Highway Construction — Noble, Ohio
WD OH20260001-17009-hwy · Revision 2 · Effective May 19, 2026
The Davis-Bacon prevailing wage for BRICKLAYER in Noble, Ohio (construction type: highway) is $32.40/hr base + $19.30/hr fringe = $51.70/hr total package (WD OH20260001-17009-hwy, Rev. 2).
Scroll down for all 270 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $32.40 | $19.30 | $51.70 +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER (COLUMBIANA, MAHONING & TRUMBULL) | $33.39 | $20.06 | $53.45 Top 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, STONEMASON | $33.39 | $20.06 | $53.45 Above median +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, STONEMASON | $32.40 | $19.30 | $51.70 +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, STONEMASON | $35.39 | $17.47 | $52.86 +72% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, STONEMASON (ASHLAND, CRAWFORD, HARDIN, HOLMES, MARION, MORROW, RICHLAND, WAYNE AND WYANDOT COUNTIES) FOOTNOTE: LAYOUT MAN AND SAWMAN RATE | $33.39 | $20.06 | $53.45 Top 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, STONEMASON (BROWN, BUTLER, CLERMONT, HAMILTON, PREBLE & WARREN COUNTIES:) | $33.39 | $20.06 | $53.45 Top 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, STONEMASON (CARROLL, COLUMBIANA, STARK & TUSCARAWAS) | $33.39 | $20.06 | $53.45 Top 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, STONEMASON (CHAMPAIGN, CLARK, CLINTON, DARKE, GREENE, HIGHLAND, LOGAN, MIAMI, MONTGOMERY, PREBLE AND SHELBY COUNTIES) | $33.39 | $20.06 | $53.45 Top 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, STONEMASON (COLUMBIANA & JEFFERSON) | $33.39 | $20.06 | $53.45 Top 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, STONEMASON (COSHOCTON, FAIRFIELD, GUERNSEY, HOCKING, KNOX, KICKING, MORGAN, MUSKINGUM, NOBLE & PERRY COUNTIES:) | $33.39 | $20.06 | $53.45 Top 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, STONEMASON (DEFIANCE, FULTON, HENRY, PAULDING, PUTNAM AND WILLIAMS COUNTIES) | $33.39 | $20.06 | $53.45 Top 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, STONEMASON (ERIE, HANCOCK, HURON, OTTAWA, SANDUSKY, SENECA, WOOD AND WYANDOT COUNTIES & THE ISLANDS OF LAKE ERIE NORTH OF SANDUSKY) FOOTNO | $33.39 | $20.06 | $53.45 Top 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, STONEMASON (FULTON, HENRY, LUCAS AND WOOD COUNTIES) | $33.39 | $20.06 | $53.45 Top 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, STONEMASON (NOBLE AND WASHINGTON COUNTIES) | $33.39 | $20.06 | $53.45 Top 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: BRICKLAYERS; CAULKERS; CLEANERS; POINTERS; & STONEMASONS (CUYAHOGA, LORAIN & MEDINA) | $36.64 | $17.13 | $53.77 Top 10% +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: SANDBLASTERS (CUYAHOGA, LORAIN & MEDINA) | $36.39 | $17.13 | $53.52 Top 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: SEWER BRICKLAYERS & STACK BUILDERS (CUYAHOGA, LORAIN & MEDINA) | $36.64 | $17.13 | $53.77 Top 10% +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: SWING SCAFFOLDS (CUYAHOGA, LORAIN & MEDINA) | $37.14 | $17.13 | $54.27 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CABLE SPLICER | $38.98 | $18.96 | $57.94 | $0.00 | $0.00 | $0.00 | $0.00 |
| CABLE SPLICER | $42.94 | $27.74 | $70.68 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| CABLE SPLICER | $32.68 | $18.13 | $50.81 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CABLE SPLICER (ASHTABULA, GEAUGA AND LAKE COUNTIES) | $33.81 | $21.47 | $55.28 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CABLE SPLICER (ATHENS, MEIGS, MONROE, MORGAN, NOBLE, VINTON, AND WASHINGTON COUNITES) | $40.25 | $33.33 | $73.58 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CABLE SPLICER (BUTLER AND WARREN COUNTIES) | $30.50 | $18.23 | $48.73 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CABLE SPLICER (CHAMPAIGN, CLARK, DELAWARE, FAIRFIELD, FRANKLIN, MADISON, PICKAWAY, AND UNION COUNTIES) | $44.00 | $26.40 | $70.40 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CABLE SPLICER (MEDINA, PORTAGE, SUMMIT & WAYNE) | $46.81 | $20.95 | $67.76 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $33.19 | $25.02 | $58.21 Above median +108% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $32.50 | $26.19 | $58.69 Above median +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $35.94 | $23.59 | $59.53 Above median +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $34.07 | $24.28 | $58.35 Above median +108% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $33.38 | $24.69 | $58.07 Above median +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $37.18 | $25.07 | $62.25 Above median +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $35.44 | $27.56 | $63.00 Above median +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $32.05 | $26.13 | $58.18 Above median +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $31.80 | $26.33 | $58.13 Above median +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $38.57 | $24.64 | $63.21 Above median +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $34.67 | $23.57 | $58.24 Above median +108% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $38.42 | $24.01 | $62.43 Above median +123% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $36.71 | $24.14 | $60.85 Above median +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $33.74 | $27.05 | $60.79 Above median +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER & PILEDRIVERMEN | $35.94 | $23.59 | $59.53 Above median +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $32.40 | $19.30 | $51.70 Above median +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DAYS' PAID VACATION; AFTER 20 YEARS' SERVICE - 20 DAYS' PAID VACATION C. FUNERAL LEAVE UP TO 3 DAYS MAXIMUM PAID LEAVE FOR DEATH OF MOTHER, FATHER, BR | $20.61 | $3.50 | $24.11 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVER | $40.58 | $9.69 | $50.27 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVER | $39.41 | $10.40 | $49.81 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVER, WET | $58.52 | $24.91 | $83.43 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVER, WET | $49.82 | $25.40 | $75.22 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVER, WET | $54.51 | $27.50 | $82.01 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVER, WET | $54.36 | $22.54 | $76.90 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVER, WET | $50.85 | $24.82 | $75.67 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $48.40 | $25.24 | $73.64 Above median +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $39.25 | $31.23 | $70.48 Above median +131% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $38.05 | $22.97 | $61.02 Above median +100% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $41.15 | $29.35 | $70.50 Above median +131% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (ADAMS, FAYETTE, HIGHLAND, HOCKING, JACKSON, PICKAWAY, PIKE, ROSS, SCIOTO & VINTON) | $37.00 | $22.26 | $59.26 Top 10% +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (ALLEN, AUGLAIZE, HARDIN, LOGAN, MERCER, SHELBY, VAN WERT & WYANDOT) | $39.17 | $23.60 | $62.77 Top 10% +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (ASHLAND, CRAWFORD, HURON, KNOX, MARION, MORROW, RICHLAND AND WYANDOT COUNTIES) | $32.30 | $21.83 | $54.13 Top 10% +77% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (ASHTABULA, GEAUGA AND LAKE COUNTIES) | $41.17 | $24.58 | $65.75 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (ASHTABULA, GEAUGA, MAHONING, PORTAGE, AND TRUMBULL) | $42.20 | $23.37 | $65.57 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (ATHENS, MEIGS, MONROE, MORGAN, NOBLE, VINTON, AND WASHINGTON COUNITES) | $40.00 | $33.32 | $73.32 Top 10% +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (BUTLER AND WARREN COUNTIES) | $38.00 | $24.16 | $62.16 Top 10% +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (CARROLL, COLUMBIANA, HOLMES, MAHONING, STARK, TUSCARAWAS, AND WAYNE COUNTIES) | $39.86 | $29.19 | $69.05 Top 10% +126% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (CHAMPAIGN, CLARK, DELAWARE, FAIRFIELD, FRANKLIN, MADISON, PICKAWAY, AND UNION COUNTIES) | $43.00 | $26.37 | $69.37 Top 10% +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (CLINTON, DARKE, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN) | $38.00 | $22.49 | $60.49 Top 10% +98% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (COLUMBIANA MAHONING, & TRUMBULL) | $41.49 | $21.81 | $63.30 Top 10% +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (COSHOCTON, GUERNSEY, KNOX, LICKING, MUSKINGUM, PERRY, AND TUSCARAWAS COUNTIES) | $39.60 | $24.41 | $64.01 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (ERIE & HURON) | $42.95 | $18.81 | $61.76 Top 10% +102% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (LORAIN & MEDINA) | $42.95 | $18.81 | $61.76 Top 10% +102% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (MEDINA, PORTAGE, SUMMIT & WAYNE) | $42.55 | $20.95 | $63.50 Top 10% +108% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN FOOTNOTE: A. 1 1/2 PAID HOLIDAYS: THE LAST SCHEDULED WORKDAY PRIOR TO CHRISTMAS & 4 HOURS ON GOOD FRIDAY | $44.00 | $37.68 | $81.68 Top 10% +167% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, EXCLUDING SOUND & COMMUNICATIONS WORK. FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANK | $46.63 | $24.92 | $71.55 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FLOOR LEVEL - $.50 PREMIUM PAINTER: SWING STAGE, CHAIR, SPIDERS, & CHERRY PICKERS ALL SURFACES 40 FT. OR OVER WHERE MATERIAL IS APPLIED TO OR LABOR PE | $27.84 | $18.54 | $46.38 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $36.10 | $24.65 | $60.75 +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (ADAMS, GALLIA, JACKSON, LAWRENCE & SCIOTO) | $39.70 | $29.59 | $69.29 Top 10% +101% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (ALLEN, AUGLAIZE, BUTLER, CHAMPAIGN, CLARK, CLINTON, DARKE, GREENE, HIGHLAND (INSIDE LINES DRAWN FROM MARSHALL TO LYNCHBURG & FROM THE | $37.39 | $25.35 | $62.74 Top 10% +82% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (ALLEN, DEFIANCE, MERCER, PAULDING, PUTNAM, VAN WERT, AND WILLIAMS COUNTIES) | $38.00 | $26.39 | $64.39 Top 10% +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (BELMONT, GUERNSEY, HARRISON, JEFFERSON, MONROE & MUSKINGUM) | $35.19 | $25.66 | $60.85 