Building Construction — Ottawa, Ohio

WD OH20260095-14511-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Ottawa, Ohio (construction type: building) is $37.00/hr base + $28.27/hr fringe = $65.27/hr total package (WD OH20260095-14511-bld, Rev. 1).

Scroll down for all 40 trade classifications covered by this determination.

WD Number: OH20260095-14511-bld
Revision: 1
Construction Type: building
State: Ohio (OH)
County: Ottawa
Effective: May 17, 2026
Trades covered: 40
Official source: SAM.gov reference OH20260095View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $37.00 $28.27 $65.27 Above median +140% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $36.53 $24.03 $60.56 Above median +97% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $28.22 $17.77 $45.99 +64% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $24.65 $9.95 $34.60 +23% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $26.45 $13.46 $39.91 Above median +34% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $20.77 $7.52 $28.29 Above median -14% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $48.40 $25.24 $73.64 Above median +141% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $27.81 $17.48 $45.29 +48% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: CABLE PULLER $13.02 $14.78 $27.80 -9% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $36.50 $25.06 $61.56 Above median +110% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $28.11 $17.83 $45.94 Above median +33% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $35.50 $29.20 $64.70 Above median +87% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $37.77 $23.90 $61.67 Above median +79% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE $32.35 $16.42 $48.77 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $18.39 $11.04 $29.43 Above median +23% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $23.98 $8.58 $32.56 Above median +36% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $29.99 $10.13 $40.12 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $30.26 $12.58 $42.84 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $28.07 $11.15 $39.22 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $29.66 $12.61 $42.27 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $27.56 $16.37 $43.93 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $30.28 $13.29 $43.57 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $28.83 $12.72 $41.55 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $33.66 $23.88 $57.54 Above median +123% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: FIREPROOFER $34.66 $23.88 $58.54 +127% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $34.66 $23.88 $58.54 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $51.00 $32.56 $83.56 Above median +178% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $27.45 $15.56 $43.01 +41% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $51.00 $32.56 $83.56 Above median +178% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $32.92 $19.66 $52.58 Above median +75% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $44.02 $16.41 $60.43 Above median +101% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $28.87 $19.66 $48.53 +62% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $32.42 $19.66 $52.08 Above median +74% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $29.07 $19.84 $48.91 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $39.58 $35.15 $74.73 Above median +147% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $48.28 $28.08 $76.36 Above median +154% vs market $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER/SETTER $36.53 $24.03 $60.56 Above median $0.00 $0.00 $0.00 $0.00
TILE FINISHER $30.78 $23.04 $53.82 Above median +126% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $36.53 $24.03 $60.56 Above median +155% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $24.32 $11.73 $36.05 Above median +29% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Ottawa, OH — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Ottawa

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for OH20260095-14511-bld →