFORMED ON, ABOVE GROUND LEVEL, FLOOR LEVEL - $.50 PREMIUM $29.34 $18.54 $47.88 Top 10% +86% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: NEW COMMERCIAL WORK: GROUP 2- REFINERIES & REFINERY TANKS; SURFACES 30 FT. OR OVER WHERE MATERIAL IS APPLIED TO OR LABOR PERFORMED ON ABOVE G $34.66 $23.88 $58.54 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: NEW COMMERCIAL WORK: GROUP 3- SWING STAGE & CHAIR (FULTON, HENRY, LUCAS, OTTAWA & WOOD) REPAINT IS 90% OF GROUP RATE $34.66 $23.88 $58.54 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: NEW COMMERCIAL WORK: GROUP 4- LEAD ABATEMENT (FULTON, HENRY, LUCAS, OTTAWA & WOOD) REPAINT IS 90% OF GROUP RATE $34.66 $23.88 $58.54 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: NEW COMMERCIAL WORK: GROUP 5- ALL METHODS OF SPRAY (FULTON, HENRY, LUCAS, OTTAWA & WOOD) REPAINT IS 90% OF GROUP RATE $34.66 $23.88 $58.54 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: NEW COMMERCIAL WORK: GROUP 6- SOLVENT-BASED CATALIZED EPOXY MATERIALS OF 2 OR MORE COMPONENT MATERIALS, TO INCLUDE SOLVENT-BASED CONVERSION V $34.66 $23.88 $58.54 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: NEW COMMERCIAL WORK: GROUP 7- SPRAY SOLVENT BASED MATERIAL; SAND & ABRASIVE BLASTING (FULTON, HENRY, LUCAS, OTTAWA & WOOD) REPAINT IS 90% OF $34.66 $23.88 $58.54 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: NEW COMMERCIAL WORK: GROUP 8- TOWERS; TANKS; BRIDGES; STACKS OVER 30 FEET (FULTON, HENRY, LUCAS, OTTAWA & WOOD) REPAINT IS 90% OF GROUP RATE $34.66 $23.88 $58.54 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: NEW COMMERCIAL WORK: GROUP 9- EPOXY SPRAY (FULTON, HENRY, LUCAS, OTTAWA & WOOD) REPAINT IS 90% OF GROUP RATE $34.66 $23.88 $58.54 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: POWER GENERATING FACILITIES $33.29 $24.46 $57.75 Top 10% +124% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: POWER GENERATING FACILITIES $32.94 $19.49 $52.43 Bottom 10% +103% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SANDBLASTING; STEAM CLEANING; WATERBLASTING; AND HAZARDOUS WORK $25.82 $7.25 $33.07 Top 10% +28% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SANDBLASTING; STEAMCLEANING; WATERBLASTING& HAZARDOUS WORK $32.35 $15.16 $47.51 Top 10% +84% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $21.40 $7.25 $28.65 +11% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $32.15 $15.16 $47.31 Above median +83% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY, SANDBLASTING PRESSURE CLEANING, & REFINERY ALL SURFACES 40 FT. OR OVER WHERE MATERIAL IS APPLIED TO OR LABOR PERFORMED ON, ABOVE GROUN $28.34 $18.54 $46.88 Top 10% +82% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY; TANK INTERIOR & EXTERIOR $32.78 $18.15 $50.93 Top 10% +97% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: STACKS; TANKS; & TOWERS $34.46 $15.16 $49.62 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: STRUCTURAL STEEL & SWING STAGE $30.50 $15.16 $45.66 Top 10% +77% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: STRUCTURAL STEEL AND SWING STAGE $25.42 $7.25 $32.67 Top 10% +27% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: TANKS; STACKS; AND TOWERS $28.63 $7.25 $35.88 Top 10% +39% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: GROUP 1- BRUSH, ROLLER & PAPERHANGER (MEDINA, PORTAGE, AND SUMMIT COUNTIES) $31.93 $18.15 $50.08 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: GROUP 2- EPOXY APPLICATION (MEDINA, PORTAGE, AND SUMMIT COUNTIES) $32.58 $18.15 $50.73 Top 10% +97% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: GROUP 3- SWING