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (CHAMPAIGN, CLARK, COSHOCTON, CRAWFORD, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, HARDIN, HIGHLAND, HOCKING, JACKSON, KNOX, LICKING, LOGAN, M | $40.87 | $23.15 | $64.02 Top 10% +85% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING (ADAMS, BROWN, BUTLER, CLERMONT, CLINTON, HAMILTON, HIGHLAND AND WARREN COUNTIES) | $38.27 | $23.90 | $62.17 Top 10% +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ALL OTHER WORK (CRAWFORD, DEFIANCE, ERIE, FULTON, HANCOCK, HARDIN, HENRY, HURON (WEST OF A | $29.77 | $21.30 | $51.07 Top 10% +48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: FENCE ERECTOR (CLINTON, HAMILTON, HIGHLAND & WARREN) | $35.88 | $23.90 | $59.78 Top 10% +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: FENCE ERECTOR (CRAWFORD, DEFIANCE, ERIE, FULTON, HANCOCK, HARDIN, HENRY, HURON (WEST OF A | $29.77 | $21.30 | $51.07 Top 10% +48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: FLAT ROAD MESH (CRAWFORD, DEFIANCE, ERIE, FULTON, HANCOCK, HARDIN, HENRY, HURON (WEST OF A | $26.40 | $24.62 | $51.02 Top 10% +48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: LAYOUT; SHEETER (ASHTABULA, COLUMBIANA, MAHONING, PORTAGE & TRUMBULL) | $37.26 | $28.16 | $65.42 Top 10% +89% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL, REINFORCING, & STRUCTURAL (ASHTABULA, CUYAHOGA, ERIE, GEAUGA, HURON, LAKE, LORAIN, MEDINA, PORTAGE, AND SUMMIT COUNTIES) | $36.83 | $29.01 | $65.84 Top 10% +91% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL; REINFORCING; STRUCTURAL (ASHTABULA, COLUMBIANA, MAHONING, PORTAGE & TRUMBULL) | $36.26 | $28.16 | $64.42 Top 10% +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL; STRUCTURAL (CLINTON, HAMILTON, HIGHLAND & WARREN) | $37.77 | $23.90 | $61.67 Top 10% +79% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: STRUCTURAL, INCLUDING METAL BUILDING ERECTION & REINFORCING (ASHTABULA) | $36.83 | $29.01 | $65.84 Top 10% +91% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: TUNNES & CAISSONS UNDER PRESSURE (CRAWFORD, DEFIANCE, ERIE, FULTON, HANCOCK, HARDIN, HENRY, HURON (WEST OF A | $35.50 | $29.20 | $64.70 Top 10% +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKERS: STRUCTURAL, ORNAMENTAL AND REINFORCING (ASHLAND, CARROLL, COLUMBIANA, COSHOCTON, HOLMES, HURON, MAHONING, MEDINA, PORTAGE, RICHLAND, STAR | $34.70 | $22.88 | $57.58 Top 10% +67% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 1- ASPHALT LABORER; CARPENTER TENDER; CONCRETE CURING APPLICATOR; DUMP MAN; GUARDRAIL AND FENCE INSTALLER; JOINT SETTER; LABORER; LANDSC | $35.52 | $14.45 | $49.97 Bottom 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 1- ASPHALT LABORER; CARPENTER TENDER; CONCRETE CURING APPLICATOR; DUMP MAN; GUARDRAIL AND FENCE INSTALLER; JOINT SETTER; LABORER; LANDSC | $37.18 | $14.45 | $51.63 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 1- ASPHALT LABORER; CARPENTER TENDER; CONCRETE CURING APPLICATOR; DUMP MAN; GUARDRAIL AND FENCE INSTALLER; JOINT SETTER; LABORER; LANDSC | $35.95 | $14.45 | $50.40 Above median +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2- ASPHALT RAKER; CONCRETE PUDDLER; KETTLE MAN PIPELINE); MACHINE DRIVEN TOOLS; MASON TENDER; BRICK PAVER; MORTAR MIXER; POWER BUGGY OR | $35.69 | $14.45 | $50.14 Bottom 10% +110% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2- ASPHALT RAKER; CONCRETE PUDDLER; KETTLE MAN PIPELINE); MACHINE DRIVEN TOOLS; MASON TENDER; BRICK PAVER; MORTAR MIXER; POWER BUGGY OR | $37.35 | $14.45 | $51.80 Top 10% +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2- ASPHALT RAKER; CONCRETE PUDDLER; KETTLE MAN PIPELINE); MACHINE DRIVEN TOOLS; MASON TENDER; BRICK PAVER; MORTAR MIXER; POWER BUGGY OR | $36.12 | $14.45 | $50.57 Above median +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 3- BLASTER; MUCKER; POWDER PERSON; TOP LANDER; WRENCHER; YARNER; HAZARDOUS WASTE; CONCRETE SPECIALIST; CONCRETE CREW IN TUNNELS; CURB SE | $36.02 | $14.45 | $50.47 Bottom 10% +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 3- BLASTER; MUCKER; POWDER PERSON; TOP LANDER; WRENCHER; YARNER; HAZARDOUS WASTE; CONCRETE SPECIALIST; CONCRETE CREW IN TUNNELS; CURB SE | $37.68 | $14.45 | $52.13 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 3- BLASTER; MUCKER; POWDER PERSON; TOP LANDER; WRENCHER; YARNER; HAZARDOUS WASTE; CONCRETE SPECIALIST; CONCRETE CREW IN TUNNELS; CURB SE | $36.45 | $14.45 | $50.90 Above median +113% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 4- MINER; & GUNITE NOZZLE PERSON TUNNEL LABORER WITH AIR-PRESSURIZED ADD $1.00 TO BASE RATE SIGNAL PERSON WILL RECEIVE THE RATE EQUAL TO | $36.47 | $14.45 | $50.92 Bottom 10% +113% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 4- MINER; & GUNITE NOZZLE PERSON TUNNEL LABORER WITH AIR-PRESSURIZED ADD $1.00 TO BASE RATE SIGNAL PERSON WILL RECEIVE THE RATE EQUAL TO | $38.13 | $14.45 | $52.58 Top 10% +120% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 4- MINER; & GUNITE NOZZLE PERSON TUNNEL LABORER WITH AIR-PRESSURIZED ADD $1.00 TO BASE RATE SIGNAL PERSON WILL RECEIVE THE RATE EQUAL TO | $36.90 | $14.45 | $51.35 Above median +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: SEWAGE PLANTS, WASTE PLANTS, WATER TREATMENT FACILITIES, PUMPING STATIONS, & ETHANOL PLANTS CONSTRUCTION | $38.56 | $14.45 | $53.01 Top 10% +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: CABLE SPLICER : FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & CH | $53.90 | $23.19 | $77.09 Top 10% +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: CABLE SPLICER FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & CHRI | $53.90 | $23.19 | $77.09 Top 10% +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR | $40.44 | $17.71 | $58.15 Above median +43% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR (ALLEN, HARDIN, VAN WERT & WYANDOT) FOOTNOTE: A. HALF DAY'S PAID HOLIDAY: THE LAST 4 HOURS OF THE WORKDAY PRIOR | $32.95 | $17.08 | $50.03 Top 10% +23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR: DOT/TRAFFIC SIGNAL & HIGHWAY LIGHTING PROJECTS | $39.97 | $18.79 | $58.76 Top 10% +45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR: MUNICIPAL POWER/TRANSIT PROJECTS | $49.46 | $21.60 | $71.06 Top 10% +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN | $29.07 | $14.97 | $44.04 +8% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (ALLEN, HARDIN, VAN WERT & WYANDOT): FOOTNOTE: A. HALF DAY'S PAID HOLIDAY: THE LAST 4 HOURS OF THE WORKDAY P | $20.59 | $13.62 | $34.21 Top 10% -16% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN/TRUCK DRIVER FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DA | $20.51 | $13.84 | $34.35 Top 10% -15% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN: DOT/TRAFFIC SIGNAL & HIGHWAY LIGHTING PROJECTS | $31.10 | $16.40 | $47.50 Top 10% +17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN: MUNICIPAL POWER/TRANSIT PROJECTS | $38.47 | $18.64 | $57.11 Top 10% +41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: HELI-ARC WELDING FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & C | $47.17 | $21.31 | $68.48 Top 10% +69% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: LINEMAN & CABLE SPLICERS | $46.02 | $19.04 | $65.06 Top 10% +60% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: LINEMAN (ALLEN, HARDIN, VAN WERT & WYANDOT) FOOTNOTE: A. HALF DAY'S PAID HOLIDAY: THE LAST 4 HOURS OF THE WORKDAY PRIOR TO CHRISTMA | $47.07 | $21.03 | $68.10 Top 10% +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: LINEMAN FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS | $46.87 | $21.22 | $68.09 Top 10% +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: LINEMEN/CABLE SPLICER: DOT/TRAFFIC SIGNAL & HIGHWAY LIGHTING PROJECTS | $43.89 | $19.85 | $63.74 Top 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: LINEMEN/CABLE SPLICER: MUNICIPAL POWER/TRANSIT PROJECTS | $54.96 | $23.09 | $78.05 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: OPERATOR - CLASS 1 FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & | $37.50 | $18.60 | $56.10 Top 10% +38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: OPERATOR - CLASS 2 FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & | $32.81 | $17.29 | $50.10 Top 10% +23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: TRAFFIC SIGNAL & LIGHTING TECHNICIAN FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; T | $42.18 | $19.91 | $62.09 Top 10% +53% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MASON - STONE | $33.39 | $20.06 | $53.45 Above median +155% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR; GROUT PUMP; GUNNITE MACHINE; HORIZONTAL DIRECTIONAL DRILL LOCATOR; SINGLE DRUM HOIST WITH OR WITHOUT TOWER; HUCK BOLTING MACHINE; HYDRAULIC | $35.27 | $24.30 | $59.57 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR; GROUT PUMP; GUNNITE MACHINE; HORIZONTAL DIRECTIONAL DRILL LOCATOR; SINGLE DRUM HOIST WITH OR WITHOUT TOWER; HUCK BOLTING MACHINE; HYDRAULIC | $38.47 | $24.30 | $62.77 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OR MORE YEARS' SERVICE | $33.05 | $14.91 | $47.96 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OR MORE YEARS' SERVICE | $34.30 | $14.95 | $49.25 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER COMMERCIAL NEW WORK; REMODELING; & RENOVATIONS: GROUP 1- BRUSH; & ROLLER (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE & SUMMIT) | $30.75 | $18.95 | $49.70 Top 10% +93% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER COMMERCIAL NEW WORK; REMODELING; & RENOVATIONS: GROUP 2- SANDBLASTING & BUFFING (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE & SUMMIT) | $31.15 | $18.95 | $50.10 Top 10% +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER COMMERCIAL NEW WORK; REMODELING; & RENOVATIONS: GROUP 4- BRIDGE BLASTER (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE & SUMMIT) | $37.01 | $18.95 | $55.96 Top 10% +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER COMMERCIAL REPAINT GROUP 1- BRUSH; & ROLLER (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE & SUMMIT) | $29.25 | $18.95 | $48.20 Top 10% +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER COMMERCIAL REPAINT GROUP 3- SPRAY PAINTING..$ 29.95 18.95 PAINTER COMMERCIAL REPAINT GROUP 2- SANDBLASTING & BUFFING (ASHTABULA, CUYAHOGA, GEA | $29.65 | $18.95 | $48.60 Top 10% +88% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING BRIDGE EQUIPMENT TENDER AND CONTAINMENT BUILDER | $21.95 | $10.20 | $32.15 Top 10% +25% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING BRIDGES WHEN HIGHEST POINT OF CLEARANCE IS 60 FEET OR MORE; & LEAD ABATEMENT PROJECTS | $26.30 | $10.20 | $36.50 Top 10% +42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING BRUSH & ROLLER | $25.30 | $10.20 | $35.50 Top 10% +38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING SANDBLASTING & HOPPER TENDER; WATER BLASTING | $26.05 | $10.20 | $36.25 Top 10% +41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING SPRAY | $25.80 | $10.20 | $36.00 Top 10% +40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER NEW COMMERCIAL WORK GROUP 1- BRUSH; SPRAY & SANDBLASTING POT TENDER. REPAINT IS 90% OF GROUP RATE | $33.66 | $23.88 | $57.54 Top 10% +123% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BASE RATE | $24.83 | $10.00 | $34.83 Top 10% +35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRIDGE EQUIPMENT TENDERS AND CONTAINMENT BUILDERS | $27.93 | $7.25 | $35.18 Top 10% +36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRIDGES | $37.26 | $15.16 | $52.42 Top 10% +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRIDGES, LOCKS, DAMS & TENSION TOWERS | $27.83 | $10.00 | $37.83 Top 10% +47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRIDGES, LOCKS, DAMS, TENSION TOWERS & ENERGIZED SUBSTATIONS | $36.09 | $19.49 | $55.58 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRIDGES; BLASTERS; AND RIGGERS | $34.60 | $7.25 | $41.85 Top 10% +62% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRIDGES; LOCKS; DAMS; TENSION TOWERS; & ENERGIZED SUBSTATIONS | $36.44 | $24.46 | $60.90 Top 10% +136% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRIDGES; TOWERS, POLES & STACKS; SANDBLASTING STEEL; STRUCTURAL STEEL & METALIZING | $33.18 | $18.15 | $51.33 Top 10% +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH & ROLLER | $31.93 | $18.15 | $50.08 Top 10% +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH & ROLLER ALL SURFACES 40 FT. OR OVER WHERE MATERIAL IS APPLIED TO OR LABOR PERFORMED ON, ABOVE GROUND LEVEL, FLOOR LEVEL - $.50 PREMIUM | $27.59 | $18.54 | $46.13 Top 10% +79% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND ROLLER | $20.93 | $7.25 | $28.18 +9% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH; ROLLER | $30.20 | $15.16 | $45.36 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: DRYWALL FINISHING & TAPING: LL SURFACES 40 FT. OR OVER WHERE MATERIAL IS APPLIED TO OR LABOR PERFORMED ON, ABOVE GROUND LEVEL, FLOOR LEVEL | $28.34 | $18.54 | $46.88 Top 10% +82% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: GROUP 1- BRIDGE EQUIPMENT TENDER; BRIDGE/CONTAINMENT BUILDER | $21.95 | $10.20 | $32.15 Top 10% +25% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: GROUP 1- PAINTERS, BRUSH & ROLLER | $30.64 | $18.36 | $49.00 Top 10% +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: GROUP 1: BRUSH & ROLLER | $29.15 | $13.97 | $43.12 Top 10% +67% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: GROUP 2- BRIDGES | $40.27 | $18.36 | $58.63 Top 10% +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: GROUP 2- BRUSH & ROLLER | $25.30 | $10.20 | $35.50 Top 10% +38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: GROUP 2- BRUSH; ROLLER; POWER TOOLS, UNDER 40 FEET..$ 35.02 21.54 PAINTER: GROUP 1- CONTAINMENT BUILDER | $33.32 | $21.54 | $54.86 Top 10% +113% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: GROUP 2: SWING, SCAFFOLD BRIDGES; STRUCTURAL STEEL; OPEN ACID TANK; HIGH TENSION ELECTRICAL EQUIPMENT; & HOT PIPES | $33.09 | $13.97 | $47.06 Top 10% +82% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: GROUP 3- SAND BLASTING; SPRAY; STEAM CLEANING; PRESSURE WASHING; EPOXY & TWO COMPONENT MATERIALS; LEAD ABATEMENT; HAZARDOUS WASTE; TOXIC MATE | $36.72 | $21.54 | $58.26 Top 10% +126% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: GROUP 3- SPRAY | $25.80 | $10.20 | $36.00 Top 10% +40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: GROUP 3- STRUCTURAL STEEL | $40.27 | $18.36 | $58.63 Top 10% +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: GROUP 3: SPRAY; SANDBLAST; STEAMCLEAN; LEAD ABATEMENT | $29.90 | $13.97 | $43.87 Top 10% +70% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: GROUP 4- SANDBLASTING; & WATERBLASTING | $26.05 | $10.20 | $36.25 Top 10% +41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: GROUP 4- SPRAY, EXCEPT BAR JOIST/DECK | $31.14 | $18.36 | $49.50 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: GROUP 4- STACKS; BRIDGES | $40.03 | $21.54 | $61.57 Top 10% +139% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: GROUP 4: STEEPLEJACK WORK | $30.10 | $13.97 | $44.07 Top 10% +71% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: GROUP 5- ELEVATED TANKS; STEEPLEJACK WORK; BRIDGE; & LEAD ABATEMENT | $26.30 | $10.20 | $36.50 Top 10% +42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: GROUP 5- EPOXY/MASTIC; SPRAY- BAR JOIST/DECK; WORKING ABOVE 50 FEET; AND SWINGSTAGES | $31.29 | $18.36 | $49.65 Top 10% +93% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: GROUP 5: COAL TAR | $30.65 | $13.97 | $44.62 Top 10% +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: GROUP 6- TANKS; SANDBLASTING | $35.27 | $18.36 | $53.63 Top 10% +108% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: GROUP 7- TOWERS; STACKS | $32.64 | $18.36 | $51.00 Top 10% +98% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: GROUP 8: BRIDGE BLASTER, RIGGER..