SCAFFOLD, BOSUM CHAIR, & WINDOW JACK (MEDINA, PORTAGE, AND SUMMIT COUNTIES) $32.68 $18.15 $50.83 Top 10% +97% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: GROUP 4- SPRAY GUN OPERATOR OF ANY & ALL COATINGS (MEDINA, PORTAGE, AND SUMMIT COUNTIES) $32.78 $18.15 $50.93 Top 10% +97% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: GROUP 5- SANDBLAST, PAINTING OF STANDPIPES, ETC. FROM SCAFFOLDS, BRIDGE WORK AND/OR OPEN STRUCTURAL STEEL, STANDPIPES AND/OR WATER TOWERS (M $33.18 $18.15 $51.33 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: GROUP 6- PUBLIC & COMMERCE TRANSPORTATION, STEEL OR GALVANIZED, BRIDGES, TUNNELS & RELATED SUPPORT ITEMS (MEDINA, PORTAGE, AND SUMMIT COUNTI $38.60 $18.15 $56.75 Top 10% +120% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: GROUP 7- SYNTHETIC EXTERIOR, DRYWALL FINISHER AND/OR TAPER, DRYWALL FINISHER AND FOLLOW-UP MAN USING AUTOMATIC TOOLS (MEDINA, PORTAGE, AND S $33.18 $18.15 $51.33 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $35.94 $23.59 $59.53 $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $39.01 $24.91 $63.92 Above median $0.00 $0.00 $0.00 $0.00
PILEDRIVERMEN & DIVER'S TENDER DIVERS - $250.00 PER DAY $35.94 $28.39 $64.33 Bottom 10% $0.00 $0.00 $0.00 $0.00
PILEDRIVERMEN & DIVER'S TENDER DIVERS - $250.00 PER DAY $37.98 $28.63 $66.61 Top 10% $0.00 $0.00 $0.00 $0.00
PILEDRIVERMEN; DIVER, DRY $39.01 $24.91 $63.92 Top 10% $0.00 $0.00 $0.00 $0.00
PILEDRIVERMEN; DIVER, DRY $33.21 $25.40 $58.61 Bottom 10% $0.00 $0.00 $0.00 $0.00
PILEDRIVERMEN; DIVER, DRY $36.34 $27.50 $63.84 Above median $0.00 $0.00 $0.00 $0.00
PILEDRIVERMEN; DIVER, DRY $36.24 $22.54 $58.78 Above median $0.00 $0.00 $0.00 $0.00
PILEDRIVERMEN; DIVER, DRY $33.90 $24.82 $58.72 $0.00 $0.00 $0.00 $0.00
PIPEFITTER (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, MEDINA & SUMMIT) $49.17 $28.55 $77.72 Top 10% +159% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $33.00 $23.83 $56.83 Above median +87% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $31.35 $17.65 $49.00 +61% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $29.63 $17.11 $46.74 +54% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $28.86 $17.11 $45.97 +51% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $28.21 $17.11 $45.32 +49% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $36.65 $25.60 $62.25 Above median +105% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $35.29 $23.07 $58.36 Above median +92% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, MEDINA & SUMMIT) $44.86 $30.03 $74.89 Top 10% +149% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER AND STEAMFITTER (BELMONT & MONROE) $35.94 $37.35 $73.29 Top 10% +144% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER AND STEAMFITTER (MEDINA, PORTAGE, AND SUMMIT COUNTIES) $46.87 $28.39 $75.26 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, PIPEFITTER, STEAMFITTER $43.02 $26.45 $69.47 +131% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, PIPEFITTER, STEAMFITTER $51.00 $32.56 $83.56 Top 10% +178% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, PIPEFITTER, STEAMFITTER $43.05 $27.18 $70.23 +134% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, PIPEFITTER, STEAMFITTER $53.00 $27.59 $80.59 Above median +168% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, PIPEFITTER, STEAMFITTER $42.65 $28.56 $71.21 Above median +137% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, PIPEFITTER, STEAMFITTER $42.76 $30.81 $73.57 Above median +145% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, PIPEFITTER, STEAMFITTER (CARROLL, COLUMBIANA, COSHOCTON, GUERNSEY, HARRISON, HOLMES, JEFFERSON, MORGAN, MUSKINGUM, NOBLE, AND TUSCARAWAS COUN $39.32 $37.60 $76.92 Top 10% +156% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $43.30 $27.40 $70.70 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER (CARROLL, STARK, AND WAYNE COUNTIES) $47.48 $27.14 $74.62 Top 10% +148% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER (COLUMBIANA, MAHONING AND TRUMBULL COUNTIES) $40.55 $29.25 $69.80 Top 10% +132% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER (MEIGS, MONROE, MORGAN & WASHINGTON) $40.92 $37.20 $78.12 Top 10% +160% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1 (ADAMS, ALLEN, ASHLAND, ATHENS, AUGLAIZE, BELMONT, BROWN, BUTLER, CARROLL, CHAMPAIGN, CLARK, CLERMONT, CLINTON, COSHO $44.14 $16.41 $60.55 Top 10% +102% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1 AIR COMPRESSOR ON STEEL ERECTION; BARRIER MOVING MACHINE; BOILER OPERATOR ON COMPRESSOR OR GENERATOR WHEN MOUNTED ON $45.63 $16.41 $62.04 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2 (ADAMS, ALLEN, ASHLAND, ATHENS, AUGLAIZE, BELMONT, BROWN, BUTLER, CARROLL, CHAMPAIGN, CLARK, CLERMONT, CLINTON, COSHO $44.02 $16.41 $60.43 Top 10% +101% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2 ASPHALT PAVER; AUTOMATIC SUBGRADER MACHINE, SELF-PROPELLED; BOBCAT TYPE AND/OR SKID STEER LOADER WITH HOE ATTACHMENT $45.53 $16.41 $61.94 Top 10% +106% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 3 (ADAMS, ALLEN, ASHLAND, ATHENS, AUGLAIZE, BELMONT, BROWN, BUTLER, CARROLL, CHAMPAIGN, CLARK, CLERMONT, CLINTON, COSHO $42.98 $16.41 $59.39 Top 10% +98% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 3 A-FRAME; AIR COMPRESSOR ON TUNNEL WORK; ASPHALT PLANT ENGINEER; BOBCAT-TYPE AND/OR SKID STEER LOADER WITH OR WITHOUT $44.49 $16.41 $60.90 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 4 (ADAMS, ALLEN, ASHLAND, ATHENS, AUGLAIZE, BELMONT, BROWN, BUTLER, CARROLL, CHAMPAIGN, CLARK, CLERMONT, CLINTON, COSHO $41.80 $16.41 $58.21 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 5 (ADAMS, ALLEN, ASHLAND, ATHENS, AUGLAIZE, BELMONT, BROWN, BUTLER, CARROLL, CHAMPAIGN, CLARK, CLERMONT, CLINTON, COSHO $36.34 $16.41 $52.75 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 5 COMPRESSOR; DRUM FIREPERSON; GENERATOR; MASONRY FORK LIFT; INBOARD-OUTBOARD MOTOR BOAT LAUNCH; OIL HEATER; OILER/HELP $43.27 $16.41 $59.68 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 6 (ADAMS, ALLEN, ASHLAND, ATHENS, AUGLAIZE, BELMONT, BROWN, BUTLER, CARROLL, CHAMPAIGN, CLARK, CLERMONT, CLINTON, COSHO $45.14 $16.41 $61.55 Top 10% +105% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 6 MASTER MECHANIC & BOOM FROM 150 TO 180 $46.63 $16.41 $63.04 Top 10% +110% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 7 (ADAMS, ALLEN, ASHLAND, ATHENS, AUGLAIZE, BELMONT, BROWN, BUTLER, CARROLL, CHAMPAIGN, CLARK, CLERMONT, CLINTON, COSHO $45.14 $16.41 $61.55 Top 10% +105% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 7 BOOM FROM 180 AND OVER $46.63 $16.41 $63.04 Top 10% +110% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 1- RIG, PILE DRIVER OR CAISSON TYPE; & RIG, PILE HYDRAULIC UNIT ATTACHED $37.19 $24.30 $61.49 Top 10% +105% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 2 - ASPHALT HEATER PLANER; BACKFILLER WITH DRAG ATTACHMENT; BACKHOE; BACKHOE WITH SHEAR ATTACHED; BACKH $36.92 $24.30 $61.22 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 3 - ASPHALT PLANT; BENDING MACHINE; BORING MACHINE, MOTOR DRIVEN; CHIP HARVESTER WITHOUT BOOM; CLEANING $32.06 $24.30 $56.36 Top 