$ 40.86 13.97 PAINTER: GROUP 7: TANKS, STACKS & TOWERS..$ 33.86 13.97 PAINTER: GROUP 6: BRIDGE EQUIPMENT TEN | $37.86 | $13.97 | $51.83 Top 10% +101% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: LEAD ABATEMENT ALL SURFACES 40 FT. OR OVER WHERE MATERIAL IS APPLIED TO OR LABOR PERFORMED ON, ABOVE GROUND LEVEL, FLOOR LEVEL - $.50 PREMIUM | $29.34 | $18.54 | $47.88 Top 10% +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: NEW COMMERCIAL WORK: GROUP 2- REFINERIES & REFINERY TANKS; SURFACES 30 FT. OR OVER WHERE MATERIAL IS APPLIED TO OR LABOR PERFORMED ON ABOVE G | $34.66 | $23.88 | $58.54 Top 10% +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: NEW COMMERCIAL WORK: GROUP 3- SWING STAGE & CHAIR (FULTON, HENRY, LUCAS, OTTAWA & WOOD) REPAINT IS 90% OF GROUP RATE | $34.66 | $23.88 | $58.54 Top 10% +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: NEW COMMERCIAL WORK: GROUP 4- LEAD ABATEMENT (FULTON, HENRY, LUCAS, OTTAWA & WOOD) REPAINT IS 90% OF GROUP RATE | $34.66 | $23.88 | $58.54 Top 10% +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: NEW COMMERCIAL WORK: GROUP 5- ALL METHODS OF SPRAY (FULTON, HENRY, LUCAS, OTTAWA & WOOD) REPAINT IS 90% OF GROUP RATE | $34.66 | $23.88 | $58.54 Top 10% +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: NEW COMMERCIAL WORK: GROUP 6- SOLVENT-BASED CATALIZED EPOXY MATERIALS OF 2 OR MORE COMPONENT MATERIALS, TO INCLUDE SOLVENT-BASED CONVERSION V | $34.66 | $23.88 | $58.54 Top 10% +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: NEW COMMERCIAL WORK: GROUP 7- SPRAY SOLVENT BASED MATERIAL; SAND & ABRASIVE BLASTING (FULTON, HENRY, LUCAS, OTTAWA & WOOD) REPAINT IS 90% OF | $34.66 | $23.88 | $58.54 Top 10% +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: NEW COMMERCIAL WORK: GROUP 8- TOWERS; TANKS; BRIDGES; STACKS OVER 30 FEET (FULTON, HENRY, LUCAS, OTTAWA & WOOD) REPAINT IS 90% OF GROUP RATE | $34.66 | $23.88 | $58.54 Top 10% +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: NEW COMMERCIAL WORK: GROUP 9- EPOXY SPRAY (FULTON, HENRY, LUCAS, OTTAWA & WOOD) REPAINT IS 90% OF GROUP RATE | $34.66 | $23.88 | $58.54 Top 10% +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: POWER GENERATING FACILITIES | $33.29 | $24.46 | $57.75 Top 10% +124% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: POWER GENERATING FACILITIES | $32.94 | $19.49 | $52.43 Bottom 10% +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SANDBLASTING; STEAM CLEANING; WATERBLASTING; AND HAZARDOUS WORK | $25.82 | $7.25 | $33.07 Top 10% +28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SANDBLASTING; STEAMCLEANING; WATERBLASTING& HAZARDOUS WORK | $32.35 | $15.16 | $47.51 Top 10% +84% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $21.40 | $7.25 | $28.65 +11% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $32.15 | $15.16 | $47.31 Above median +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY, SANDBLASTING PRESSURE CLEANING, & REFINERY ALL SURFACES 40 FT. OR OVER WHERE MATERIAL IS APPLIED TO OR LABOR PERFORMED ON, ABOVE GROUN | $28.34 | $18.54 | $46.88 Top 10% +82% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY; TANK INTERIOR & EXTERIOR | $32.78 | $18.15 | $50.93 Top 10% +97% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: STACKS; TANKS; & TOWERS | $34.46 | $15.16 | $49.62 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: STRUCTURAL STEEL & SWING STAGE | $30.50 | $15.16 | $45.66 Top 10% +77% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: STRUCTURAL STEEL AND SWING STAGE | $25.42 | $7.25 | $32.67 Top 10% +27% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: TANKS; STACKS; AND TOWERS | $28.63 | $7.25 | $35.88 Top 10% +39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: GROUP 1- BRUSH, ROLLER & PAPERHANGER (MEDINA, PORTAGE, AND SUMMIT COUNTIES) | $31.93 | $18.15 | $50.08 Top 10% +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: GROUP 2- EPOXY APPLICATION (MEDINA, PORTAGE, AND SUMMIT COUNTIES) | $32.58 | $18.15 | $50.73 Top 10% +97% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: GROUP 3- SWING SCAFFOLD, BOSUM CHAIR, & WINDOW JACK (MEDINA, PORTAGE, AND SUMMIT COUNTIES) | $32.68 | $18.15 | $50.83 Top 10% +97% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: GROUP 4- SPRAY GUN OPERATOR OF ANY & ALL COATINGS (MEDINA, PORTAGE, AND SUMMIT COUNTIES) | $32.78 | $18.15 | $50.93 Top 10% +97% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: GROUP 5- SANDBLAST, PAINTING OF STANDPIPES, ETC. FROM SCAFFOLDS, BRIDGE WORK AND/OR OPEN STRUCTURAL STEEL, STANDPIPES AND/OR WATER TOWERS (M | $33.18 | $18.15 | $51.33 Top 10% +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: GROUP 6- PUBLIC & COMMERCE TRANSPORTATION, STEEL OR GALVANIZED, BRIDGES, TUNNELS & RELATED SUPPORT ITEMS (MEDINA, PORTAGE, AND SUMMIT COUNTI | $38.60 | $18.15 | $56.75 Top 10% +120% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: GROUP 7- SYNTHETIC EXTERIOR, DRYWALL FINISHER AND/OR TAPER, DRYWALL FINISHER AND FOLLOW-UP MAN USING AUTOMATIC TOOLS (MEDINA, PORTAGE, AND S | $33.18 | $18.15 | $51.33 Top 10% +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVERMAN | $35.94 | $23.59 | $59.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVERMAN | $39.01 | $24.91 | $63.92 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVERMEN & DIVER'S TENDER DIVERS - $250.00 PER DAY | $35.94 | $28.39 | $64.33 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVERMEN & DIVER'S TENDER DIVERS - $250.00 PER DAY | $37.98 | $28.63 | $66.61 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVERMEN; DIVER, DRY | $39.01 | $24.91 | $63.92 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVERMEN; DIVER, DRY | $33.21 | $25.40 | $58.61 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVERMEN; DIVER, DRY | $36.34 | $27.50 | $63.84 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVERMEN; DIVER, DRY | $36.24 | $22.54 | $58.78 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVERMEN; DIVER, DRY | $33.90 | $24.82 | $58.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, MEDINA & SUMMIT) | $49.17 | $28.55 | $77.72 Top 10% +159% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $33.00 | $23.83 | $56.83 Above median +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $31.35 | $17.65 | $49.00 +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $29.63 | $17.11 | $46.74 +54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $28.86 | $17.11 | $45.97 +51% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $28.21 | $17.11 | $45.32 +49% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $36.65 | $25.60 | $62.25 Above median +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $35.29 | $23.07 | $58.36 Above median +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, MEDINA & SUMMIT) | $44.86 | $30.03 | $74.89 Top 10% +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER AND STEAMFITTER (BELMONT & MONROE) | $35.94 | $37.35 | $73.29 Top 10% +144% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER AND STEAMFITTER (MEDINA, PORTAGE, AND SUMMIT COUNTIES) | $46.87 | $28.39 | $75.26 Top 10% +150% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, PIPEFITTER, STEAMFITTER | $43.02 | $26.45 | $69.47 +131% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, PIPEFITTER, STEAMFITTER | $51.00 | $32.56 | $83.56 Top 10% +178% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, PIPEFITTER, STEAMFITTER | $43.05 | $27.18 | $70.23 +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, PIPEFITTER, STEAMFITTER | $53.00 | $27.59 | $80.59 Above median +168% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, PIPEFITTER, STEAMFITTER | $42.65 | $28.56 | $71.21 Above median +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, PIPEFITTER, STEAMFITTER | $42.76 | $30.81 | $73.57 Above median +145% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, PIPEFITTER, STEAMFITTER (CARROLL, COLUMBIANA, COSHOCTON, GUERNSEY, HARRISON, HOLMES, JEFFERSON, MORGAN, MUSKINGUM, NOBLE, AND TUSCARAWAS COUN | $39.32 | $37.60 | $76.92 Top 10% +156% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER | $43.30 | $27.40 | $70.70 Above median +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER (CARROLL, STARK, AND WAYNE COUNTIES) | $47.48 | $27.14 | $74.62 Top 10% +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER (COLUMBIANA, MAHONING AND TRUMBULL COUNTIES) | $40.55 | $29.25 | $69.80 Top 10% +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER (MEIGS, MONROE, MORGAN & WASHINGTON) | $40.92 | $37.20 | $78.12 Top 10% +160% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1 (ADAMS, ALLEN, ASHLAND, ATHENS, AUGLAIZE, BELMONT, BROWN, BUTLER, CARROLL, CHAMPAIGN, CLARK, CLERMONT, CLINTON, COSHO | $44.14 | $16.41 | $60.55 Top 10% +102% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1 AIR COMPRESSOR ON STEEL ERECTION; BARRIER MOVING MACHINE; BOILER OPERATOR ON COMPRESSOR OR GENERATOR WHEN MOUNTED ON | $45.63 | $16.41 | $62.04 Top 10% +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 2 (ADAMS, ALLEN, ASHLAND, ATHENS, AUGLAIZE, BELMONT, BROWN, BUTLER, CARROLL, CHAMPAIGN, CLARK, CLERMONT, CLINTON, COSHO | $44.02 | $16.41 | $60.43 Top 10% +101% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 2 ASPHALT PAVER; AUTOMATIC SUBGRADER MACHINE, SELF-PROPELLED; BOBCAT TYPE AND/OR SKID STEER LOADER WITH HOE ATTACHMENT | $45.53 | $16.41 | $61.94 Top 10% +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 3 (ADAMS, ALLEN, ASHLAND, ATHENS, AUGLAIZE, BELMONT, BROWN, BUTLER, CARROLL, CHAMPAIGN, CLARK, CLERMONT, CLINTON, COSHO | $42.98 | $16.41 | $59.39 Top 10% +98% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 3 A-FRAME; AIR COMPRESSOR ON TUNNEL WORK; ASPHALT PLANT ENGINEER; BOBCAT-TYPE AND/OR SKID STEER LOADER WITH OR WITHOUT | $44.49 | $16.41 | $60.90 Top 10% +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 4 (ADAMS, ALLEN, ASHLAND, ATHENS, AUGLAIZE, BELMONT, BROWN, BUTLER, CARROLL, CHAMPAIGN, CLARK, CLERMONT, CLINTON, COSHO | $41.80 | $16.41 | $58.21 Top 10% +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 5 (ADAMS, ALLEN, ASHLAND, ATHENS, AUGLAIZE, BELMONT, BROWN, BUTLER, CARROLL, CHAMPAIGN, CLARK, CLERMONT, CLINTON, COSHO | $36.34 | $16.41 | $52.75 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 5 COMPRESSOR; DRUM FIREPERSON; GENERATOR; MASONRY FORK