10% +88% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 4 - AIR CURTAIN DESTRUCTOR & SIMILAR TYPE; BATCH PLANT-JOB RELATED; BOILER OPERATOR; COMPRESSOR; CONVEY $28.77 $24.30 $53.07 Top 10% +77% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 5 - BRAKEPERSON; FIREPERSON; & OILER $25.94 $24.30 $50.24 Top 10% +67% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 1 - A & B- RIG, PILE DRIVER OR CAISSON TYPE; & RIG, PILE HYDRAULIC UNIT ATTAC $44.63 $24.30 $68.93 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 2 - A & B - ASPHALT HEATER PLANER; BACKFILLER WITH DRAG ATTACHMENT; BACKHOE $44.30 $24.30 $68.60 Top 10% +129% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 4 - A & B - AIR CURTAIN DESTRUCTOR & SIMILAR TYPE; BATCH PLANT-JOB RELATED; B $34.52 $24.30 $58.82 Top 10% +96% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 5 - A & B - BRAKEPERSON; FIREPERSON; & OILER $31.13 $24.30 $55.43 Top 10% +85% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 1 - C & D - RIG, PILE DRIVER OR CAISSON TYPE; & RIG, PILE HYDRAULIC UNIT ATTACHED $40.91 $24.30 $65.21 Top 10% +117% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 2 - C & D - ASPHALT HEATER PLANER; BACKFILLER WITH DRAG ATTACHMENT; BACKHOE; BACKHOE WI $40.61 $24.30 $64.91 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 4 - C & D - AIR CURTAIN DESTRUCTOR & SIMILAR TYPE; BATCH PLANT-JOB RELATED; BOILER OPER $31.65 $24.30 $55.95 Top 10% +86% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 5 - C & D - BRAKEPERSON; FIREPERSON; & OILER $28.53 $24.30 $52.83 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
REFRACTORY $31.45 $19.01 $50.46 Top 10% $0.00 $0.00 $0.00 $0.00
SHALL BE ADDED TO THE RATE OF PAY FOR THE CLASSIFICATION OF WORK: WHILE WORKING SWINGSTAGE, BOATSWAIN CHAIR, NEEDLE BEAM AND HORIZONTAL CABLE. WHILE O $30.73 $17.52 $48.25 Top 10% $0.00 $0.00 $0.00 $0.00
SHALL BE ADDED TO THE RATE OF PAY FOR THE CLASSIFICATION OF WORK: WHILE WORKING SWINGSTAGE, BOATSWAIN CHAIR, NEEDLE BEAM AND HORIZONTAL CABLE. WHILE O $29.13 $17.52 $46.65 Bottom 10% $0.00 $0.00 $0.00 $0.00
SOUND & COMMUNICATION TECHNICIAN $24.35 $10.99 $35.34 Above median $0.00 $0.00 $0.00 $0.00
SOUND & COMMUNICATION TECHNICIAN: INSTALLER/TECHNICIAN (CLINTON, DARKE, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN) $27.70 $15.71 $43.41 Top 10% $0.00 $0.00 $0.00 $0.00
TANKS - WATER TOWERS; BRIDGE PAINTERS; BRIDGE RIGGERS; CONTAINMENT BUILDERS (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE & SUMMIT) $31.45 $18.95 $50.40 Top 10% $0.00 $0.00 $0.00 $0.00
TO OR LABOR PERFORMED ON, ABOVE GROUND LEVEL, FLOOR LEVEL - $.50 PREMIUM APPLYING COAL TAR PRODUCTS - $1.00 PREMIUM $28.34 $18.54 $46.88 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1- ASPHALT DISTRIBUTOR; BATCH; 4- WHEEL SERVICE; 4-WHEEL DUMP; OIL DISTRIBUTOR & TANDEM $34.26 $18.85 $53.11 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1- STRAIGHT & DUMP, STRAIGHT FUEL $34.92 $19.30 $54.22 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2- SEMI FUEL, SEMI TRACTOR, EUCLIDS, DARTS, TANK, ASPHALT SPREADERS, LOW BOYS, CARRY-ALL, TOURNA-ROCKERS, HI-LIFTS, EXTRA LONG TRA $35.73 $19.30 $55.03 Top 10% +97% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2- TRACTOR-TRAILER COMBINATION: FUEL; POLE TRAILER; READY MIX; SEMI-TRACTOR; & ASPHALT OIL SPRAYBAR MAN WHEN OPERATED FROM CAB; 5 $35.26 $18.85 $54.11 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Seneca, OH — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Seneca

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for OH20260001-14513-hvy →