LIFT; INBOARD-OUTBOARD MOTOR BOAT LAUNCH; OIL HEATER; OILER/HELP | $43.27 | $16.41 | $59.68 Top 10% +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 6 (ADAMS, ALLEN, ASHLAND, ATHENS, AUGLAIZE, BELMONT, BROWN, BUTLER, CARROLL, CHAMPAIGN, CLARK, CLERMONT, CLINTON, COSHO | $45.14 | $16.41 | $61.55 Top 10% +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 6 MASTER MECHANIC & BOOM FROM 150 TO 180 | $46.63 | $16.41 | $63.04 Top 10% +110% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 7 (ADAMS, ALLEN, ASHLAND, ATHENS, AUGLAIZE, BELMONT, BROWN, BUTLER, CARROLL, CHAMPAIGN, CLARK, CLERMONT, CLINTON, COSHO | $45.14 | $16.41 | $61.55 Top 10% +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 7 BOOM FROM 180 AND OVER | $46.63 | $16.41 | $63.04 Top 10% +110% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 1- RIG, PILE DRIVER OR CAISSON TYPE; & RIG, PILE HYDRAULIC UNIT ATTACHED | $37.19 | $24.30 | $61.49 Top 10% +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 2 - ASPHALT HEATER PLANER; BACKFILLER WITH DRAG ATTACHMENT; BACKHOE; BACKHOE WITH SHEAR ATTACHED; BACKH | $36.92 | $24.30 | $61.22 Top 10% +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 3 - ASPHALT PLANT; BENDING MACHINE; BORING MACHINE, MOTOR DRIVEN; CHIP HARVESTER WITHOUT BOOM; CLEANING | $32.06 | $24.30 | $56.36 Top 10% +88% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 4 - AIR CURTAIN DESTRUCTOR & SIMILAR TYPE; BATCH PLANT-JOB RELATED; BOILER OPERATOR; COMPRESSOR; CONVEY | $28.77 | $24.30 | $53.07 Top 10% +77% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 5 - BRAKEPERSON; FIREPERSON; & OILER | $25.94 | $24.30 | $50.24 Top 10% +67% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 1 - A & B- RIG, PILE DRIVER OR CAISSON TYPE; & RIG, PILE HYDRAULIC UNIT ATTAC | $44.63 | $24.30 | $68.93 Top 10% +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 2 - A & B - ASPHALT HEATER PLANER; BACKFILLER WITH DRAG ATTACHMENT; BACKHOE | $44.30 | $24.30 | $68.60 Top 10% +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 4 - A & B - AIR CURTAIN DESTRUCTOR & SIMILAR TYPE; BATCH PLANT-JOB RELATED; B | $34.52 | $24.30 | $58.82 Top 10% +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 5 - A & B - BRAKEPERSON; FIREPERSON; & OILER | $31.13 | $24.30 | $55.43 Top 10% +85% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 1 - C & D - RIG, PILE DRIVER OR CAISSON TYPE; & RIG, PILE HYDRAULIC UNIT ATTACHED | $40.91 | $24.30 | $65.21 Top 10% +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 2 - C & D - ASPHALT HEATER PLANER; BACKFILLER WITH DRAG ATTACHMENT; BACKHOE; BACKHOE WI | $40.61 | $24.30 | $64.91 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 4 - C & D - AIR CURTAIN DESTRUCTOR & SIMILAR TYPE; BATCH PLANT-JOB RELATED; BOILER OPER | $31.65 | $24.30 | $55.95 Top 10% +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 5 - C & D - BRAKEPERSON; FIREPERSON; & OILER | $28.53 | $24.30 | $52.83 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| REFRACTORY | $31.45 | $19.01 | $50.46 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| SHALL BE ADDED TO THE RATE OF PAY FOR THE CLASSIFICATION OF WORK: WHILE WORKING SWINGSTAGE, BOATSWAIN CHAIR, NEEDLE BEAM AND HORIZONTAL CABLE. WHILE O | $30.73 | $17.52 | $48.25 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| SHALL BE ADDED TO THE RATE OF PAY FOR THE CLASSIFICATION OF WORK: WHILE WORKING SWINGSTAGE, BOATSWAIN CHAIR, NEEDLE BEAM AND HORIZONTAL CABLE. WHILE O | $29.13 | $17.52 | $46.65 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| SOUND & COMMUNICATION TECHNICIAN | $24.35 | $10.99 | $35.34 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| SOUND & COMMUNICATION TECHNICIAN: INSTALLER/TECHNICIAN (CLINTON, DARKE, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN) | $27.70 | $15.71 | $43.41 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TANKS - WATER TOWERS; BRIDGE PAINTERS; BRIDGE RIGGERS; CONTAINMENT BUILDERS (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE & SUMMIT) | $31.45 | $18.95 | $50.40 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TO OR LABOR PERFORMED ON, ABOVE GROUND LEVEL, FLOOR LEVEL - $.50 PREMIUM APPLYING COAL TAR PRODUCTS - $1.00 PREMIUM | $28.34 | $18.54 | $46.88 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 1- ASPHALT DISTRIBUTOR; BATCH; 4- WHEEL SERVICE; 4-WHEEL DUMP; OIL DISTRIBUTOR & TANDEM | $34.26 | $18.85 | $53.11 Top 10% +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 1- STRAIGHT & DUMP, STRAIGHT FUEL | $34.92 | $19.30 | $54.22 Top 10% +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 2- SEMI FUEL, SEMI TRACTOR, EUCLIDS, DARTS, TANK, ASPHALT SPREADERS, LOW BOYS, CARRY-ALL, TOURNA-ROCKERS, HI-LIFTS, EXTRA LONG TRA | $35.73 | $19.30 | $55.03 Top 10% +97% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 2- TRACTOR-TRAILER COMBINATION: FUEL; POLE TRAILER; READY MIX; SEMI-TRACTOR; & ASPHALT OIL SPRAYBAR MAN WHEN OPERATED FROM CAB; 5 | $35.26 | $18.85 | $54.11 Top 10% +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Noble, OH — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Noble
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Noble, Ohio.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.